Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 23, 2014 Contractor: Gilbert Daniel Correia Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 23, 2014 Contractor: Sunrun Installation Services Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2014-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 9, 2016 Contractor: Zero Energy Contracting Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 5, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 5, 2016 Contractor: Accurate Comfort Systems Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 23, 2016 | Permit id: Pds2016-Resalt- | |||||
Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: June 19, 2017 Permit type: Addn | Permit status: Completed | Completion date: June 22, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 - 27 sqft re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material concrete tile proposed roofing material comp shingles manufacturer owens corning brand and model duration color (if cool roof required) sierra grey built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) n a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: August 2, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: November 22, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: July 20, 2017 Permit status: Cancel | Permit id: Pds2017-Resalt- |