Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: May 16, 2016 Permit status: Active | Permit id: 692342 | |||||
Alteration permit Date: April 29, 2016 Permit status: Active | Permit id: 687693 | |||||
Mechanical permit Date: September 6, 2016 Permit status: Active | Permit id: 718803 | |||||
Plumbing permit Date: June 2, 2016 Permit status: Active | Permit id: 696961 | |||||
Plumbing permit Date: June 2, 2016 Permit status: Completed | Permit id: 696961 | |||||
Alteration permit Date: April 29, 2016 Permit status: Completed | Permit id: 687693 | |||||
Mechanical permit Date: September 6, 2016 Permit status: Completed | Permit id: 718803 | |||||
Electrical permit Date: May 16, 2016 Permit status: Expired | Permit id: 692342 | |||||
SCORE 89 Ez interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start Date: April 29, 2016 Contractor: Mga Construction Llc Client: Brown Ryan | Permit type: Alteration permit | Permit status: Completed | Completion date: January 31, 2017 | Permit id: 687693 | |||||
SCORE 100 Install 100amp service,meter socket panel and grounding,run wires,install junction boxes,sws,outlets,gfcis,lights,smokes, and run 220v lines for water heater and dryer per 2008 nec (sfd) Date: May 16, 2016 Contractor: Alpha Technology Enterprise Client: Brown Ryan | Permit type: Electrical permit | Permit status: Completed | Completion date: January 31, 2017 | Permit id: 692342 | |||||
SCORE 97 2 toilets,2 lav sinks,1 bath tub,1 kitchen sink,1 laundry and 1 water heater (sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: June 2, 2016 Contractor: Richard Lawrence Client: Brown Ryan | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 18, 2017 | Permit id: 696961 | |||||
SCORE 89 Installation of (1) heat pump system (including ductwork and all associated accessories). Sfd Date: September 6, 2016 Contractor: Andrius Rarkevicius Inc Client: Brown Ryan | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 18, 2017 | Permit id: 718803 | |||||
SCORE 97 Hd, ct, fai, 5"lateral, 2-1"ws pa20162760224 self certification no longer accepted all trenches in excess of 5 ft must have approved shoring at the time of inspection. And area drain & hwh & 14 fixtures the installation will comply with the philadelphia plumbing code 2004 Date: October 3, 2016 Contractor: Richard Lawrence Client: Brown Ryan | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 15, 2017 | Permit id: 726547 |