Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 15-2179: revision includes fireplace structural support and over flow plumbing at residential patio. Date: January 25, 2016 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00054 | |||||
SCORE 100 Residential build out of the fourth floor (4831 sf). Scope of work includes new hvac equipment on the roof. Utilities under shell permit. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02179 | |||||
SCORE 100 13000-02317: revision to storm drain alignment Date: November 12, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00666 | |||||
SCORE 100 14000-01808: interior revisions to the shell. Scope of work includes showing the antenna closet, added details for bathroom ceiling soffit, added finish and accessory schedule, in the restroom added finish and layout plan, add enlarged ceiling plan, and millwork plan. Date: October 16, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00610 | |||||
SCORE 100 13-2317: 1.) eliminate stair at roof. 2.) eliminate garage exhaust enclosure 3.) add das closet 4.) revised lighting 5.) revised 3rd floor windows west facade. 6.) update rooftop equipment. 7.) added lobby finishes. Date: September 9, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00523 | |||||
SCORE 100 132317: deferred glazing Date: June 29, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00378 | |||||
SCORE 100 13-2317: deferred light gauge metal framing. Date: March 17, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00157 | |||||
SCORE 100 Core and shell includes 4 levels above grade for mixed use; first 3 levels commercial and 4th for residential. Includes 3 levels below grade parking. Tenant improvements under separate permits. Valuation increased on main permit for 15rev-00134 by 250k and associated fees collected. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02317 | |||||
SCORE 100 14-1808: revised restroom and associated mep and other clarification. Date: March 4, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00133 | |||||
SCORE 100 13-2317: revision application includes added scope fro restroom buildouts at 2nd and 3rd floor and associated revised bathroom design at basement level. Includes curb clarification at garage. Revised entry on ground floor and entry cover. Change residential from dual unit to single with associated exterior. Separate permit for residential layout. Clarification backflow device location with enclosure. Valuation increased on main permit by for 15rev-00134 by 250k and associated fees collected. Date: March 4, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00134 | |||||
SCORE 100 14-2317: revised utilities and sewer drains. Date: February 5, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00066 | |||||
SCORE 100 13-2317 : deferred submittal for skin handset stone associated calcs Date: December 1, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00722 | |||||
SCORE 100 14-2317 - deferred stair 1 railings design and calcs Date: December 1, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00720 | |||||
SCORE 100 13-2317 - deferred stair 1 &2 design and stair #2 railings. Date: December 1, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00721 | |||||
SCORE 100 14-2317 storm drainage clarification at alley. Date: December 1, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00719 | |||||
SCORE 100 13-2317: deferred glazing; store front window system drawings and associated calcs. Date: December 1, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00723 | |||||
SCORE 100 13-2317: revised design per list includes mechanical shaft at rear clarification height and elevator dimension change. Revised egress and plumbing, electrical and utitlities. Date: June 20, 2014 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00366 | |||||
SCORE 100 U&o and office tenant improvement for "hamilton management". Firm to occupy 6300sf on ground floor. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01808 | |||||
SCORE 100 Temp power Date: August 30, 2013 Contractor: Devcon Construction Incorporated Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02318 | |||||
SCORE 86 Exterior lighting and electrical for light pole. Scope of work changed and restriping of outdoor parking lot to be issued under a separate permit Date: January 26, 2012 Contractor: Howell Electric Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00218 |