Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 Marriott - remodel Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-16-01690 | |||||
SCORE 100 8 120volt duplex receptacles ceiling mounted. 4 120volt duplex receptacles flush mounted. 2 t. V. J-box (one at 48 and one at 16) with 2-empty 1 conduits connecting them. 3 wall mounted occupancy sensor light switch. 2 single-pole light switch. 2 relamp existing flood light. 8 4 single lamp t-5 strip lights mounted in strip track metal (by others). Type a light. 6 par lamp holder on 12 stem with led lamp. Type b light. 3 conference room pendant light (300. Allowance). 1 pendant light fixture (200. Allowance). Type e. 1 electrical permit and hand drawn print if necessary (35. Allowance). Date: August 23, 2012 Contractor: Steven Brase Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-12-07953 | |||||
SCORE 95 Mastercraft#101-1)lennox air conditioner 13acx-0 5 ton, 1 furnace g51mp60c-135 135000btu, 1)exhaust fan, ductwork Permit type: Permits/mechanical/commercial/heating and air conditioning | Permit status: Issued | Permit id: Mec-10-02817 | |||||
SCORE 100 Mastercraft building Date: April 16, 2010 Contractor: Steven Brase Permit type: Permits/electrical/commercial/electrical | Permit status: Issued | Permit id: Elc-10-02415 | |||||
SCORE 95 Commercial plumbing Date: December 1, 2011 Contractor: Nate Frazier Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-11-06640 | |||||
SCORE 95 Bay finish Date: July 26, 2012 Contractor: Paul Frazier Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-12-05722 | |||||
SCORE 100 Install receptacles/lights/switches per owner. Date: July 9, 2012 Contractor: Steven Brase Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-12-06228 |