Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Flush mount solar pv system Date: August 18, 2006 Contractor: Mark Fuller Client: David Parma,Kathleen Parma | Applicant: Mark Fuller | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d | |||||
SCORE 100 Cosmetic upgrade of existing 119 s. F. Master bathroom. Replace all bath fixtures and finishes, all fixtures to be replaced in same location. No structural modifications part of this permit. Shower pan preformed. Date: August 2, 2013 Contractor: Batco Homes Inc Client: Kathleen Parma | Applicant: Batco Homes Inc | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: November 12, 2013 | Current use: Single family d | |||||
SCORE 100 Cosmetic upgrade of existing 119 s. F. Master bathroom. Replace all bath fixtures and finishes, all fixtures to be replaced in same location. No structural modifications part of this permit. Shower pan preformed. Client: Kathleen Parma | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: November 12, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03731 | |||||
SCORE 100 Remodel 467 s. F. Of main level in residence, including relocation of kitchen, remove 2 gas fireplaces and set 1 replacement gas fireplace, install new window in bay projection, replace existing windows, associated trim and finishes, electrical, mechanical and plumbing work. Client: Kathleen Parma | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 20, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-05442 | |||||
SCORE 89 Flush mount solar pv system Client: David Parma | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-03431 |