Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace furnace and ac and duct work for existing sfd. Date: July 22, 2014 Permit type: Mechanical : 80 - ac | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd no. Of modules: 10 no. Of inverters: 1 total system size in kilowatts: 2. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 4, 2010 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 7, 2010 | Permit id: Pds2010-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 2. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 4, 2010 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 7, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 82 Replace furnace and ac and duct work for existing sfd. Date: July 22, 2014 Contractor: Bil Howe Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 2. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 4, 2010 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 7, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 92 22 s. F. Reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp-> cool roof manufacturer owening corning brand and model tru definition duration color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) cool roof 0890-0009 note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: January 31, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: April 5, 2010 Permit status: Pass | Permit id: Pds2010-1031-20 |