Building Permits at 12 13th St Se, Washington, DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 12 13th St Se, Washington, DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Dccr proposes to drill two geotechnical boarings, ms-mw-02d & ms-mw-02s, located at 12 13th st se. Both boarings will be 6 inches in diameter, 02d will be 36 feet deep wioth a foot screened interval starting at 25 feet deep and 02s will be 23 feet deep with a foot screened interval, starting at 13 feet deep. Both will be dirlled with hollow stem auger. No permanent casing will be installed. See idw mangement and attached schematic for additional information. All drill-generated waste will be drummed, solid and liquid. The well shall be covered and protected from surface water drainage and the vertical migration of contaminants and other materials though the well casing and well annulus.
Date:  September 3, 2014

Client: Washington Gas Light Company | Applicant: Chris Willett Urs Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400412
2014/09/0309512 13th St Se
Dccr proposes to drill one geotechnical boring, ms-mw 01, located in 12 13th st se. The boring will be 6 inches in diameter and 2 feet bgs, with a screened interval from 135 to 195 feet bgs, drilled by mud rotary. Permanent stell casing will installed and be socketed feet into p/a and grouted before drilling into the ptx. Msds for drilling mud additives attached. See idw management plan and attached schematics for additiional information. All drillling-generated waste will be drummed, solids and liquids. The well shall be covered and protected from surface water drainage and the vertical migration of contaminants and other materials though the well casting and well annulus.
Date:  September 3, 2014

Client: Washington Gas Light Company | Applicant: Chris Willett Urs Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400413
2014/09/0309512 13th St Se
SCORE
70
Dccr proposes to drill two geotechnical boarings, ms-mw-02d & ms-mw-02s, located at 12 13th st se. Both boarings will be 6 inches in diameter, 02d will be 36 feet deep wioth a foot screened interval starting at 25 feet deep and 02s will be 23 feet deep with a foot screened interval, starting at 13 feet deep. Both will be dirlled with hollow stem auger. No permanent casing will be installed. See idw mangement and attached schematic for additional information. All drill-generated waste will be drummed, solid and liquid. The well shall be covered and protected from surface water drainage and the vertical migration of contaminants and other materials though the well casing and well annulus.
Date:  September 3, 2014

Client: Washington Gas Light Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400412
2014/09/0307012 13th St Se, Washington, DcChris Willett Urs Corporation
SCORE
70
Dccr proposes to drill one geotechnical boring, ms-mw 01, located in 12 13th st se. The boring will be 6 inches in diameter and 2 feet bgs, with a screened interval from 135 to 195 feet bgs, drilled by mud rotary. Permanent stell casing will installed and be socketed feet into p/a and grouted before drilling into the ptx. Msds for drilling mud additives attached. See idw management plan and attached schematics for additiional information. All drillling-generated waste will be drummed, solids and liquids. The well shall be covered and protected from surface water drainage and the vertical migration of contaminants and other materials though the well casting and well annulus.
Date:  September 3, 2014

Client: Washington Gas Light Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400413
2014/09/0307012 13th St Se, Washington, DcChris Willett Urs Corporation
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.