Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 90 Remove & replace (e) 125 amp elect panel w new (same amp & location) for (e) sfd Date: July 31, 2017 Contractor: El Cajon Electric Co Permit type: Addn | Permit status: Completed | Completion date: September 28, 2017 | Permit id: Pds2017-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 8, 2017 Permit type: Addn | Permit status: Completed | Completion date: December 12, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 94 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 22, 2017 Contractor: Anderson Heating And Air Conditioning Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 90 Remove & replace (e) 125 amp elect panel w new (same amp & location) for (e) sfd Date: July 31, 2017 Contractor: El Cajon Electric Co Permit type: Electrical only | Permit status: Issued | Permit id: Pds2017-Resalt- | Parcel: 4983503200 | |||||
SCORE 94 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 22, 2017 Contractor: Anderson Heating And Air Conditioning Inc Permit type: Hvac change out | Permit status: Issued | Permit id: Pds2017-Resalt- |