Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Building a units 7 & 8 ga power needs wiring approval Date: September 27, 2013 Contractor: Red Line Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201308014 | |||||
SCORE 86 Temporary pole building b Date: September 27, 2013 Contractor: Red Line Inc Permit type: Electrical | Permit status: Closed - passed | Permit id: Be-201308012 | |||||
SCORE 86 Add temporary power to residence for (30) days- Date: October 26, 2011 Contractor: Red Line Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201107664 | |||||
SCORE 86 Electrical work on units: 3, 5, 6, 7, 8 - Date: September 15, 2011 Contractor: Red Line Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201106622 | |||||
SCORE 56 Replacing ac & air handlers in apartment 3,5,6,7,& 8- Date: September 12, 2011 Contractor: 2 Sockwell Dr Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102174 | |||||
SCORE 66 Replace existing int. Ext. Doors, repair existing holes in the drywall only, repair existing deck porch, bath kitchen cabinets countertops, replace existing wintows or glazing Date: September 8, 2011 Contractor: Top Team Roofing And Contracting Inc Permit type: Repair | Permit status: Terminated | Permit id: Bb-201104165 | |||||
SCORE 66 Replace existing int. Ext. Doors, repair existing holes in the drywall only, repair existing deck porch non-structural, bath kitchen cabinets countertops, replace existing windows or glazing replace drywall and replace insullation to the codes. Per: doug young inkind repair replacement roofing Date: September 8, 2011 Contractor: Top Team Roofing And Contracting Inc Permit type: Repair | Permit status: Issued | Permit id: Bb-201104162 | |||||
SCORE 66 Fascia, re roof, interior paint, gutters, replace existing doors, deck repair replace, kitchen cabinets, replace existing windows or glazing Date: September 8, 2011 Contractor: Top Team Roofing And Contracting Inc Permit type: Repair | Permit status: Terminated | Permit id: Bb-201104157 | |||||
SCORE 66 Re-roof, fascia soffit, paint interior, gutters, replace interior exerior doors, repair existing holes in the drywall only, repair existing deck porch-non structural, bath cabinets countertops, kitchen cabinets countertops, replace existing windows glazing. Date: September 8, 2011 Contractor: Top Team Roofing And Contracting Inc Permit type: Repair | Permit status: Terminated | Permit id: Bb-201104156 | |||||
SCORE 66 Re roof, fascia, interior paint, gutters, replace existng interior exterior doors, deck repair, bath cabinets, kitchen cabinets, replace existing windows or glazing. Date: September 8, 2011 Contractor: Top Team Roofing And Contracting Inc Permit type: Repair | Permit status: Terminated | Permit id: Bb-201104155 | |||||
SCORE 65 Repipe with water service Date: August 30, 2011 Contractor: Down 2 Earth Plumbing And Septic Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201102473 |