Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Replaced stacks, 2 toilets, 2 lavs, 1 tub, 1 kitchen sink, 1 dishwasher and 1 garbage disposal. The installation will comply with the philadephia plubming code 2004 Date: July 17, 2017 Contractor: Anc Plumbing Inc Client: Bgf Holdings Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: September 8, 2017 | Permit id: 800261 | |||||
SCORE 90 Replace 2 amp service & rewire throughout as per nec 2008 south district Date: July 11, 2017 Contractor: Davis David L Client: Bgf Holdings Llc | Permit type: Electrical permit | Permit status: Active | Completion date: July 11, 2017 | Permit id: 798817 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 11, 2017 Contractor: Alek Air Management Inc Client: Bgf Holdings Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: September 8, 2017 | Permit id: 798757 | |||||
Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 7, 2017 Client: Bgf Holdings Llc | Permit type: Alteration permit | Permit status: Active | Completion date: September 8, 2017 | Permit id: 797839 |