Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: December 13, 2011 Client: Bachmann Industries Inc | Permit status: Completed | Permit id: 378465 | |||||
Alteration permit Date: December 6, 2013 Client: Bachmann Industries Inc | Permit status: Completed | Permit id: 509975 | |||||
Alteration permit Date: December 6, 2013 Client: Bachmann Industries Inc | Permit status: Completed | Permit id: 509975 | |||||
Alteration permit Date: December 13, 2011 Client: Bachmann Industries Inc | Permit status: Completed | Permit id: 378465 | |||||
SCORE 98 Remove scaling brick work at facade, between 3rd and 4th levels, and replace with new brick work. Non structural facade (wall) repairs only. No other work allowed under this permit. Date: December 13, 2011 Contractor: Walter Olsen Client: Bachmann Industries Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2012 | Permit id: 378465 | |||||
SCORE 89 Alteration:proposed new cast iron piping internal to two building and new pvc pipe downspouts outside the two buildings to direct all roof drains to a new subsurface retorfit storm waster basin in the rear of the peoperty. Replacing interior piping to roof drains on set of plan for a p 760692 and 760697 Date: June 5, 2017 Contractor: City Plumbing Llc Client: Bachmann Industries Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 760692 | |||||
SCORE 98 Remove brickwork at roof level and replace with new steel angle and new brickwork veneer. Date: December 6, 2013 Contractor: Walter Olsen Client: Bachmann Industries Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 8, 2014 | Permit id: 509975 |