Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Repair leak on gas service taps for 1175 & 11 georgetown Date: March 26, 2014 Contractor: Xcel Energy Client: Harry Antener | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
Repair leak on gas service taps for 1175 & 11 georgetown Date: March 26, 2014 Client: Harry Antener | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-01274 | |||||
SCORE 100 Total tear-off & reroof of sfd, 16 squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Harry Antener | Permit type: Roofing | Permit status: Cmp | Completion date: October 20, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-04578 |