Content |
---|
Public hall: as per the requirement contract with hpd, repair 3 window guards in public hallway. Remove all work related debris. Contractor ![]() Permit type: Gc | Permit id: Ed24847 |
Apt 3f: as per the requirement contract with hpd, provide and install 2 window guards throughout entire apartment. Remove all work related debris ![]() Permit type: Gc | Permit id: Ed24848 |
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb32514 |
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb27058 |
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb26753 |
Doh abatement: rm # 1 apartment hallway from 2nd floor public hallway 1. Center baseboard on wall # 2 entire baseboard center baseboard ![]() ![]() Permit type: Delead | Permit id: Eb18106 |
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb16084 |
Apt#1f : install bathroom window guard . Reiinstall bedroom &living room window guards. ![]() ![]() Permit type: Gc | Permit id: Eb15947 |
At building: apt 2f repair damage bedroom ceiling with similar material approximately s. F including painting. Remove work related debris. N ![]() Permit type: Gc | Permit id: Eb14318 |
Apt 2f supply and install one window guard complete in the bedroom. ![]() ![]() Permit type: Gc | Permit id: Eb14319 |