Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roofing permit for 28. 66 squares of asphalt shingles at 12:12 slope. Date: September 25, 2006 Contractor: Schroeder Roofing Inc Client: Peaks High | Applicant: Schroeder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 61 Installation of two radon exhaust fans -- new fan on existing circuit, and new fan on new circuit. Date: October 3, 2011 Contractor: Basil Electric Inc Client: Peaks High | Applicant: Basil Electric, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwe | |||||
SCORE 86 Replace breakerbox. Sfd. Date: October 4, 2012 Contractor: Applewood Plumbing Heating And Elec Client: Peaks High | Applicant: Applewood Plumbing Heating & Elec | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family d | |||||
SCORE 95 In-property sewer service repair only Date: April 15, 2013 Contractor: The Elite Pipe Md Client: Peaks High | Applicant: The Elite Pipe Md | Permit type: Wastewater | Permit status: Iss | |||||
SCORE 95 Replace sewer service from house to tap in street Date: April 22, 2013 Contractor: The Elite Pipe Md Client: Peaks High | Applicant: The Elite Pipe Md | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 88 Drill soil boring, construct monitoring well- work similar to previous wells on pmt2012-02606. Date: July 8, 2013 Contractor: Gdi Drilling Inc Client: Rentals Ellwood | Applicant: Gdi Drilling Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 98 Unit #1: replacement of existing shower pan and valve in multi-family unit. Date: March 24, 2015 Contractor: Norms Plumbing Htg And Supply Client: Peaks High | Applicant: Norms Plumbing Htg & Supply | Permit type: Plumbing | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Multifamily dwe | |||||
SCORE 86 Building permit to replace decking, handrailing and stair on east side of building. Floor joists and deck frame to remain. All materials to be installed per manufactures specifications. Client: Peaks High | Permit type: Building | Permit status: Iss | Current use: Multifamily dwellings, existing, deck, r | Permit id: Pmt2016-05435 | |||||
SCORE 86 Replace breakerbox. Sfd. Client: Peaks High | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04847 | |||||
SCORE 67 Installation of two radon exhaust fans -- new fan on existing circuit, and new fan on new circuit. Client: Peaks High | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04219 | |||||
SCORE 98 Unit #1: replacement of existing shower pan and valve in multi-family unit. Client: Peaks High | Permit type: Plumbing | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01025 | |||||
SCORE 86 Permit to rebuild a set of exterior stairs to one unit in a multi-family building. Client: Peaks High | Permit type: Building | Permit status: Iss | Current use: Single family attached dwelling, repair | Permit id: Pmt2017-01063 | |||||
SCORE 100 Roofing permit for 28. 66 squares of asphalt shingles at 12:12 slope. Client: Peaks High | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2006-04129 |