Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning permit Date: July 10, 2007 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 86159 | |||||
Addition permit Date: October 5, 2007 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 99754 | |||||
Electrical permit Date: September 3, 2009 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 235409 | |||||
Electrical permit Date: September 3, 2009 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 235409 | |||||
Addition permit Date: October 5, 2007 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 99754 | |||||
Zoning permit Date: July 10, 2007 Client: Ezeife Nkemdilim | Permit status: Completed | Permit id: 86159 | |||||
SCORE 100 All racking and electrical installation for 1,2 kw pv solar system. 4-solarworld sw300panels,4-solaredge optimizers p320,1-solaredge se 3000h-us inverter. All done per 690. 4(d) . All labeling to nec 690&705 requirements. Date: November 2, 2017 Contractor: Joseph Kiss Client: Ezeife Nkemdilim | Permit type: Electrical permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 829017 | |||||
SCORE 100 Total re wire of single family dwelling using existing 100amp service, 22 switches, 48 lights, 2 - 20amp 120v, 1 - 15amp 120v, 2 - 30amp 220v circuits, phone cable and 8 smokes as per 2005 nec (south district) Date: September 3, 2009 Contractor: Bruce Dagostino Jr Client: Ezeife Nkemdilim | Permit type: Electrical permit | Permit status: Completed | Completion date: June 14, 2010 | Permit id: 235409 | |||||
For the erection of a 3rd floor addition 16x 186" with an open deck at 2nd rear roof 16x 66" as part of an existing single family dwelling Date: July 10, 2007 Client: Ezeife Nkemdilim | Permit type: Zoning permit | Permit status: Completed | Completion date: July 10, 2007 | Permit id: 86159 | |||||
3rd floor addition . Roof deck Date: October 5, 2007 Client: Ezeife Nkemdilim | Permit type: Addition permit | Permit status: Completed | Completion date: May 11, 2010 | Permit id: 99754 |