Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Sfd re-roof - remove tile, install comp shingles @ 34 s. F. -- also replace one skylight at sunroom your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 2, 2010 Value: $5,335 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: December 17, 2010 | Permit id: Pds2010-1030-20 | |||||
SCORE 88 Sfd re-roof - remove tile, install comp shingles @ 34 s. F. -- also replace one skylight at sunroom your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 17, 2010 | Permit id: Pds2010-1030-20 | |||||
SCORE 93 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 26, 2017 Contractor: Calafata Construction And Electric Inc Permit type: Addn | Permit status: Completed | Completion date: September 18, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: December 14, 2010 Permit status: Pass | Permit id: Pds2010-1030-20 |