Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: November 5, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 608404 | |||||
Suppression permit Date: July 7, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 615778 | |||||
Use permit Date: April 26, 2011 Client: Liberti Center-City | Permit status: Completed | Permit id: 337469 | |||||
Plumbing permit Date: August 4, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 629457 | |||||
Electrical permit Date: May 28, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 605421 | |||||
Plumbing permit Date: January 6, 2016 Client: Liberti Center-City | Permit status: Completed | Permit id: 661982 | |||||
Demolition permit Date: April 24, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 605353 | |||||
Alteration permit Date: May 7, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 600889 | |||||
1st floor use to homeless shelter (one rooming unit) with sanctuary on the 2nd floor. No addition. Date: April 26, 2011 Client: Liberti Center-City | Permit type: Use permit | Permit status: Completed | Completion date: April 26, 2011 | Permit id: 337469 | |||||
SCORE 100 For alterations to an existing structure to include underpinning work, roof repair and alterations, interior wall floor ceiling finishing, new elevator shaft enclosures, new stair enclosure, new smoke-rated corridor walls, accessible ramps and bathrooms, interior lighting, new lintel and framing installation, and new partition walls. (iebc 2009, compliance path: work-area method, lvl ii alterations.) existing windows at basement & ground floor to remain as noted. Asbestos abatement to be completed prior to commencement of permit work scope. Separate permits to be required for mechanical, kitchen exhaust hood, plumbing, electrical, and fire suppression system installations. Separate pa dept of labor & industry permit required for installation of elevator. All exterior masonry and cornice work subject to historical commission approval prior to installation application. Date: May 7, 2015 Contractor: Erickson C And Sons Inc Client: Liberti Center-City | Permit type: Alteration permit | Permit status: Completed | Completion date: February 13, 2016 | Permit id: 600889 | |||||
SCORE 100 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 24, 2015 Contractor: Erickson C And Sons Inc Client: Liberti Center-City | Permit type: Demolition permit | Permit status: Completed | Completion date: November 23, 2015 | Permit id: 605353 | |||||
SCORE 95 Furnish & install new lighting & recepts for partial renovation, install new 1200amp service w associated transformer, distribution panel & sub panel all pnls will be refed as per nec 2008 south district Date: May 28, 2015 Contractor: Hatzel And Buehler Inc Client: Liberti Center-City | Permit type: Electrical permit | Permit status: Completed | Completion date: December 5, 2015 | Permit id: 605421 | |||||
Mechanical permit Date: November 5, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 608404 | |||||
Plumbing permit Date: January 6, 2016 Client: Liberti Center-City | Permit status: Completed | Permit id: 661982 | |||||
Electrical permit Date: May 28, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 605421 | |||||
Plumbing permit Date: June 5, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 615384 | |||||
Use permit Date: April 26, 2011 Client: Liberti Center-City | Permit status: Completed | Permit id: 337469 | |||||
Suppression permit Date: July 7, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 615778 | |||||
Alteration permit Date: May 7, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 600889 | |||||
Demolition permit Date: April 24, 2015 Client: Liberti Center-City | Permit status: Completed | Permit id: 605353 | |||||
SCORE 100 Replace lateral,curb trap and main main into building (house of worship)pa201515217 self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: June 5, 2015 Contractor: J S Plumbing Company Llc Client: Liberti Center-City | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2015 | Permit id: 615384 | |||||
SCORE 96 Renovate existing building with new soil sanitary vent and domestic water piping (church)the installation will comply with the philadelphia plumbing code 2004 Date: June 3, 2015 Contractor: T Kelly Inc Client: Liberti Center-City | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 23, 2015 | Permit id: 613165 | |||||
SCORE 100 Hvac with related ductwork, diffusers registers and roof top mechanical equipment as per plans. Under phase 1: stair b01 in basement is to be used as storage room. Under phase 2: a structural opening to the floor above will be provided to convert storage room into stair b01 and ductwork will be rerouted accordingly. Date: November 5, 2015 Contractor: Lormar Mechanical Services Client: Liberti Center-City | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 7, 2015 | Permit id: 608404 | |||||
SCORE 100 Replace rain conductor on sidewalk pa20160061239 (house of worship)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: January 6, 2016 Contractor: J S Plumbing Company Llc Client: Liberti Center-City | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 661982 | |||||
SCORE 100 Install burglar alarm and access control system as per 2008 nec (cc district) Date: October 27, 2015 Contractor: Goldsmith Associates Inc Client: Liberti Center-City | Permit type: Electrical permit | Permit status: Expired | Completion date: October 27, 2015 | Permit id: 643103 | |||||
SCORE 95 Furnish and install new fire alrarm devices and wiring for partial renovations of the existing facility equipment to be installed- facp, annunciator, booster panels, duct detectors, smoke detectors, heat detectors pull stations, horn strobes, strobes, input modules, control relay modules. As per nfpa72 please reference the attached drawings. Date: October 30, 2015 Contractor: Hatzel And Buehler Inc Client: Liberti Center-City | Permit type: Electrical permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 642414 | |||||
SCORE 100 Install 3" water main with meter and backflow. Self-certifications are no longer permitted. All excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection. Pa1call20152121186 Date: August 4, 2015 Contractor: J S Plumbing Company Llc Client: Liberti Center-City | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 23, 2015 | Permit id: 629457 | |||||
SCORE 100 For the installation of an automatic sprinkler system w. Six (6) inch fire service line & backflow prevention (bfp) assembly to serve basement clasroom & assembly spaces of previously approved mixed-use religous assembly building. Automatic sprinkler system installation in accordance with nfpa 13. Date: July 7, 2015 Contractor: A And S Sprinkler Co Inc Client: Liberti Center-City | Permit type: Suppression permit | Permit status: Completed | Completion date: December 7, 2015 | Permit id: 615778 |