Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Washington marriott georgetown - ll-1 & ll-2 b. O. H. - revision to an issued building permit b-1603817 for the purpose of our application for permit revision, below is description of changes made to previously approved plans. Lower level 1 changes include keeping existing womenss and mens restroom and locker room to remain -remove in scope-, new layout for the employees cafeteria including enclosing 8 s. F. Of garage space for the cafeteria dining, revised plan also includes updated mechanical, electrical & plumbing as required for the plan revision. Lower level 2 changes include new office layout and reduction of scope by limiting the area of renovation to existing un-used vacant space -old laundry area-. There is no change in occupancy classification in the proposed revision and the area of work was reduce from 11,9 s. F. To 5,303 s. F. Plan revision includes updated mechanical, electrical, plumbing, interior and av drawings associated with the proposed changes, as per design. Date: September 21, 2016 Client: Gic 22nd Street Llc Geller Investment Co., Llc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609949 | |||||
SCORE 77 Washington marriott georgetown - ll-1 & ll-2 b. O. H. - revision to an issued building permit b-1603817 for the purpose of our application for permit revision, below is description of changes made to previously approved plans. Lower level 1 changes include keeping existing womenss and mens restroom and locker room to remain -remove in scope-, new layout for the employees cafeteria including enclosing 8 s. F. Of garage space for the cafeteria dining, revised plan also includes updated mechanical, electrical & plumbing as required for the plan revision. Lower level 2 changes include new office layout and reduction of scope by limiting the area of renovation to existing un-used vacant space -old laundry area-. There is no change in occupancy classification in the proposed revision and the area of work was reduce from 11,9 s. F. To 5,303 s. F. Plan revision includes updated mechanical, electrical, plumbing, interior and av drawings associated with the proposed changes, as per design. Date: September 21, 2016 Client: Gic 22nd Street Llc Geller Investment Co., Llc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609949 | |||||
SCORE 96 Electrical Date: October 21, 2016 Contractor: John V Narron Client: Gic 22nd Street Llc | Permit status: Permit issued | Permit id: E1700561 | |||||
SCORE 96 Electrical Date: October 21, 2016 Contractor: John V Narron Client: Gic 22nd Street Llc | Permit status: Permit issued | Permit id: E1700561 | |||||
SCORE 96 Electrical Date: October 21, 2016 Contractor: John V Narron Client: Gic 22nd Street Llc | Permit status: Permit issued | Permit id: E1700561 | |||||
SCORE 96 Electrical Date: June 27, 2016 Contractor: John V Narron Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: E1607592 | |||||
SCORE 96 Electrical Date: June 27, 2016 Contractor: John V Narron Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: E1607592 | |||||
SCORE 96 Mechanical Date: September 2, 2016 Contractor: Dominic E Totaro Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: M1603354 | |||||
SCORE 96 Plumbing and gas Date: September 2, 2016 Contractor: Dominic E Totaro Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: P1609160 | |||||
SCORE 96 Mechanical Date: September 2, 2016 Contractor: Dominic E Totaro Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: M1603354 | |||||
SCORE 77 Washington marriott georgetown - 2nd and 3rd level permit addendum no. 1 - b-1606241. For the purpose of our application for permit revision, below is description of changes made to previously approved plans. Level 2 - relocation of idf -av room- room from room 216 to room 207, changes includes mechanical and electrical work as required for the audio video equipments. Level 3 - relocation of idf -av room- room from room 306 to room 316, changes includes mechanical and electrical work as required for the audio video equipments, hvac -duct layout- at board room -room 301- is also revised due to existing condition limitations. There is no change in occupancy classification and no additional square footage is included in the proposed revision, as per design and memo. Date: November 2, 2016 Client: Gic 22nd Street Llc Geller Investment Co., Llc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1613235 | |||||
Plumbing and gas Date: July 8, 2016 Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: P1607627 | |||||
Plumbing and gas Date: July 8, 2016 Client: Pr Hh 22nd Street Owner Llc | Permit status: Permit issued | Permit id: P1607627 |