Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Construct interior alterations on the 3rd floor (zymo genetics) of existing structure, per floor plan, subject to field inspection. Date: September 30, 2011 Value: $20,000 Applicant: Mosier, Christopher | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6297336 | |||||
Construct interior non structural alterations to fourth floor of existing laboratory (zymogenetics), per floor plan and subject to field inspection, stfi. Date: January 25, 2011 Value: $3,200 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6272859 | |||||
Construct interior alterations on the 3rd floor (zymo genetics) of existing structure, per floor plan, subject to field inspection. Date: September 30, 2011 Value: $20,000 Applicant: Mosier, Christopher | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6297336 | |||||
Construct interior non structural alterations to fourth floor of existing laboratory (zymogenetics), per floor plan and subject to field inspection, stfi. Date: January 25, 2011 Value: $3,200 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6272859 | |||||
SCORE 95 Replace boiler (1) amp 4 volt circuit (like for like no new circuitry) and adding emergency power off switch epo to the boiler room (1) 1 volt circuit. Date: September 15, 2015 Contractor: Macdonaldmiller Service Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 5, 2015 | Expiration date: September 14, 2016 | Current use: Commercial | Permit id: 6494836 | |||||
SCORE 95 Remove old autoclave (washing) machine and install new plus added steam machine. Each new machine is to be power by new 480v 3phase fla circuit. Control cable to connect machines. Control circuit is 120v. Date: November 17, 2014 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: December 17, 2014 | Expiration date: November 17, 2015 | Current use: Commercial | Permit id: 6446659 | |||||
SCORE 95 Remove surface mounted 120v 20amp power outlet from existing ahu and re attached to new ahu. The following is a same for same type of ahu replacement at the same location on the roof: lock out power, disconnect existing parallel 3 flex conduits each with 300kcmil wiring from existing ac-2 and connect same flex and wiring to new ac-2 at the same location. Existing circuit ocp fuses will be replaced with new 3 amp fuses this ahu will be changed on saturday 12/14/13 so we may need a noon in Date: December 5, 2013 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2013 | Expiration date: December 5, 2014 | Current use: Commercial | Permit id: 6395012 | |||||
SCORE 95 Disconnect power from existing fan motor. Install vfd and connect power to new fan motor Date: October 15, 2013 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit issued | Expiration date: October 15, 2014 | Current use: Commercial | Permit id: 6387662 | |||||
SCORE 100 Scl lighting retrofit - rebate program Permit type: Electrical | Permit status: Permit closed | Completion date: March 5, 2014 | Expiration date: October 10, 2014 | Current use: Commercial | Permit id: 6386891 | |||||
SCORE 95 Install electrical and fire alarm to support new document control room with fire suppression system. Date: August 12, 2010 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2010 | Expiration date: August 12, 2011 | Current use: Commercial | Permit id: 6257664 | |||||
SCORE 99 Install fm-2 f/a system; this is a joint venture w/ e-squared systems & nelson electric. Date: September 7, 2010 Contractor: Esquared Systems Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2010 | Expiration date: September 7, 2011 | Current use: Commercial | Permit id: 6256625 | |||||
SCORE 99 Day get started for f/a only; this is a joint venture w/ e-squared systems & nelson electric. Date: August 2, 2010 Contractor: Esquared Systems Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2010 | Expiration date: September 2, 2010 | Current use: Commercial | Permit id: 6256626 | |||||
SCORE 100 Add 2 card readers and move two others. Date: July 22, 2010 Contractor: D G M Controls Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2010 | Expiration date: July 22, 2011 | Current use: Commercial | Permit id: 6255621 | |||||
SCORE 95 Remove old 20kw ups and replace with new 30kw ups. Install two new branch panels and receptacles in (2) data closets. Date: July 9, 2010 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2010 | Expiration date: July 9, 2011 | Current use: Commercial | Permit id: 6254428 | |||||
SCORE 95 Remodel of 5th floor lab area Date: June 28, 2010 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2010 | Expiration date: June 28, 2011 | Current use: Commercial | Permit id: 6253126 | |||||
SCORE 95 Rearrange existing circuits and duplexes into new configuration Date: June 17, 2010 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2010 | Expiration date: June 17, 2011 | Current use: Commercial | Permit id: 6252292 | |||||
SCORE 95 Adding switches, outlets & relocating some outlets. Date: August 19, 2008 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: September 11, 2008 | Expiration date: August 19, 2009 | Current use: Commercial | Permit id: 6191638 | |||||
SCORE 95 Install (1) light switch and (1) light fixture. Date: October 29, 2007 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: November 6, 2007 | Expiration date: October 28, 2008 | Current use: Commercial | Permit id: 6159168 | |||||
SCORE 95 Add (1) strip fixture at loading dock. Relocate a couple additional devices. Date: April 19, 2005 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: May 6, 2005 | Expiration date: April 19, 2006 | Current use: Commercial | Permit id: 6056069 | |||||
SCORE 95 Add-on to fire alarm system Date: November 19, 2003 Contractor: Simplexgrinnell Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: December 22, 2003 | Expiration date: November 19, 2004 | Current use: Commercial | Permit id: 6025054 | |||||
SCORE 100 (6) new private offices - relocate existing fixture & a few new fixtures & receptacles and add (2) devices to existing fire alarm system Date: September 17, 2002 Contractor: Sequoyah Electric Llc Permit type: Electrical | Permit status: Permit finaled | Completion date: October 11, 2002 | Expiration date: September 17, 2003 | Current use: Commercial | Permit id: 6003921 | |||||
SCORE 95 Add (2) new exhausst drops to existing system, relocate (1) exhaust grille, replace (3) supply diffusers, in suite 360. Subject to field inspection (stfi). Applicant: Sedy, Joe | Permit type: Mechanical | Permit status: Permit issued | Expiration date: March 14, 2018 | Current use: Commercial | Permit id: 6556565 | |||||
SCORE 95 Install [1] 50hp steam boiler in the mechanical room Date: October 14, 2015 Contractor: Macdonaldmiller Service Inc Applicant: Macdonald-Miller Service Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 28, 2015 | Expiration date: April 14, 2017 | Current use: Commercial | Permit id: 6499780 | |||||
SCORE 95 Install [1]327 gallin storage tank in the mechanical room Date: October 14, 2015 Contractor: Macdonaldmiller Service Inc Applicant: Macdonald-Miller Service Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 28, 2015 | Expiration date: April 14, 2017 | Current use: Commercial | Permit id: 6499781 | |||||
SCORE 95 Install cartop handrails Applicant: Thyssenkrupp Elevator Corp | Permit type: Conveyance | Permit status: Permit closed | Completion date: May 2, 2016 | Expiration date: October 23, 2016 | Permit id: 6469819 | |||||
SCORE 95 Install autoclave and clean steam generator Date: November 24, 2014 Contractor: University Mech Contractor Inc Applicant: University Mech Contractor Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: December 22, 2014 | Expiration date: May 24, 2016 | Current use: Commercial | Permit id: 6447796 | |||||
SCORE 95 Mechanical work to replace one existing air handling unit (ac-2), which serves the office spaces located on floors 1 through 5, per plans. Applicant: Sloane, Peter | Permit type: Mechanical | Permit status: Permit closed | Completion date: May 21, 2015 | Expiration date: June 12, 2015 | Current use: Commercial | Permit id: 6386483 | |||||
SCORE 95 Install piping for split systems Date: July 11, 2013 Contractor: University Mech Contractor Inc Applicant: University Mech Contractor Inc | Permit type: Refrigeration | Permit status: Permit closed | Completion date: July 18, 2013 | Expiration date: January 11, 2015 | Current use: Commercial | Permit id: 6373373 | |||||
SCORE 95 Adding split system cooling unit, per plan Applicant: Vu, Daniel | Permit type: Mechanical | Permit status: Permit closed | Completion date: July 24, 2013 | Expiration date: January 8, 2015 | Current use: Commercial | Permit id: 6363926 | |||||
SCORE 95 Making duct revisions to existing exhaust system and installing several pressure independent terminal units. Converting pressure dependent constant volume airflow exhaust to pressure independent variable airflow exhaust, per plans. Applicant: Bueler, Steve | Permit type: Mechanical | Permit status: Permit closed | Completion date: January 9, 2013 | Expiration date: March 4, 2014 | Current use: Commercial | Permit id: 6326470 | |||||
SCORE 95 Installation of new chiller in level 3 mechanical room & outdoor condensing unit on level 4 roof Date: January 12, 2012 Contractor: University Mech Contractor Inc Applicant: University Mech Contractor Inc | Permit type: Refrigeration | Permit status: Permit closed | Completion date: January 25, 2012 | Expiration date: July 12, 2013 | Current use: Commercial | Permit id: 6307791 | |||||
SCORE 95 Install new boiler Date: December 22, 2011 Contractor: University Mech Contractor Inc Applicant: University Mech Contractor Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: February 1, 2012 | Expiration date: June 22, 2013 | Current use: Commercial | Permit id: 6306064 | |||||
SCORE 95 Modify existing ductwork and connect new piping to owner-furnished equipment, per plan. Applicant: Vu, Daniel | Permit type: Mechanical | Permit status: Permit closed | Completion date: February 2, 2012 | Expiration date: June 1, 2013 | Current use: Commercial | Permit id: 6301307 | |||||
Stand alone sprinkler to replace portion of existing wet system replacing 7 heads, per plans. Date: August 9, 2010 Applicant: Miller, Craig | Permit type: Mechanical | Permit status: Reviews completed | Current use: Commercial | Permit id: 6257238 | |||||
SCORE 95 Install split system as a redundant unit for server room, ductwork & diffusers, per plan. Applicant: Vu, Daniel | Permit type: Mechanical | Permit status: Permit closed | Completion date: May 31, 2011 | Expiration date: October 21, 2012 | Current use: Commercial | Permit id: 6279733 | |||||
SCORE 95 Stand alone sprinkler Applicant: Fire Systems West Inc, | Permit type: Mechanical | Permit status: Permit closed | Completion date: May 26, 2011 | Expiration date: October 8, 2012 | Current use: Commercial | Permit id: 6278165 | |||||
SCORE 95 Installing two dry coolers pumps and two heat pumps and supply diffusers and ductwork per plan Applicant: Vu, Daniel | Permit type: Mechanical | Permit status: Permit closed | Completion date: April 3, 2013 | Expiration date: October 14, 2012 | Current use: Commercial | Permit id: 6276027 | |||||
SCORE 100 Stand alone sprinkler: add pre-action system to new server room Applicant: Miller, Craig | Permit type: Mechanical | Permit status: Permit closed | Completion date: May 26, 2011 | Expiration date: September 10, 2012 | Current use: Commercial | Permit id: 6275777 | |||||
SCORE 95 Installing generator fuel tank, muffler, and fuel fill station per plan Applicant: Idzik, Paul | Permit type: Mechanical | Permit status: Permit closed | Completion date: May 13, 2011 | Expiration date: October 14, 2012 | Current use: Commercial | Permit id: 6275002 | |||||
SCORE 95 Install (4) fire smoke dampers on level 1 and re-route (1)supply diffuser per plans. Applicant: Brooks, Steve | Permit type: Mechanical | Permit status: Permit closed | Completion date: September 9, 2010 | Expiration date: March 2, 2012 | Current use: Commercial | Permit id: 6258034 | |||||
SCORE 95 Remove exisiting hepa diffusers and replace with standard diffusers per plot plan Applicant: Idzik, Paul | Permit type: Mechanical | Permit status: Permit closed | Completion date: August 4, 2010 | Expiration date: December 8, 2011 | Current use: Commercial | Permit id: 6251227 | |||||
SCORE 95 Remove exisiting supply ductwork and instll new supply ductwork onto exisiting equipment per plot plan Applicant: Idzik, Paul | Permit type: Mechanical | Permit status: Permit closed | Completion date: July 28, 2010 | Expiration date: December 3, 2011 | Current use: Commercial | Permit id: 6250778 | |||||
SCORE 95 Replace (2) door opening devices (microscan) Date: March 6, 2009 Contractor: Thyssenkrupp Elevator Corp Applicant: Thyssenkrupp Elevator Corp | Permit type: Conveyance | Permit status: Permit closed | Completion date: April 16, 2009 | Expiration date: September 6, 2010 | Permit id: 6209973 | |||||
SCORE 95 Installing new electric boiler Date: March 19, 2008 Contractor: All Temp Mechanical Inc Applicant: All Temp Mechanical Inc | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: April 21, 2008 | Expiration date: September 19, 2009 | Current use: Commercial | Permit id: 6174297 | |||||
SCORE 95 Installing new autoclave Date: March 19, 2008 Contractor: All Temp Mechanical Inc Applicant: All Temp Mechanical Inc | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: April 21, 2008 | Expiration date: September 19, 2009 | Current use: Commercial | Permit id: 6174296 | |||||
SCORE 95 Install pana door device Date: January 13, 2006 Contractor: Thyssenkrupp Elevator Corp Applicant: Thyssenkrupp Elevator Corp | Permit type: Conveyance | Permit status: Permit finaled | Completion date: March 22, 2006 | Expiration date: July 13, 2007 | Permit id: 6084726 | |||||
SCORE 99 Install fm-2 f a system; this is a joint venture w e-squared systems & nelson electric. Date: September 7, 2010 Contractor: Esquared Systems, Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2010 | Expiration date: September 7, 2011 | Current use: Commercial | Permit id: 6256625 | |||||
SCORE 100 Cancel per customer log 15-1493 ddc controls for equipment job # 830555 Date: September 23, 2015 Contractor: E C Company Permit type: Electrical | Permit status: Permit issued | Expiration date: September 22, 2016 | Current use: Commercial | Permit id: 6496186 | |||||
SCORE 99 Day get started for f a only; this is a joint venture w e-squared systems & nelson electric. Date: August 2, 2010 Contractor: Esquared Systems, Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2010 | Expiration date: September 2, 2010 | Current use: Commercial | Permit id: 6256626 | |||||
SCORE 95 Demo smr, relocate 120v 20a circuits to new outlet locations. Relocate network cables, relocate light switch to accommodate wider door, install dedicated 10kav 400v transformer, install hardwired connection to 3/400v 12 fla machine, relocate card reader Date: September 8, 2016 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit issued | Completion date: November 9, 2016 | Expiration date: September 8, 2017 | Current use: Commercial | Permit id: 6555493 | |||||
SCORE 95 Data jack. 4/8/15 sk add 1 amp feeder Date: March 16, 2015 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: April 13, 2015 | Expiration date: March 15, 2016 | Current use: Commercial | Permit id: 6464176 | |||||
SCORE 95 Add 1-new quad receptacle with 2-dedicated circuits.. Job number: 216585. Ewo 755. Date: February 7, 2017 Contractor: Prime Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: February 22, 2017 | Expiration date: February 7, 2018 | Current use: Commercial | Permit id: 6580038 | |||||
SCORE 95 Closed as incomplete - expired permit. Replacing refrigerant compressors, evaporator coils, misc piping for existing rooftop hvac unit Date: October 23, 2012 Contractor: University Mech Contractor Inc Applicant: University Mech Contractor Inc | Permit type: Refrigeration | Permit status: Permit issued | Expiration date: April 23, 2014 | Current use: Commercial | Permit id: 6339525 | |||||
SCORE 95 Disconnect and reconnect with new (2) new air compressor (2) amp, 4 volt, 3 phase circuits provide and install (1) new exhaust fan (1) amp, 1 volt, 1 phase Date: November 2, 2016 Contractor: Macdonaldmiller Service Inc Permit type: Electrical | Permit status: Permit issued | Completion date: April 1, 2017 | Expiration date: November 2, 2017 | Current use: Commercial | Permit id: 6565021 | |||||
SCORE 95 Cancel per customer log 12-71addition of control relays to drop maglocks upon alarm joint venture between nelson electric and simplexgrinnell Date: November 14, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit issued | Expiration date: November 14, 2012 | Current use: Commercial | Permit id: 6302060 | |||||
SCORE 95 Fire alarm ti; to tie into existing system. Joint venture with nelson electric & simplexgrinnell Date: April 12, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: April 12, 2012 | Current use: Commercial | Permit id: 6278299 | |||||
SCORE 95 Facp replacement. Joint venture with nelson electric & simplexgrinnell Date: March 25, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: March 25, 2012 | Current use: Commercial | Permit id: 6278300 | |||||
SCORE 95 Altering 19 existing light fixtures for revised switching scheme. Installing (4) new lighting circuits, 6 switches, and 42 lv devices. 1 31 12 jcb; add (12) switches, (22) lights. Date: November 14, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2013 | Expiration date: November 13, 2012 | Current use: Commercial | Permit id: 6302089 | |||||
SCORE 95 Lighting: relocate (45) florescent troffers, add (2) troffers. Add (1) light switch. Transformer system 125amp feeder. 75kva transformer. 225a feeder. (2) 208v panelsmech systems:boiler. 175a feeder. 175a equipment connection ton cooling unit(2) 30a connectionspower outlets: of smr totalling dedicated outlets. (9) relocated wall outletsfire alarm:relocate (2) horn strobes. 12 30 11 mvc: adding 47 lights, 3 switches, 15-25a dedicated, low voltage & communication. Date: November 7, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: February 2, 2012 | Expiration date: November 6, 2012 | Current use: Commercial | Permit id: 6301283 | |||||
SCORE 95 Cabling for lusp and annex building re-cable, 1st fl n, 2nd fl n and s, 3rd fl n and s. Job # 710069 Date: July 25, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2012 | Expiration date: July 24, 2012 | Current use: Commercial | Permit id: 6290257 | |||||
SCORE 95 8 fiber optic cable and pathway installation for the lusp & annex buildings - job # 605096 Date: June 10, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2012 | Expiration date: June 9, 2012 | Current use: Commercial | Permit id: 6285855 | |||||
SCORE 95 (3) fiber optic cable runs. Job # 6044335 3 2012 jnl - about to expire letter mailed Date: May 13, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 16, 2012 | Expiration date: May 12, 2012 | Current use: Commercial | Permit id: 6283128 | |||||
SCORE 95 Install 4" raceway for fiber between mdf and idf rooms. Gu605106 Date: June 2, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2012 | Expiration date: June 1, 2012 | Current use: Commercial | Permit id: 6284986 | |||||
SCORE 95 Add (7) power outlets and (4) temperature alarm points for new 1 volt refrigerators. Make power connection to new 208volt 5 ton split a c unit Date: April 18, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: April 17, 2012 | Current use: Commercial | Permit id: 6280494 | |||||
SCORE 96 Low voltage controls Date: April 19, 2011 Contractor: Wpcs Intl Inc Sea Op Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: April 18, 2012 | Current use: Commercial | Permit id: 6280695 | |||||
SCORE 99 Installing fm-2 suppression system to existing space Date: March 24, 2011 Contractor: Esquared Systems, Llc Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: March 24, 2012 | Current use: Commercial | Permit id: 6274287 | |||||
SCORE 95 Cta5e installation for 1st floor south , devices - job 604433 Date: March 9, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: March 8, 2012 | Current use: Commercial | Permit id: 6276664 | |||||
SCORE 95 Cat5e installation for the zymo 4th floor ti job 604020 Date: January 25, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 1, 2011 | Expiration date: January 25, 2012 | Current use: Commercial | Permit id: 6272878 | |||||
SCORE 95 Cat5e installation for the zymo 4th and 5th floor south projects65 comm devices, 4 fiber optic backbone cablesjob 604018 Date: January 25, 2011 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: January 25, 2012 | Current use: Commercial | Permit id: 6272880 | |||||
SCORE 95 Installation of network cabling 59-1472 Date: September 18, 2009 Contractor: Cochran Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: December 1, 2010 | Expiration date: September 18, 2010 | Current use: Commercial | Permit id: 6227620 | |||||
SCORE 95 14 devices 52-2164 Date: July 29, 2010 Contractor: Cochran Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2010 | Expiration date: July 29, 2011 | Current use: Commercial | Permit id: 6256336 | |||||
SCORE 95 4th floor north. (3) new 120v 20amp ckts. (1) new 208v 20amp ckt. (4) altered 120v 20amp ckts. Relocate (2) light fixtures. Date: February 1, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: March 1, 2011 | Expiration date: February 1, 2012 | Current use: Commercial | Permit id: 6273453 | |||||
SCORE 95 Installation of (1) 200a 208 120v panel in 3rd floor south electrical room. Installation of (12) dedicated circuits in multi-outlet assembly in room 327 Date: October 10, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: December 1, 2011 | Expiration date: October 9, 2012 | Current use: Commercial | Permit id: 6298210 | |||||
SCORE 95 Add 14 circuits to lab area 272, 273, and 274. Add 7 circuits to lab area 265. Add three circuits to rooms 266 and 262. Add new circuits to lab area 260. Add 1 75kva transformer and 1 42ckt electric panel. 10/21/09 mvc: delete transformer & add 100a panel/feeder. Date: September 24, 2009 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: October 29, 2009 | Expiration date: September 24, 2010 | Current use: Commercial | Permit id: 6228187 | |||||
Alterations to parking garage to expand electrical equipment room Date: March 2, 2011 Value: $7,400 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6275926 | |||||
Alterations to room 108 108a for server room, subject to field inspection Date: March 1, 2011 Value: $5,700 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6275922 | |||||
SCORE 100 Tenant improvement on the 4th floor of existing laboratory (zymogenetics), per floor plan and subject to field inspection, stfi. Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6274738 | |||||
Non-structural, interior tenant improvement to third floor of an existing building per floor plan and subject to field inspection Date: June 16, 2010 Value: $20,000 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6250274 | |||||
Alterations to parking garage to expand electrical equipment room Date: March 2, 2011 Value: $7,400 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6275926 | |||||
Alterations to room 108/108a for server room, subject to field inspection Date: March 1, 2011 Value: $5,700 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6275922 | |||||
SCORE 100 Interior non structural tenant improvement on portion of 1st floor of zymogenetics office labs, per plan. Applicant: Mosier, Christopher | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6336998 | |||||
Non-structural, interior tenant improvement to third floor of an existing building per floor plan and subject to field inspection Date: June 16, 2010 Value: $20,000 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Completion date: August 9, 2010 | Expiration date: December 16, 2011 | Current use: Commercial | Permit id: 6250274 | |||||
Interior nonstructural alterations to the north/northwest corner of the first floor in the human resources office of the zymogenitcs office (steam plant building) per stfi. Date: August 13, 2008 Value: $20,000 Applicant: Sheldon, Rocky | Permit type: Construction | Permit status: Permit closed | Completion date: September 26, 2008 | Expiration date: February 13, 2010 | Current use: Commercial | Permit id: 6191042 | |||||
Interior alteration to janitors closet in existing research and development lab in center of 1st floor per floor plan subject to field inspection (stfi). Date: October 22, 2007 Value: $7,000 Applicant: Sheldon, Rocky | Permit type: Construction | Permit status: Permit closed | Completion date: May 19, 2008 | Expiration date: April 22, 2009 | Current use: Industrial | Permit id: 6158222 | |||||
Interior nonstructural alterations to the north northwest corner of the first floor in the human resources office of the zymogenitcs office (steam plant building) per stfi. Date: August 13, 2008 Value: $20,000 Applicant: Sheldon, Rocky | Permit type: Construction | Permit status: Permit closed | Completion date: September 26, 2008 | Expiration date: February 13, 2010 | Current use: Commercial | Permit id: 6191042 | |||||
Alterations to room 108 108a for server room, subject to field inspection Date: March 1, 2011 Value: $5,700 Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Completion date: June 7, 2011 | Expiration date: September 1, 2012 | Current use: Commercial | Permit id: 6275922 | |||||
SCORE 95 Replace 4" thimble exhaust outlets with 6" thimble exhaust outlets. Rebalancing airflow @ all supply and exhaust outlets Applicant: Bueler, Steve | Permit type: Mechanical | Permit status: Permit closed | Completion date: January 3, 2012 | Expiration date: April 28, 2013 | Current use: Commercial | Permit id: 6300341 | |||||
SCORE 95 Cancel per customer log 13-22 installing 1-fan power unit with electric heat, and associated duct work for office remodel Applicant: Idzik, Paul | Permit type: Mechanical | Permit status: Permit issued | Expiration date: June 17, 2014 | Current use: Commercial | Permit id: 6344533 | |||||
SCORE 95 Day get started for branch circuits only; pending plans 6274942 per tim rasmussen. Extended to 4 25 11 rrj Date: February 25, 2011 Contractor: Nelson Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: April 8, 2011 | Expiration date: April 25, 2011 | Current use: Commercial | Permit id: 6275577 | |||||
SCORE 95 Replace 250kw genset with 750kw genset, update life safety & optional riser Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2011 | Expiration date: April 8, 2012 | Current use: Commercial | Permit id: 6274942 |