Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: November 4, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 365474 | |||||
Mechanical permit Date: December 14, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 427364 | |||||
Administrative permit Date: May 23, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 473029 | |||||
Plumbing permit Date: September 6, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 484478 | |||||
Electrical permit Date: August 30, 2016 Client: Philadelphia Healthcare | Permit status: Active | Permit id: 711775 | |||||
Addition permit Date: February 19, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 446511 | |||||
Alteration permit Date: February 12, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 663848 | |||||
Suppression permit Date: February 24, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 671891 | |||||
Suppression permit Date: March 22, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 323445 | |||||
Electrical permit Date: April 13, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 602318 | |||||
Zoning/use permit Date: January 7, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 442924 | |||||
Addition permit Date: November 3, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 639689 | |||||
Electrical permit Date: September 30, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 302471 | |||||
Operations permit Date: May 14, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 22327 | |||||
Zoning/use permit Date: August 7, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 416570 | |||||
Administrative permit Date: April 24, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 401062 | |||||
Electrical permit Date: October 2, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 556734 | |||||
Plumbing permit Date: September 13, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 361383 | |||||
Electrical permit Date: February 18, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 324736 | |||||
Suppression permit Date: February 12, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 519501 | |||||
Alteration permit Date: October 21, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 366236 | |||||
Mechanical permit Date: January 30, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 509553 | |||||
Addition permit Date: October 19, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 425300 | |||||
Suppression permit Date: May 31, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 474660 | |||||
Electrical permit Date: November 7, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 503285 | |||||
Zoning/use permit Date: September 14, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 631150 | |||||
Suppression permit Date: April 20, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 387807 | |||||
Mechanical permit Date: October 15, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 484418 | |||||
Alteration permit Date: June 11, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 539454 | |||||
Addition permit Date: July 18, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 350752 | |||||
Plumbing permit Date: September 23, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 723959 | |||||
New construction permit Date: October 19, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 426517 | |||||
Operations permit Date: September 23, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 23160 | |||||
Zoning/use permit Date: July 1, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 348573 | |||||
Zoning/use permit Date: September 14, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 298484 | |||||
Electrical permit Date: December 13, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 442579 | |||||
Plumbing permit Date: October 10, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 427689 | |||||
Suppression permit Date: January 8, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 565994 | |||||
Operations permit Date: May 15, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 21624 | |||||
Demolition permit Date: December 27, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 513092 | |||||
Alteration permit Date: October 21, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 489073 | |||||
Alteration permit Date: December 30, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 318153 | |||||
Operations permit Date: September 27, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 21164 | |||||
Mechanical permit Date: January 19, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 660052 | |||||
Zoning/use permit Date: September 12, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 554733 | |||||
New construction permit Date: November 10, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 370358 | |||||
Operations permit Date: May 26, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 23517 | |||||
Alteration permit Date: December 22, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 656915 | |||||
Administrative permit Date: December 12, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 579402 | |||||
Plumbing permit Date: October 17, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 559311 | |||||
Administrative permit Date: September 22, 2016 Client: Philadelphia Healthcare | Permit status: Active | Permit id: 716287 | |||||
Alteration permit Date: October 19, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 429814 | |||||
On 6/12/14 department of licenses and inspections issued notice of refusal for application #529224. Date: June 24, 2014 Client: Philadelphia Healthcare | Applicant: Cancer Treatment Centers Of America (ctca) | Permit type: Appeal | Permit id: 23127 | |||||
Electrical permit Date: June 5, 2007 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 80812 | |||||
Zoning permit Date: November 13, 2009 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 245273 | |||||
Operations permit Date: June 12, 2007 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 1302 | |||||
Plumbing permit Date: February 5, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 259063 | |||||
Zoning/use permit Date: November 20, 2009 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 247989 | |||||
Electrical permit Date: January 11, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 254471 | |||||
Suppression permit Date: September 5, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 164263 | |||||
New construction permit Date: June 4, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 281388 | |||||
Suppression permit Date: May 18, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 265329 | |||||
Fast form building permit Date: April 9, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 144447 | |||||
Mechanical permit Date: January 6, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 249580 | |||||
Alteration permit Date: January 6, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 249127 | |||||
Electrical permit Date: April 9, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 138010 | |||||
Zoning/use permit Date: June 10, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 275530 | |||||
Sign permit Date: June 21, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 285643 | |||||
Electrical permit Date: December 22, 2009 Client: Philadelphia Healthcare P | Permit status: Expired | Permit id: 250750 | |||||
Permit for legalization of the erection of seven (7) accessory signs (five (5) flat wall signs and two (2) double faced free standing signs) all accessory to an existing hospital (cancer treatment center) with accessory parking as previously approved. Date: May 5, 2010 Client: Philadelphia Healthcare P | Applicant: Christopher E Cummings, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: June 21, 2010 | Permit id: 11649 | |||||
Addition permit Date: February 19, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 446511 | |||||
Suppression permit Date: September 17, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 562417 | |||||
Mechanical permit Date: March 4, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 326707 | |||||
Alteration permit Date: December 22, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 656915 | |||||
Operations permit Date: May 26, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 23517 | |||||
Administrative permit Date: April 24, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 401062 | |||||
Electrical permit Date: June 28, 2013 Client: Philadelphia Healthcare | Permit status: Expired | Permit id: 475967 | |||||
Mechanical permit Date: January 30, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 509553 | |||||
Suppression permit Date: January 20, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 321617 | |||||
Administrative permit Date: July 17, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 483592 | |||||
Electrical permit Date: October 26, 2012 Client: Philadelphia Healthcare | Permit status: Expired | Permit id: 428686 | |||||
Alteration permit Date: February 12, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 663848 | |||||
Zoning use permit Date: March 13, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 593433 | |||||
Mechanical permit Date: December 14, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 427364 | |||||
Suppression permit Date: January 25, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 444761 | |||||
Electrical permit Date: March 3, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 322749 | |||||
Alteration permit Date: June 11, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 539454 | |||||
Addition permit Date: October 19, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 425300 | |||||
Operations permit Date: September 23, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 23160 | |||||
Alteration permit Date: October 21, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 489073 | |||||
Electrical permit Date: March 8, 2016 Client: Philadelphia Healthcare | Permit status: Expired | Permit id: 667230 | |||||
Plumbing permit Date: November 14, 2016 Client: Philadelphia Healthcare | Permit status: Active | Permit id: 734703 | |||||
Plumbing permit Date: February 5, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 450622 | |||||
Plumbing permit Date: August 24, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 359831 | |||||
Alteration permit Date: December 30, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 318154 | |||||
Suppression permit Date: August 16, 2016 Client: Philadelphia Healthcare | Permit status: Active | Permit id: 706322 | |||||
Electrical permit Date: April 7, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 506999 | |||||
Plumbing permit Date: November 30, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 436386 | |||||
Suppression permit Date: January 8, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 565994 | |||||
Alteration permit Date: July 28, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 353073 | |||||
Demolition permit Date: December 27, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 513092 | |||||
Operations permit Date: June 24, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 22418 | |||||
Operations permit Date: September 27, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 21164 | |||||
Mechanical permit Date: October 28, 2016 Client: Philadelphia Healthcare | Permit status: Active | Permit id: 725627 | |||||
Administrative permit Date: September 22, 2016 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 716287 | |||||
Mechanical permit Date: March 12, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 457438 | |||||
Electrical permit Date: January 6, 2015 Client: Philadelphia Healthcare | Permit status: Expired | Permit id: 574888 | |||||
New construction permit Date: November 10, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 370358 | |||||
Zoning use permit Date: August 7, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 416570 | |||||
Suppression permit Date: June 4, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 408858 | |||||
New construction permit Date: April 4, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 386523 | |||||
Addition permit Date: August 24, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 355804 | |||||
Zoning use permit Date: September 12, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 554733 | |||||
Zoning use permit Date: January 7, 2013 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 442924 | |||||
Operations permit Date: May 15, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 21624 | |||||
Addition permit Date: November 3, 2015 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 639689 | |||||
Zoning use permit Date: September 14, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 298484 | |||||
Zoning use permit Date: July 1, 2011 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 348573 | |||||
Administrative permit Date: December 12, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 579402 | |||||
Alteration permit Date: October 19, 2012 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 429814 | |||||
Electrical permit Date: September 30, 2010 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 302471 | |||||
Plumbing permit Date: October 17, 2014 Client: Philadelphia Healthcare | Permit status: Completed | Permit id: 559311 | |||||
On 6 12 14 department of licenses and inspections issued notice of refusal for application #529224. Date: June 24, 2014 Client: Philadelphia Healthcare | Applicant: Cancer Treatment Centers Of America (ctca) | Permit type: Appeal | Permit id: 23127 | |||||
SCORE 100 Run 1-60kw generator to provide power for sound and light for fundraiser dinner event on 5 19 16 and 5 20 16. Equipment must be inspected by third party agency as per 2008 nec (cc district) Date: May 2, 2016 Contractor: Earl B Larue Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: May 2, 2016 | Permit id: 688630 | |||||
SCORE 100 Interior alterations, partial interior demo and upgrades to existing kitchen & saucier areas, new furnishings, doors, finishes, furnishings, equipment as per plans. Date: October 21, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 489073 | |||||
SCORE 100 Interior alterations for new dishwashing replacement equipment as per plans. No construction activity within patient care treatment areas permitted herein. Separate permit reqd for any mech., elec., plumb. & firesupp work. Date: September 8, 2016 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Expired | Completion date: March 16, 2017 | Permit id: 712037 | |||||
SCORE 100 Hvac including ductwork for kitchen equipment renovation as per plans 5 register diffusers Date: October 28, 2016 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 22, 2017 | Permit id: 725627 | |||||
SCORE 100 Ctca - kitchen - install new kitchen fixtures equipment (supplied by owner) including a zurn z1172-11 grease interceptor, (2)floor drains, (1)3-compartment pot utensil sink and (1)sink piped per tables p-506, p-811. 2 & p-904. 7 of the philadelphia plumbing code 2004 Date: November 14, 2016 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 28, 2017 | Permit id: 734703 | |||||
SCORE 100 Installation of mains, lines, and (76) sprinklers to an existing nfpa 13 fire suppresion system on the 1st floor of cancer center. Date: April 3, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 452308 | |||||
SCORE 100 Interior alterations, to include fit-out for infusion therapy as per plans. Date: February 19, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 446514 | |||||
SCORE 100 Installation of new mains, lines and (130) sprinklers in cancer treatment center in accordance with nfpa 13. Date: February 6, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: July 30, 2013 | Permit id: 448676 | |||||
SCORE 100 Relocation and or new diffusers and duct work, accessory mechanicals and piping, connect to existing system, in conjunction with ap322887 Date: March 4, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 2, 2012 | Permit id: 322884 | |||||
Installation of (5) concrete pads, utility equipment and remove configure of parking spaces for an existing multi story hospital complex with open air off street parking spaces including with accessible spaces, loading spaces and approved landingscaping. Date: March 13, 2015 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 13, 2015 | Permit id: 593433 | |||||
SCORE 100 Installation of fire suppression system in accordance with nfpa 13, in the linear accelerator area of cancer center as per approved plans. Date: December 11, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: July 28, 2014 | Permit id: 500048 | |||||
SCORE 100 05 15 2013 erect (2) assembly use tents (1)100x100) (!)20x40) for cancer treatment center - remove 05 18 2013 Date: May 14, 2013 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 22327 | |||||
SCORE 100 06 24 2013 erect assembly tents (1)100x100) (1)30x50) for cancer treatment center of america Date: June 24, 2013 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 22418 | |||||
SCORE 100 05 13 2014 erect assembly tent (100x100) at cancer treatment centers of america Date: May 14, 2014 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 22881 | |||||
SCORE 100 09 25 2014 erect assembly tent (40x60) ermc cancer treatment center of america Date: September 23, 2014 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 23160 | |||||
SCORE 100 05 14 2015 erect assembly tent (100x100) at cancer treatment centers of america Date: May 26, 2015 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 23517 | |||||
For the erection of a slab on grade pad for the installation of 4 generators, for a slab on grade for installation of a ft high oxygen tank, for the erection of a one (1) story addition max height ft for use as a waiting area, all acc to and part of an existing hospital complex with uses as previously approved. Size and location as shown in the application. Existing hospital complex. Date: September 14, 2010 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 298484 | |||||
SCORE 100 Installation of new ductwork, vav boxes, grilles, registers and exhausts throughout a one (1) story section of an existing hospital medical complex. Separate permits required for electrical and plumbing work. Date: October 15, 2013 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 484418 | |||||
SCORE 100 Install new fixtures and associated piping (health care facility) Date: September 6, 2013 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 484478 | |||||
SCORE 100 For the installation of an automatic clean agent fire suppression system [with an fm-2 (hfc-227ea) agent] in accordance with nfpa 2008, standard 2001, to be located in the basement mdf idf room, 2nd floor comm rom, 3rd fl comm rm (bs-001), 3rd fl com room and 5th floor comm rom. Date: August 16, 2016 Contractor: Suppression Systems Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: April 10, 2017 | Permit id: 706322 | |||||
SCORE 100 New 15 kva service feeders for new panels & chillers, new lighting in stair tower & penthouse area new recept in penthouse & roof as per nec 2008 Date: October 26, 2012 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: October 26, 2012 | Permit id: 428686 | |||||
SCORE 100 Fitout of conerstone expansion, phase 2- fitout of quality of life. To construct new quality of life suite. Date: October 19, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 429814 | |||||
SCORE 100 25 lighting fixtures,82 nurse call devices,25 recetacles,1 motion service Date: September 30, 2010 Contractor: Ford Robert Electric Co Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2010 | Permit id: 302471 | |||||
SCORE 100 Interior alterations for new hyperthermia suite per plans Date: December 30, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: March 24, 2011 | Permit id: 318153 | |||||
SCORE 100 Interior alterations within interventional radiology recovery area Date: December 30, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: March 21, 2011 | Permit id: 318154 | |||||
SCORE 95 Renovations to hospital - new hyperthermia unit as per 2008 nec (east dist) Date: March 3, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: May 2, 2011 | Permit id: 322745 | |||||
SCORE 100 New domestic water piping, sanitary and storm for new addition and renovation Date: October 20, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 26, 2012 | Permit id: 365418 | |||||
SCORE 100 Installation of ductwork, mechanicals and related piping Date: November 4, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 365474 | |||||
SCORE 100 Fit out @ 3rd floor for new pharmacy with clean rooms and office support areas. Core and shell constructed under permit #355804. Date: October 19, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 426516 | |||||
SCORE 100 Core and shell for the erection of 2 floors, 4th and 5th penthouse to an existing icu expansion structure as per plans-hospital. Separate permit is require for certificate of occupancy Date: August 23, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 416637 | |||||
SCORE 100 Construct new 1 story addition, include fit-out for radiology unit as per plans. Certificate of occupancy is part of this application Date: May 23, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: April 25, 2014 | Permit id: 461682 | |||||
SCORE 63 Installation of low voltage building automatic system per 2008 nec (health care facility) Date: April 23, 2013 Contractor: General Controls Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: April 23, 2013 | Permit id: 462023 | |||||
SCORE 100 Interior alterations to the physical therapy suite on the first floor as per plans. Date: July 28, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: November 3, 2011 | Permit id: 353073 | |||||
SCORE 100 09 29 2011 erection of (1) assembly use tent Date: September 27, 2011 Contractor: Knight Enterprises Inc Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 21164 | |||||
SCORE 100 05 16 2012 erect four (4) assembly use tent cancer of america (100x100),(30x600,(9x30),(9x30). Remove 05 19 2012 Date: May 15, 2012 Contractor: A To Z Rental Center Client: Philadelphia Healthcare | Permit type: Operations permit | Permit status: Completed | Permit id: 21624 | |||||
SCORE 100 Construct core and shell for 3 story addition as per plans. Foundation permit #350752. Construction type ib & max. 5-sty in the existing building. State file id # 18890101-01. Entire building fully sprinklered. Separate c. O. For addition prior to occupancy. Date: August 24, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: August 16, 2012 | Permit id: 355804 | |||||
SCORE 100 Installation of soil and waste piping, installation of water supply piping, installation of fixtures; 5-lav,1- w. C,1-sink Date: August 24, 2011 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2011 | Permit id: 359831 | |||||
SCORE 100 Install sanitary line Date: September 13, 2011 Contractor: Terry Abrams Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 1, 2012 | Permit id: 361383 | |||||
SCORE 100 Provide install approx (350)flourescent lts fixs,(100)sws, (265)recepts,(8) site ltg fixtures & (8) panels along with (40) nurse call devices (128) fire alarm devices in accordance with nfpa-72 (east dist) Date: January 3, 2012 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2012 | Permit id: 362237 | |||||
SCORE 95 Renovations to hospital patient holding area as per 2008 nec (east dist) Date: March 3, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: March 29, 2011 | Permit id: 322749 | |||||
SCORE 100 Relocation of 25 sprinklers Date: July 26, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: November 3, 2011 | Permit id: 355051 | |||||
For the erection of a concrete pad ( 23x85) for the generator for an existing hospital complex with five-hundred and sixty-seven( 567) accessory off-street parking spaces including with twelve(12) accessible spaces on the same lot all other uses including with signage as previously approved.. Size and location as shown in the application. Date: September 14, 2015 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 14, 2015 | Permit id: 631150 | |||||
SCORE 100 Hvac for core & shell for icu expansion to include installation of three (3) cooling towers, one (1) - 5 ton chiller, and one (1) air handling unit with supplemental mechanical equipment with all associated piping and ductwork as per approved plans. Scope of work to include piping and minor alterations to ductwork on the 1st, 3rd, 4th, and 5th floor. All work shall be done in accordance with approved plans. Date: December 14, 2012 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 427364 | |||||
SCORE 100 Relocate 4 sprinkler heads in the new endoscopy ste. Health facility Date: January 20, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: August 4, 2011 | Permit id: 321617 | |||||
SCORE 100 Replace nurse call equipment, run new wiring as needed, all low voltage work per 2008 nec (heath care facility) Date: June 28, 2013 Contractor: Raff Electric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: June 28, 2013 | Permit id: 475967 | |||||
SCORE 100 Alterations, to include renovation of existing offices, & gallery, as per plans. Relocate fire barrier location so that cafeteria,foremerly within the i-2 fire area, will be located within medical office building fire area. Date: August 22, 2014 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: August 5, 2015 | Permit id: 529224 | |||||
SCORE 100 Surgical fitout consisting of 6 operation rooms and pre and post opt care areas new main distribution panel and branch panel per 2008 nec & nfpa 72 (health care facility) Date: March 4, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 450651 | |||||
SCORE 100 Install sanitary waste and vent, domeswtic hot and cold water piping and fixtures(hospital) Date: February 5, 2013 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 450622 | |||||
SCORE 100 Hospital space that is currently shell space this space shall be fit out with receptacles, lighting, fire alarm and nurse call per 2008 nec (health care facility) Date: March 4, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: July 20, 2013 | Permit id: 450649 | |||||
SCORE 100 Interior demo & alterations, ct replacement, control room, install new equipment & furnishings , finishes, case work and millwork, partitions, flooring, and included mechanical replacements reconfigurations of duct work, air terminals and mechanical piping for floor equipment layout, as per plans. Additional permits required: electrical, plumbing, sprinklers. Date: February 12, 2016 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: March 28, 2016 | Permit id: 663848 | |||||
SCORE 100 Hvac, including ductwork and mechanical equipment for pharmacy fit-out as per plans. Date: December 14, 2012 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 11, 2014 | Permit id: 434477 | |||||
SCORE 100 For the erection of a corrdior to a temporary mobile mri unit, all work to be done per approved plans. Addition to be treated as a separate building (non combustile construction). Separate permit required mechanical, electrical, plumbing and fire supression work. Date: June 12, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 464423 | |||||
SCORE 100 Installation of nfpa 13 sprinkler system as part of health care facility Date: May 14, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 465100 | |||||
SCORE 100 Extension of existing sewers site work (storm & sanitary) health care facility Date: September 11, 2012 Contractor: Terry Abrams Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2013 | Permit id: 424876 | |||||
SCORE 100 Fit-out of cornerstone expansion, phase 2-fit-out of surgery expansion to construct new surgical suite with 6 operating rooms and required support space. Includes fit-out of previosly constructed shell space at 1st floor level. Core and shell constructed under permit #422572 and #355804. Date: October 19, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 425300 | |||||
SCORE 100 Mechanical systems including 2 ahus, vav system, exhaust fans, ductwork and mechanical piping on 5th floor pec and penthouse of new construction as per plans. Date: March 12, 2013 Contractor: Limbach Company Llc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 457434 | |||||
SCORE 100 Interior alterations, to include structural work, for mri ares Date: September 26, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 489074 | |||||
SCORE 100 Temporary certificate of occupancy 1 days. Date: August 16, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: August 21, 2013 | Permit id: 489562 | |||||
SCORE 100 Installation of (2) sprinklers in mobile mri trailer in accordance with nfpa 13 as per approved plans. Date: September 20, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: October 19, 2013 | Permit id: 490103 | |||||
SCORE 100 One floor addition for radiation therapy. Includes 480v & 208v panels lighting,general power. Power and connections for specialized varian true beam medical equipment per 2008 nec. Emergency lighting per article 700. 12(f) of the 2008 nec. Date: September 23, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 23, 2014 | Permit id: 491423 | |||||
SCORE 82 Disconnect existing dishwasher and reinstall new dishwasher with existing feed,provide 5 new light fixtures,remove and reinstall existing devices for mold remediation as per 2008 nec (east district) Date: November 8, 2016 Contractor: Mj Kelly Electric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 722764 | |||||
SCORE 100 Interior alterations, lab analyzer replacement, interior demo, install new equipment & furnishings , finishes, case work and millwork, partitions, flooring per plans. Additional permits required: electrical, plumbing, sprinklers, mechanical Date: July 29, 2016 Contractor: Spring Garden Construction Co Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 708800 | |||||
SCORE 100 T c o 1 days Date: April 24, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: April 26, 2012 | Permit id: 401062 | |||||
For the erection of a slab on grade pad for the generators , for the reduction reconfiguration of parking spaces from 612 spaces to 574 parking spaces including with twelve(12) h c spaces and five(5) existing loading spaces. Size and location as shown in the application. For an existing hospital complex . No sign on this application. Date: September 12, 2014 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 15, 2014 | Permit id: 554733 | |||||
SCORE 100 Install hvac including ductwork as per plans. Registers diffusers Date: August 13, 2014 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Expired | Completion date: May 23, 2016 | Permit id: 554285 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Relocate 9 sprinklers on the 1st floor Date: February 24, 2016 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 671891 | |||||
SCORE 100 Interior alterations for renovation of dishwashing space in kitchen area as per approved plans. Date: May 5, 2016 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: April 10, 2017 | Permit id: 686761 | |||||
SCORE 100 Installation of fire supression system in accordance with nfpa 13 to tie into existing sprinkler system with existing backflow preventer. Date: March 7, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: July 30, 2013 | Permit id: 445086 | |||||
SCORE 100 Install approx. 1 light fixtures switches 2 receptacles 16 vav connection 25 fire alarm devices nurse call devices 1 new 225a panel per 2008 nec & nfpa 72 (health care facility) Date: April 25, 2013 Contractor: Donald A Pusey Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 458777 | |||||
SCORE 100 Mechanical work, to include installation of cogen plant piping to existing system. Install new chiller and pumps, with all associated piping, as per plans. (0)registers diffusers Date: January 19, 2016 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 660052 | |||||
SCORE 100 Exterior alterations patio area, new architectural and ornamental embellishments, new arbor trellis and footings, landscaping upgrades. Separate permit required for fire pit construct installation fuel gas piping. In conjunction with ap622026 563705 approved work to comply case Date: December 22, 2015 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 656915 | |||||
SCORE 100 Run 1-60kw generator for lighting & sound equipment for one day event on 06 27 13 as per nec 2008 (lot) Date: June 19, 2013 Contractor: Earl B Larue Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 478447 | |||||
SCORE 100 180-day tco for infusion therapy Date: July 17, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: July 19, 2013 | Permit id: 483591 | |||||
SCORE 100 180-day tco - 1st floor surgery suite Date: July 17, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: August 9, 2013 | Permit id: 483592 | |||||
SCORE 100 Relocate 43 sprinklers on the 2nd floor icu phase 2 of cancer treatment center of america Date: June 4, 2012 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: October 1, 2012 | Permit id: 408858 | |||||
SCORE 100 Interior alterations, lab analyzer replacement, interior demo, install new equipment & furnishings , finishes, case work and millwork, partitions, flooring, and included mechanical reinstallations of equipment and lab hood, replacements & reconfigurations of diffusers and duct work, reconnecting to existing ducts fans, as per plans. Additional permits required: electrical, plumbing, sprinklers. As per plans. Date: February 12, 2016 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 663849 | |||||
SCORE 100 Reconfigure ductwork from existing vav boxes for medical office. Date: March 4, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 5, 2011 | Permit id: 326707 | |||||
SCORE 100 Int alt for board rm ste on partial 4th floor as per plans. Date: February 17, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: May 16, 2011 | Permit id: 323709 | |||||
SCORE 100 Relocating 31 sprinklers on the 1st floor in the mob boardsuite for hsc Date: February 3, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 2, 2011 | Permit id: 323324 | |||||
SCORE 100 Install 3 sprinkler heads in the the hyperthermia suite for hsc builders Date: March 22, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: April 18, 2012 | Permit id: 323445 | |||||
SCORE 100 Foundation permit only, to include drilling reinforcement placement for drilled pier. Formwork, reinforcement and concrete placement for grade beams and structural foundations as per plans. Date: July 18, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: May 14, 2012 | Permit id: 350752 | |||||
SCORE 95 Relocate fa control panel. Add annunciator and strobe as per 2008 nec Date: August 12, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2012 | Permit id: 352875 | |||||
SCORE 95 Renovation of existing shell space, add new lighting, power as per 2008 nec (east dist) Date: February 18, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: May 2, 2011 | Permit id: 324736 | |||||
SCORE 95 Renovations to hospital patient holding area fire alarm as per nfpa-72 Date: March 24, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2012 | Permit id: 324915 | |||||
SCORE 100 Relocation and or new diffusers,accessory mechanicals and piping, connect to existing system, in conjunction with ap322887 Date: March 4, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 9, 2012 | Permit id: 322880 | |||||
SCORE 100 Add booster panels on 1st floor from existing fire alarm termination panel. Install new a v circuits from booster panels. Extend existing slc circuit to new devices as per nfpa72 (east district) attached drawings with battery calculations and voltage drop calculation Date: October 31, 2014 Contractor: Donald A Pusey Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: October 31, 2014 | Permit id: 564602 | |||||
SCORE 100 Installation of clean agent automatic fire suppression system in accordance with nfpa 2001 in a first floor communications closet per plans. Separate permit required for all electrical work. See permit # 529224 for approved floor plans. Date: January 8, 2015 Contractor: Suppression Systems Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: March 24, 2015 | Permit id: 565994 | |||||
SCORE 100 For the installation of a new hvac ductwork and piping system to include new horizontal shaftwall enclosure installations in corridors, variable air valves, diffusers registers grilles, and new air handling unit. Date: November 10, 2014 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 30, 2016 | Permit id: 559179 | |||||
SCORE 100 Mechanical systems including one ahu, vav system, exhaust fans, ductwork and mechanical piping on 3rd floor infusion and penthouse of new construction as per plans. Date: March 12, 2013 Contractor: Limbach Company Llc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 15, 2013 | Permit id: 457438 | |||||
SCORE 100 For the erection of a concrete foundation pad, to include retaining wall structure, for the installation of a external cogeneration (combined heat and power) plant. Separate mechanical and electrical permits to be required. Date: November 3, 2015 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 639689 | |||||
SCORE 100 Install registers diffusers, piping and mechanicals for stem cell space Date: November 6, 2012 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 26, 2013 | Permit id: 434473 | |||||
SCORE 100 Relocate 2 sprinkler heads in new radiology recovery area. Health facility Date: January 20, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: March 21, 2011 | Permit id: 321613 | |||||
SCORE 100 Extend new notification and indication branch wiring and devices into new addition from existing hospitals current fire alarm system per 2008 nec &nfpa 72 (health care facility) Date: November 29, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: November 29, 2013 | Permit id: 503283 | |||||
SCORE 100 Upgrade of existing mri equipment to newer model rework conduits to match new requirements reuse lighting in space add one new 100amp panel for new receptacles and general power per 2008 nec & nfpa 72 (health care facility) Date: November 7, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 23, 2014 | Permit id: 503285 | |||||
SCORE 100 Install 1-new 1 volt panel, relocation existing transformer, new homeurns & recepts for new kitchen equipment as per nec 2008 (hospital) Date: April 7, 2014 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2014 | Permit id: 506999 | |||||
SCORE 100 Relocate 1 sprinkler in the mammography ste of the cancer treatment center Date: December 20, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: March 21, 2012 | Permit id: 379626 | |||||
SCORE 95 Health care facility-1st fl lobby device relocations as per 2008 nec (east district) Date: January 31, 2012 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: January 31, 2012 | Permit id: 380221 | |||||
SCORE 100 For the extension of the existing standpipes from the 4th floor through to the penthouse in accordance with nfpa 14. Date: April 12, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 459231 | |||||
SCORE 100 Core & shell, for the erection of a 1 story rear addition for expansion of surgical area Date: September 13, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: June 11, 2014 | Permit id: 422572 | |||||
SCORE 100 Remove & dispose two (2) 10,0 gallon #2 fuel oil usts tanks. Install one (1) above ground 8,0 gallon #2 ast including monitoring system with piping. All work to be in accordance with pa d. E. P. Regulations, all applicable codes, nfpa and nfpa 31 Date: April 4, 2012 Contractor: Ycp Inc Client: Philadelphia Healthcare | Permit type: New construction permit | Permit status: Completed | Completion date: October 30, 2012 | Permit id: 386523 | |||||
SCORE 100 Temporary 150amp feed for temporary mri trailer new convenience receptacles, lighting and unit heater will be install in the hallway leading to the mri trailer fire alarm pull station and smoke detectors per 2008 nec & nfpa 72(health care facility) Date: August 15, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 483359 | |||||
SCORE 100 Install of 125 kw generator for tempporary power for sound & video, also under writers inspection - event is friday 6 28 13 one day event as per nec 2008 Date: June 25, 2013 Contractor: Caniglia And Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 479536 | |||||
SCORE 100 For the installation of three (3) automatic clean agent fire suppression systems with three (3) total nozzles for three (3) commercial data rooms in an existing building as per approved plans; installation of fire suppression systems in accordance with nfpa 2001. Date: January 25, 2013 Contractor: Suppression Systems Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: October 19, 2013 | Permit id: 444761 | |||||
SCORE 86 Install 87 cat6 cables to 52 locations on the 21st floor as per articles 300. 21, 300. 22 & 8 of the 2008 nec. Date: January 6, 2015 Contractor: Delaney Telecom Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: January 6, 2015 | Permit id: 574888 | |||||
SCORE 100 Installation of water,sanitary and waste piping for renovation (health care facility) Date: October 17, 2014 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 1, 2016 | Permit id: 559311 | |||||
SCORE 100 Mechanical systems including vav system, exhaust fans, ductwork and mechanical piping on 3rd floor lab of new construction as per plan. Date: March 12, 2013 Contractor: Limbach Company Llc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 457439 | |||||
For the erection of a two (2) story rear addition with penthouse above an existing three (3) story portion (new total of five (5) stories and penthouse). For the erection of a one (1) story rear addition (no basement or cellar). For the erection of a total of eleven (11) rooftop mechanical units. Sizes and locations of additions and mechanical equipment as shown in application plan. This permit shall supersede all approvals granted under zoning use registration permit # 401372, dated july 9, 2012 . Two (2) story addition with penthouse for the expansion of the intensive care unit (icu) and one (1) story rear addition for the expansion of the surgical area of an existing hospital complex with a new total of 612 open-air off-street parking spaces including accessible parking, loading spaces and all other uses as previously approved. No signs this permit. Date: August 7, 2012 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 416570 | |||||
SCORE 100 6 fixtures with piping for bakery Date: December 18, 2013 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 4, 2014 | Permit id: 510313 | |||||
SCORE 100 90-day temporary certificate of occupancy (see bp461682) Date: December 27, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: December 27, 2013 | Permit id: 512601 | |||||
SCORE 100 Install low voltage temperature control wiring per 2008 nec (health care facility) Date: May 7, 2014 Contractor: Devon Electric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 27, 2015 | Permit id: 523362 | |||||
SCORE 100 Interior alterations to include fit-out for new labs as per plans. Date: June 21, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 476887 | |||||
For the erection of one(1) story addition on rear along the north side of the building. Size and location as shown in the application. One(1) story addition for the expansion of the radiology unit ( 6,092 sq ft)of an existing hospital complex with an existing open-air off-street parking spaces including with accessible spaces, loading spaces and all other uses as previously approved. Date: January 7, 2013 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 15, 2014 | Permit id: 442924 | |||||
SCORE 100 155 fixtures 5-480v pnls 8-208v pnl 1-15kva 1-30kva 1-45kva 1-75kva xfrm 79 fa devices 47 sws 2 receptacles 1 tele data stubs only 32 misc hvac connections paging speakers 18 misc 120v connections per 2008 nec & nfpa 72 (health care facility) Date: December 13, 2012 Contractor: Ford Robert Electric Co Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: January 29, 2014 | Permit id: 442579 | |||||
SCORE 100 353 fixtures 4-480v pnl 8-208v pnl 1-15kva 1-4kva 1-75kva xfrm 1-100a ats 86 fa devices 96 nurses call devices 128 sws 403 recep 139 tel dat stub 35 misc hvac connections 26 paging speakers misc 120v connections per 2008 nec & nfpa 72 (health care facility) Date: December 13, 2012 Contractor: Ford Robert Electric Co Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 442576 | |||||
SCORE 100 Relocate 8 sprinklers Date: October 10, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 499855 | |||||
SCORE 100 Rough in 5-wc, 13-lavs & 1-mop sink (hospital) Date: April 10, 2013 Contractor: Tandem Associates Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 9, 2014 | Permit id: 461104 | |||||
SCORE 100 Rough in & finish 4-sinks, 2-floor sinks & 1-floor drain (hospital) Date: April 10, 2013 Contractor: Tandem Associates Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 461105 | |||||
SCORE 100 New ductwork as per plans Date: December 15, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 1, 2012 | Permit id: 372473 | |||||
SCORE 100 Interior alterations for dexa diagnostic equipment space as part of hospital. Date: November 7, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 371534 | |||||
SCORE 86 Provide & install cat6 plenum cables to 12 1 24-cables as per nec 2008 (health care) installation to comply with articles 300. 21, 300. 22 & 8 of the 2008 nec. Date: January 6, 2015 Contractor: Delaney Telecom Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: November 6, 2015 | Permit id: 574886 | |||||
For the erection of two(2) floors(maximum height nte ft) to an existing three(3) story structure(size and location a shown on the application). For the expansion of icu building accessory to an existing hospital facility with 622 parking spaces including fourteen(14) h c spaces. Date: July 9, 2012 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 401372 | |||||
SCORE 100 Provide and install 9-12 strand single mode plenum rated armored fiber cable, provide and install 100-rg142 plenum n-male to n-male 2ft cable and 25-rg142 plenum n-male to n-male 4ft cable with longest cable run of 295 ft as per 2008 nec (east district) Date: March 8, 2016 Contractor: Bluestone Communications Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2017 | Permit id: 667230 | |||||
SCORE 100 Hvac including ductwork and mechanical equipment as per plans. Date: October 31, 2013 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 497012 | |||||
SCORE 100 Run 1 20kw generator to power audio and lighting for event on 4 15 2011 as per 2008 nec Date: March 22, 2011 Contractor: Earl B Larue Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: May 18, 2011 | Permit id: 330964 | |||||
SCORE 100 Installation of (238) sprinklers from basement to 3rd floor of cancer treatment center. Date: December 13, 2011 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: May 1, 2012 | Permit id: 373597 | |||||
SCORE 100 180-day tco for patient empowerment clinic Date: July 17, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: August 14, 2013 | Permit id: 483588 | |||||
SCORE 100 Relocating 24 sprinklers onn the 3rd floor lab of cancer treatment center of america Date: May 31, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 474660 | |||||
SCORE 100 For the installation of one (1) rooftop air handling unit (ahu), four (4) rooftop exhaust fans, ceiling mounted variable air volume (vav) units, (265) hvac terminal grilles registers diffusers (grds), & all associated supply return exhaust ductwork for surgical suites & associated office spaces within existing medical facility. Date: March 15, 2013 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 436834 | |||||
SCORE 100 Domestic water and sanitary piping for renovated area-(4 lavatories, (1)sink, (1)floor sink Date: November 19, 2012 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 16, 2013 | Permit id: 436596 | |||||
SCORE 100 Installation of two (2) ul 7 listed commercial kitchen exhaust hoods as per approved plans. Ductwork and fans installed under permit number 509553. Separate permit shall be required for installation of an approved automatic fire supression system Date: March 24, 2014 Contractor: Atlantic Fire Equipment Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 24, 2016 | Permit id: 524390 | |||||
SCORE 100 Install two (2) new wet chemical fire supression system in accordance with nfpa 17a, see application #5243 for kitchen hood approval. Date: March 24, 2014 Contractor: Atlantic Fire Equipment Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Expired | Completion date: April 14, 2014 | Permit id: 520595 | |||||
SCORE 100 Install approx. 48 light fixtures 1 receptacles 14 switches and 12 fire alarm devices per 2008 nec & nfpa 72 (health care facility) Date: April 25, 2013 Contractor: Donald A Pusey Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 458775 | |||||
SCORE 100 Alterations to replace doors at main entrance as per plans Date: December 5, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 369563 | |||||
Exterior alterations to include sitework improvements. Install curb cuts at front entry from parking lot and concrete paving. Date: October 21, 2011 Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: November 18, 2011 | Permit id: 366236 | |||||
SCORE 100 Demo exist lgts & recepts, new duplex recpt, lgt fixtures, hvac equip from pnl board, extend exist emer ckt emerg dist pnl, install pnl & recpts in new it room & voice data back boxes w conduit stubs as per nec 2008 (health care facility) Date: October 31, 2014 Contractor: Donald A Pusey Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: October 6, 2015 | Permit id: 560417 | |||||
SCORE 100 Installation of an automatic clean agent fire suppression system per engineers plans in accordnace with nfpa 2001 for second floor comm. Room in an existing medical center. Separate permit required for any electrical work. Date: April 20, 2012 Contractor: Suppression Systems Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: May 1, 2012 | Permit id: 387807 | |||||
For the installation of 8,0 gallon above-ground storage tank. (size and location as per application.) for use of an accessory above-ground storage tank for an existing hospital intensive care unit. (see ap#348573) Date: April 2, 2012 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 393715 | |||||
SCORE 100 New domestic water piping and sanitary piping for new additions (hospital) Date: November 30, 2012 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 436386 | |||||
SCORE 100 For hvac alterations to include the erection of mechanical equipment to include register, diffusers and associated ductwork. All work to be done per approved plans. Separate permits required for electrical, plumbing and fire supression work. Date: January 30, 2014 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 509553 | |||||
SCORE 100 Run 1-60-kw generator to provide power for sound & light - one day event from 5 15 15 per 2008 nec (health care)north district Date: April 13, 2015 Contractor: Earl B Larue Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 602318 | |||||
SCORE 100 Provide generator backup for the ups system,remove existing emergency feed for mob building,refeed mob emergency power from switchboard,ssbd(existing switchboard w existing 400amp breaker) as per 2008 nec (east district) Date: February 4, 2015 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: February 4, 2015 | Permit id: 583503 | |||||
SCORE 100 Tco for phase #1 Date: December 12, 2014 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: January 20, 2015 | Permit id: 579402 | |||||
SCORE 100 Installation of sanitary waste and vent. Install domestic hot and cold water piping and 1 sink, 2 floor drains Date: September 23, 2016 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 28, 2016 | Permit id: 723959 | |||||
SCORE 100 To amend electric permit#651983 adding power only for (5) fm-2 panels for mdf and idf rooms as per 2008 nec (middle atlantic) Date: September 22, 2016 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: October 24, 2016 | Permit id: 716287 | |||||
SCORE 100 Installation of a nfpa 13 sprinkler system for cancer center Date: May 31, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 468343 | |||||
SCORE 100 Installation of new head end equipment to provide fire alarm protection to cancer treatment center of america new corner stone expansion. This system will also cover penthouse coverage of fire alarm per 2008 nec & nfpa 72 (health care facility) Date: June 14, 2013 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: September 10, 2013 | Permit id: 470474 | |||||
SCORE 100 Tco for 1 days for 3rd floor pharmacy fit-out (bp #426516) Date: May 23, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: May 23, 2013 | Permit id: 473022 | |||||
SCORE 100 180-day tco Date: May 23, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: May 23, 2013 | Permit id: 473023 | |||||
SCORE 100 Tco for 1 days for 1st floor quality of life fit-out (bp #429814) Date: May 23, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Administrative permit | Permit status: Completed | Completion date: May 23, 2013 | Permit id: 473029 | |||||
SCORE 100 Level ii alterations to existing tomotherapy, as per plans Date: June 11, 2014 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Alteration permit | Permit status: Completed | Completion date: January 5, 2015 | Permit id: 539454 | |||||
SCORE 100 Relocate 11 sprinklers in the 1st floor tomotherapy room Date: August 6, 2014 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 553987 | |||||
SCORE 100 Fit-out, for patient empowerment clinic, as per plans Date: February 19, 2013 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: Addition permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 446511 | |||||
SCORE 100 Hvac, including ductwork, for rehabilitation area (1st floor), as per plans. Date: October 17, 2011 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 355582 | |||||
SCORE 100 Relocate storm water house drain Date: May 18, 2011 Contractor: Terry Abrams Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 1, 2012 | Permit id: 341330 | |||||
For the erection of a three(3) story addition of the existing hospital, , for the creation and for the erection of a chain link fence with gate. Size and location as shown in the application. For the expansion of second floor of an existing intensive care unit of the existing hospital, first and third floor remains vacant ( use registration permit required prior to occupancy) with all other uses with an existing 642 parking spaces including with two(2) existing loading spaces as previously approved. Date: July 1, 2011 Client: Philadelphia Healthcare | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 348573 | |||||
SCORE 95 Add (7) smoke detectors, (4) strobes and (3) speaker strobes as per nfpa-72 Date: April 7, 2011 Contractor: Hatzel And Buehler Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: May 18, 2011 | Permit id: 328554 | |||||
SCORE 100 Relocate 17 sprinklers at first floor of cancer treatment center Date: March 7, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: July 30, 2013 | Permit id: 457590 | |||||
SCORE 100 Relocating of existing fire sprinklers (208) to accomodate new construction Date: September 17, 2014 Contractor: Independence Fire Sprinkler Co Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: August 29, 2015 | Permit id: 562417 | |||||
SCORE 100 Remove and extend 21 duplex receptacles to new location. Relocate circuit to new hood location as per nec 2008 east district Date: August 30, 2016 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: August 30, 2016 | Permit id: 711775 | |||||
SCORE 100 Installation of mains, lines, and (76) sprinklers to an existing nfpa 13 fire suppresion system in the mechanical penthouse of cancer center. Date: April 3, 2013 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 452299 | |||||
SCORE 100 Fit out for new stem cell unit as per plan. Date: October 19, 2012 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: New construction permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 426517 | |||||
SCORE 100 Interior demolition of non-load bearing partitions. Date: December 27, 2013 Contractor: Terrell Enterprises Client: Philadelphia Healthcare | Permit type: Demolition permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 513092 | |||||
SCORE 100 Install approx. 285 light fixtures 1 switches 1 receptacles vav connections 92 fire alarm devices nurse call devices panels and 1 transformers per 2008 nec & nfpa 72 (health care facility) Date: April 16, 2013 Contractor: Donald A Pusey Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: April 16, 2013 | Permit id: 458762 | |||||
SCORE 100 Addition of (11) 1 amp ats switches to provide back up power to mdf and idf rooms. Addition of one 4 amp panel and 75kva transformers as per nec 2008 east district Date: December 21, 2015 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: December 21, 2015 | Permit id: 651983 | |||||
SCORE 100 Installation of soil and waste piping installation of water supply piping installation of floor and roof drains 17 roof and 15 floor drains (health care cancer treatment ctr) Date: October 10, 2012 Contractor: Herman Goldner Co Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2013 | Permit id: 427689 | |||||
SCORE 100 Installation of 1. 1kw chp generator for cogeneration,installation of 9-new pump feeds,installation of 1-cooling tower feed as per 2008 nec (east district) Date: January 4, 2016 Contractor: Shelly Electric Co Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: June 8, 2016 | Permit id: 654673 | |||||
SCORE 100 Fit-out of 2nd floor icu expansion. See ap#355804 for core and shell. Date: November 10, 2011 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare | Permit type: New construction permit | Permit status: Completed | Completion date: August 16, 2012 | Permit id: 370358 | |||||
SCORE 100 Hvac low voltage control wiring as per 2008 nec (hospital) Date: June 25, 2013 Contractor: Devon Electric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: October 3, 2013 | Permit id: 460634 | |||||
SCORE 100 Rough in & finish (hospital) Date: April 10, 2013 Contractor: Tandem Associates Inc Client: Philadelphia Healthcare | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 5, 2013 | Permit id: 461101 | |||||
SCORE 100 New lighting, switching, outlets, cod blue nurses call device, reusing existing power for new tomotherapy equipment as per 2008 nec (east district) Date: October 2, 2014 Contractor: Raff Electric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Completed | Completion date: April 28, 2015 | Permit id: 556734 | |||||
SCORE 100 Relocation of and or new diffusers , duct work, accessory mechanicals and piping, connect to existing system, in conjunction with alterations permit 279448 Date: March 4, 2011 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 9, 2012 | Permit id: 322887 | |||||
SCORE 60 Low voltage 12v 24v hvac control wiring for 5 new vav controller & relocated vav as per nec 2008 east dist (office) Date: October 23, 2014 Contractor: R And A Elelctric Inc Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: October 23, 2014 | Permit id: 569204 | |||||
SCORE 100 Run 1- kw generator to provide power for sound & light for event planned on 5 17 13 only (one day)parking lot temp event Date: April 17, 2013 Contractor: Earl B Larue Client: Philadelphia Healthcare | Permit type: Electrical permit | Permit status: Expired | Completion date: April 17, 2013 | Permit id: 465653 | |||||
SCORE 100 Relocating 4 sprinklers on the first floor bakery at ctca Date: February 12, 2014 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 519501 | |||||
Electrical permit Date: June 5, 2007 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 80812 | |||||
Sign permit Date: June 21, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 285643 | |||||
Mechanical permit Date: March 25, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 267256 | |||||
Suppression permit Date: May 18, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 265329 | |||||
New construction permit Date: June 4, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 281388 | |||||
Fast form building permit Date: April 9, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 144447 | |||||
Electrical permit Date: May 27, 2009 Client: Philadelphia Healthcare P | Permit status: Expired | Permit id: 217679 | |||||
Suppression permit Date: July 18, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 161271 | |||||
Plumbing permit Date: February 5, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 259063 | |||||
Electrical permit Date: January 11, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 254471 | |||||
Alteration permit Date: March 25, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 267064 | |||||
Electrical permit Date: June 11, 2008 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 157737 | |||||
Zoning use permit Date: June 10, 2010 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 275530 | |||||
Zoning permit Date: November 13, 2009 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 245273 | |||||
Zoning use permit Date: November 20, 2009 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 247989 | |||||
Operations permit Date: June 12, 2007 Client: Philadelphia Healthcare P | Permit status: Completed | Permit id: 1302 | |||||
Permit for legalization of the erection of seven (7) accessory signs (five (5) flat wall signs and two (2) double faced free standing signs) all accessory to an existing hospital (cancer treatment center) with accessory parking as previously approved. Date: May 5, 2010 Client: Philadelphia Healthcare P | Applicant: Christopher E Cummings, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: June 21, 2010 | Permit id: 11649 | |||||
SCORE 100 Install 4 poles, 8 lights, 1 trailer tempory as per 2008 nec (east district) Date: March 4, 2010 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: July 30, 2010 | Permit id: 265062 | |||||
SCORE 100 Lighting, power,nurse call for 3rd floor infusion chairs as per 2008 nec (east district) Date: March 24, 2010 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: July 30, 2010 | Permit id: 265063 | |||||
For the erection of a "roof-top" mechanical equipment room to include structural reinforcing of roof framing, dunnage, size and location as shown in application. Mechanical equipment room accessory to an existing hospital cancer treatment center with existing uses and accessory parking as previously approved, no signs on this application. Date: December 29, 2009 Client: Philadelphia Healthcare P | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 253796 | |||||
SCORE 99 Power connection for new x-ray machine. Date: January 11, 2010 Contractor: Goldhorn Electrical Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: July 30, 2010 | Permit id: 254471 | |||||
SCORE 100 Fast form building permit Date: May 21, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit status: Completed | Completion date: March 12, 2010 | Permit id: 153572 | |||||
SCORE 100 Install (19) auto sprinklers on the 1st flr. Clinical research Date: June 27, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: January 20, 2009 | Permit id: 147147 | |||||
SCORE 100 Run (1) kw generator to power lights, exit signs, sound and emergency lights, etc (east dist) Date: June 11, 2008 Contractor: Earl B Larue Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: October 7, 2008 | Permit id: 157737 | |||||
SCORE 100 Alterations, renovations & fire alarm 4th & 5th floor clinic build out. Date: March 9, 2010 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: July 30, 2010 | Permit id: 260829 | |||||
SCORE 100 Addition of sinks in exam rooms on the 4th and 5th floors, addition of staff and patient toilet rooms Date: February 5, 2010 Contractor: Tracey Mechanical Inc Client: Philadelphia Healthcare P | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 3, 2011 | Permit id: 259063 | |||||
SCORE 100 Renovation of clinical center, power, lighting, as per 2005 nec, install fire alarm as per nfpa72 (south district) Date: April 9, 2008 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: February 25, 2010 | Permit id: 138010 | |||||
SCORE 100 Furnish install hi-hats,(16)4 bed lights, (4) amp power poles, (4)2 x4 flourescent lts at nurse desk,(2) amp lt switch,(2)pull stations,(2)annunciator panels,(2)smoke det.(east dist) Date: September 9, 2008 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2009 | Permit id: 133544 | |||||
SCORE 82 6 21 07 - tent erected for cancer treatment centers of america @ eastern regional medical center - 1331 east wyoming avenue. Date: June 12, 2007 Contractor: Event Quip Client: Philadelphia Healthcare P | Permit type: Operations permit | Permit status: Completed | Permit id: 1302 | |||||
SCORE 100 Site permit for new rear parking lot, as per plans. Earth disturbance Date: June 4, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare P | Permit type: New construction permit | Permit status: Completed | Completion date: May 31, 2011 | Permit id: 281388 | |||||
SCORE 100 Run one kw generator to provide power for lighting sound and emergency lights for events 06 12 as per 2008 nec. Date: June 8, 2010 Contractor: Earl B Larue Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2010 | Permit id: 283845 | |||||
SCORE 100 Installation of signage. Install 2 flatwall signs as shown "a" and "b". Install 5 signs. Date: June 21, 2010 Contractor: Custom Finishers Inc Client: Philadelphia Healthcare P | Permit type: Sign permit | Permit status: Completed | Completion date: February 3, 2011 | Permit id: 285643 | |||||
SCORE 100 Rune one kw generator to power, sound, lighting, emergency exit signs as per 2008 nec event date 6-24-10 Date: June 23, 2010 Contractor: Earl B Larue Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 287147 | |||||
SCORE 100 Install one new amp 4 volt panel to feed 47 new parking lot, lighting poles as per 2008 nec Date: July 26, 2010 Contractor: Raff Electric Inc Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Expired | Completion date: July 26, 2010 | Permit id: 287693 | |||||
SCORE 100 1 - kw generator run for outdootr evenyt on 6 22 07 to power lights, sound, exit signs and emergency lighting (east dist) Date: June 5, 2007 Contractor: Earl B Larue Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: November 16, 2007 | Permit id: 80812 | |||||
SCORE 100 Site permit for new east side parking lot expansion Date: June 4, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare P | Permit type: New construction permit | Permit status: Completed | Completion date: May 14, 2012 | Permit id: 281127 | |||||
SCORE 100 Interior alterations to create an endoscopy suite as per plans. Date: May 25, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare P | Permit type: Alteration permit | Permit status: Completed | Completion date: March 24, 2011 | Permit id: 279448 | |||||
SCORE 100 Interior alterations Date: May 25, 2010 Contractor: Hsc Builders And Construction Client: Philadelphia Healthcare P | Permit type: Alteration permit | Permit status: Completed | Completion date: November 4, 2010 | Permit id: 279446 | |||||
SCORE 100 Install low voltage for hvac system as per 2008 nec (east district) Date: November 10, 2010 Contractor: Devon Electric Inc Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: June 29, 2011 | Permit id: 277232 | |||||
SCORE 100 Add 6 smokes, 2 strobes on 3rd floor infursion as per 2008 nec (east district) Date: May 18, 2010 Contractor: Goldhorn Elect Construction Co Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Completed | Completion date: July 30, 2010 | Permit id: 273490 | |||||
Hvac, ductwork. See parent ap#267064 for plans. Date: March 25, 2010 Client: Philadelphia Healthcare P | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 17, 2010 | Permit id: 267256 | |||||
Tenant fit out of the "infusion expansion" of the west wing on the 3rd floor as per plans. Date: March 25, 2010 Client: Philadelphia Healthcare P | Permit type: Alteration permit | Permit status: Completed | Completion date: June 17, 2010 | Permit id: 267064 | |||||
SCORE 100 Demo existing system and install a new fire sprinkler system on the 4th and 5th floors as per plans and nfpa 13. Backflow existing. Date: May 18, 2010 Contractor: A And S Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: June 17, 2010 | Permit id: 265329 | |||||
SCORE 100 Install 22 sprinklers as per plans on the 3rd floor for tenant fit out, see 267064, connect to existing system. Date: March 30, 2010 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: June 21, 2010 | Permit id: 265180 | |||||
SCORE 100 Install (7) auto sprinklers in the angio dept. Per submitted sealed plans & hyd. Cals. Date: July 18, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: February 12, 2009 | Permit id: 161271 | |||||
SCORE 100 Install 132 auto sprinklers on the 4th floor as per plans (rough-in requested). Date: September 5, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: March 23, 2010 | Permit id: 164263 | |||||
SCORE 100 Run (1) temporary kw generator for outdoor event to power sound, emergency lights and exit signs,on 6 12 2009, per 2005 nec (east dist) Date: May 27, 2009 Contractor: Earl B Larue Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Expired | Completion date: May 27, 2009 | Permit id: 217679 | |||||
SCORE 100 Install 134 auto sprinklers on the 5th floor cancer center per submitted sealed plans and hyd. Cals. Existing bfp. Date: October 16, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Healthcare P | Permit type: Suppression permit | Permit status: Completed | Completion date: February 23, 2010 | Permit id: 174244 | |||||
For the relocation of lot lines to create one (1) lot from (5) lots: 1219 e. Wyoming, 1313 e. Wyoming, 1335-53 e. Wyoming & 45 castor avenues, size and location as shown in application. Date: November 13, 2009 Client: Philadelphia Healthcare P | Permit type: Zoning permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 245273 | |||||
For the creation of (2) accessory parking lots, size and location as shown in application. The "rear" lot contains (266) spaces and the "east side" contains (71) spaces to include (12) h s spaces, all parking is accessory to an existing hospital facility with uses as previously approved, no signs on this application. Date: November 20, 2009 Client: Philadelphia Healthcare P | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2012 | Permit id: 247989 | |||||
Interior alterations to the 4th and 5th floors as per plans to include structural reinforcing, framing and dunnage for rooftop units. See ap#2495 for mechanical permit. Separate permits required for electrical and plumbing. Date: January 6, 2010 Client: Philadelphia Healthcare P | Permit type: Alteration permit | Permit status: Completed | Completion date: June 17, 2010 | Permit id: 249127 | |||||
SCORE 99 Alternate feed to penthouse equipment as per 2005 nec (east district) Date: December 22, 2009 Contractor: Goldhorn Electrical Client: Philadelphia Healthcare P | Permit type: Electrical permit | Permit status: Expired | Completion date: December 22, 2009 | Permit id: 250750 | |||||
Hvac and ductwork to the 3rd, 4th, 5th floors and rooftop. See ap#249127 for plans. Date: January 6, 2010 Client: Philadelphia Healthcare P | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 16, 2010 | Permit id: 249580 |