Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: December 14, 2007 Client: Sholevar Pirooz G | Permit status: Expired | Permit id: 114818 | |||||
Plumbing permit Date: November 15, 2007 Client: Sholevar Pirooz G | Permit status: Completed | Permit id: 115886 | |||||
Electrical permit Date: December 14, 2007 Client: Sholevar Pirooz G | Permit status: Expired | Permit id: 114818 | |||||
Plumbing permit Date: November 15, 2007 Client: Sholevar Pirooz G | Permit status: Completed | Permit id: 115886 | |||||
SCORE 100 Installationof (2) fixtures, (1) water closet and (1) hand sink, copper water distribution to cast iron soil piping from handicap bathroom Date: November 15, 2007 Contractor: John Shegda Client: Sholevar Pirooz G | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 17, 2008 | Permit id: 115886 | |||||
SCORE 100 1 st & 2nd floor, rewire. Addition to fire alarm system Date: December 14, 2007 Contractor: Jl Glenn Electrical Service Client: Sholevar Pirooz G | Permit type: Electrical permit | Permit status: Expired | Completion date: December 14, 2007 | Permit id: 114818 | |||||
SCORE 80 For the relocation of lot line to create one lot from four(4) existing lots (110,112,114,116 east allegheny ave opa#871511700,871511710,071298400,071298500) . (size and location as shown on plans). See application 766773 for plans Date: December 12, 2017 Contractor: Heaven Gen Contracting Llc Client: Sholevar Pirooz G | Permit type: Zoning permit | Permit status: Completed | Completion date: December 12, 2017 | Permit id: 837191 |