Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Local law #1 violation : as per rc #2003002580603 (pdg). And attached scope of work thoroughly remove all lead violations as per new york city admini Date: November 18, 2004 Permit type: Delead | Permit id: E512786 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: October 13, 2005 Permit type: Delead | Permit id: E610535 | |||||
Apt1) repair the leaks above the private hallway and the kitchen ceiling. Restore the ceilings and walls to the original condition. Swp child 6yrs Date: September 18, 2006 Permit type: Gc | Permit id: E708004 | |||||
SCORE 96 Equipment work Date: January 24, 1997 Contractor: Ceg Plumbing And Heating Corp Permit status: Permit issued | Permit id: 30060769901 | |||||
SCORE 100 Equipment work Date: January 15, 1997 Contractor: Novalex Mdg Jv Permit status: Permit issued | Permit id: 30053067302 | |||||
SCORE 100 Equipment work Date: October 3, 1996 Contractor: Novalex Mdg Jv Permit status: Permit issued | Permit id: 30053067301 | |||||
1st floor public hall stairs leading to court yard: install two marble treads ; (1) nosing tread and (1) tread. Note: contractor must contact hpd Date: February 14, 2006 Permit type: Gc | Permit id: E624562 | |||||
At roof skylight replace broken glass panels. Remove all work related debris. Contractor must sign and return bid. Note: contractor m Date: January 9, 2012 Permit type: Gc | Permit id: Ec16889 | |||||
Public area: at public hall stairs intermediate landing: re-place two (2) defective marble treads, #1 and #4 from bottom up between 2nd and 3rd floor. Date: February 14, 2008 Permit type: Gc | Permit id: E822465 | |||||
At public area: replace existing wooden tread with new marble tread the 6th up from 2nd intermediate landing at 3rd story of public hall (staircase-b Date: April 10, 2008 Permit type: Gc | Permit id: E828678 | |||||
Public area: replace two (2) missing metal steps at rear egress of building. Remove all work related debris. Note: contractor must contact hpd @ Date: July 27, 2007 Permit type: Gc | Permit id: E802706 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: April 10, 2010 Permit type: Delead | Permit id: Ea32296 | |||||
Apt #11) at living room : install (1) window guard and stops. Remove all work related debris. Date: June 9, 2008 Value: $95 Permit type: Gc | Permit id: E834588 | |||||
Public area : at entrance ddor to public hall : re-install (1) hinges. Remove all work related debris. Date: July 28, 2008 Value: $272 Permit type: Gc | Permit id: E904318 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: July 25, 2008 Permit type: Delead | Permit id: E904230 | |||||
Apt # 12 living room: remove & reinstall 2 window guards & install stops. Kitchen: remove and reinstall 1 window guard and install stops. Date: April 28, 2006 Value: $223 Permit type: Gc | Permit id: E632192 | |||||
Apt.#1: kitchen install (4) one way screws and (2) window stops with one way screws. Kids bedroom install (4) one way screws and (2) window stops. Date: September 19, 2005 Value: $123 Permit type: Gc | Permit id: E608591 | |||||
Apartment #11: boiler room: adjust scalding hot water. Date: October 31, 2005 Permit type: Plumb | Permit id: E612942 | |||||
At building, front entrance door to building, properly replace with new the broken concrete door saddle. Date: October 28, 2016 Permit type: Gc | Permit id: Eh05656 | |||||
SCORE 100 Equipment work Date: January 15, 1997 Contractor: Novalex Mdg Jv Permit status: Permit issued | Permit id: 30053067302 | |||||
SCORE 100 Equipment work Date: October 3, 1996 Contractor: Novalex Mdg Jv Permit status: Permit issued | Permit id: 30053067301 | |||||
As per rc #2007001232501 (enviro-probe, inc.), perform total lead analysis of 7 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: March 1, 2007 Permit type: Delead | Permit id: E723162 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: September 8, 2006 Permit type: Delead | Permit id: E707223 | |||||
Apt 20: as per the requirement contract with hpd, provide and install 2 window guards throughout entire apartment. Remove all work related debris Date: September 19, 2013 Permit type: Gc | Permit id: Ee05909 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: May 19, 2003 Permit type: Gc | Permit id: E322597 | |||||
As per rc #2007003354201 (i. A. T. L.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-7420 Date: April 11, 2007 Permit type: Delead | Permit id: E727043 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 3, 2008 Permit type: Delead | Permit id: E907523 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: January 1, 2006 Permit type: Delead | Permit id: E618982 | |||||
Apt #11) at master bedroom : replace damaged ceiling with 5/8 waterproof dry wall, tape, prime and paint in two coats 8x4. Remove all work relate Date: August 5, 2008 Permit type: Gc | Permit id: E904316 | |||||
Apt #11) at master bedroom : replace damaged ceiling with 5 8 waterproof dry wall, tape, prime and paint in two coats 8x4. Remove all work relate Date: August 5, 2008 Permit type: Gc | Permit id: E904316 |