Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 Install new lock down door opening in field house wall Parcel: 84034 0002r | |||||
SCORE 99 Construction of open air pergola w paving, walks, and planters per admin. Site plan review_07. 09. 13 structural aff. At final inspection Parcel: 84034 0002r | |||||
SCORE 97 Renovatiom of outdoor athletic field to include- synthetic turf, lighting, drainage, fencing, and landscaping Parcel: 84034 0002r | |||||
SCORE 95 Remove and relocate partition walls abutting offices, relocate electrical outles and paint walls finishes Parcel: 84034 0002r | |||||
SCORE 93 Temp. Tent(s) install on 11. 23. 11 and remove 11. 26. 11 for company event on 11. 26. 11 of (1) 80x 1 pole tent and (1) 8x 12 x16 stage Parcel: 84034 0002r | |||||
SCORE 62 Alterations to exstg structure, phaseii of Parcel: 84034 0002r | |||||
SCORE 95 Remove existing tpo membane, install new rubber roof Parcel: 84034 0002r | |||||
SCORE 62 Alter to exstg entrances & hvac work. Includes new site drainage Parcel: 84034 0002r |