Zoning/use permit Date: April 1, 2016 Client: Hq-1 L P | Permit status: Completed | Permit id: 668443 | |||||
Zoning use permit Date: April 1, 2016 Client: Hq-1 L P | Permit status: Completed | Permit id: 668443 | |||||
New construction permit Date: January 5, 2017 Client: Hq-1 L P | Permit status: Active | Permit id: 720846 | |||||
SCORE 94 New 6 amp service 1 amp for residential unit 2 amps for commercial space 1 amp for house panel. Wiring throughout as per plans and nec 2002 wiring of fire alarm throught as per code. Date: September 12, 2017 Contractor: Starlight Electric Inc Client: Hq-1 L P | Permit type: Electrical permit | Permit status: Active | Completion date: September 12, 2017 | Permit id: 808706 | |||||
SCORE 100 1st floor toilet,lav, 2nd floor toilet,lav,shower,kitchen sink,washer box,3rd floor 2 toilet,2 lavs,shower and hub drain (mixed use)the installation will comply with the philadelphia plumbing code 2004 Date: September 21, 2017 Contractor: Gregory F Rossi Plumbing And Htg Client: Hq-1 L P | Permit type: Plumbing permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 807283 | |||||
SCORE 89 Installation 2 heat pumps with ductwork (sfd) Date: July 14, 2017 Contractor: Andrius Rarkevicius Inc Client: Hq-1 L P | Permit type: Mechanical permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 799047 | |||||
SCORE 100 Install two 3 4" water services. Install lateal. Install curb trap. Install 4" main drain (mixed use) Date: March 10, 2017 Contractor: Charles Price Client: Hq-1 L P | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 766068 | |||||
SCORE 100 For the installation of a 2-inch fire service line for an automatic fire supression sprinkler system with 2-1 2 backflow prevention assembly in accordance with nfpa 13 & 13r Date: February 23, 2017 Contractor: Elite Fire Protection Client: Hq-1 L P | Permit type: Suppression permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 758983 | |||||
SCORE 89 New construction of a three story structure for use as 1st fl. Commercial unit and single-family dwelling above with an accessory roof deck accessed py a pilothouse, as per approved plans. Separate permit required for a certificate of occunacy for first floor commercial space prior to occupancy Date: January 5, 2017 Contractor: Matag Inc Client: Hq-1 L P | Permit type: New construction permit | Permit status: Active | Completion date: November 1, 2017 | Permit id: 720846 | |||||
For the erection of an attached structure with pilot house. Size and location as shown in plans. For use as a vacant commercial space on the first floor and a single-family dwelling with roof deck. Date: April 1, 2016 Client: Hq-1 L P | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 1, 2016 | Permit id: 668443 | |||||
SCORE 94 New 6 amp service 1 amp for residential unit 2 amps for commercial space 1 amp for house panel. Wiring throughout as per plans and nec 2002 wiring of fire alarm throught as per code. Date: September 12, 2017 Contractor: Starlight Electric Inc Client: Hq-1 L P | Permit type: Electrical permit | Permit status: Active | Completion date: September 12, 2017 | Permit id: 808706 |