Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 For the erection of third floor addition and roof deck accessed by a roof deck access structure above an existing two (2) story single family structure, size and location as shown in the application plan, Date: April 6, 2017 Contractor: Dram Brothers Llc Client: Mba Homes Llc | Permit type: Zoning permit | Permit status: Completed | Completion date: April 6, 2017 | Permit id: 761002 | |||||
SCORE 69 For interior exterior alterations and renovation with the third floor addition and roof deck with a roof deck access structure above an existing two (2) story structure as per approved plans, Date: April 6, 2017 Contractor: Jolyon Stapleton Client: Mba Homes Llc | Permit type: Addition permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 761003 | |||||
SCORE 89 100amp service install new 1 amp panel meter wire breakers grounding and bonding. Rough and final home include all new wiring devices fixtures for a complete installation as per nec 2008 south district Date: August 22, 2017 Contractor: Sunbright Electric Client: Mba Homes Llc | Permit type: Electrical permit | Permit status: Active | Completion date: August 22, 2017 | Permit id: 810502 | |||||
SCORE 90 Rough in 2 full bath and 1 2 bath kitchen with garbage disposal and laundry room with washing machine standpipe as per philadelphia 2004 plumbing code. Date: September 6, 2017 Contractor: Aqua Plumbing And Heating Client: Mba Homes Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 813923 | |||||
Installain ghvac from start to finish, also bathroom exhaust fan duct, & dryer vent. 92% gas warm air heater in basement, 13 seer 3 ton 410-a refrigerant ac systems in rear yard. - for the installation if new ductwork, registers grilles diffusers, and warm-air appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Date: September 12, 2017 Client: Mba Homes Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 815379 | |||||
SCORE 69 Basement reinforcement according to plans. Date: December 1, 2017 Contractor: Jolyon Stapleton Client: Mba Homes Llc | Permit type: Alteration permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 826197 |