Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Remove and replace existing boiler & pump like for like. Install additional pad and boiler. Date: November 18, 2013 Contractor: Matrix Hg Inc Permit status: Finaled | Permit id: B13-4648 | |||||
SCORE 60 Complete tearoff, reinsulate and reroof pge building with class a cool roof 4 square Date: September 10, 2014 Contractor: California Roofing Co Inc Permit type: Roof | Permit status: Finaled | Permit id: B14-3425 | |||||
SCORE 92 Replace vandalized backflow prevention device Date: December 1, 2014 Contractor: Roberts Mechanical And Electrical Inc Permit status: Finaled | Permit id: B14-4820 | |||||
SCORE 91 Grading for removal of 1 ust-backfill excavation, area to be repaved to match existing grades and flow patterns. Backfill under the supervision of a soils engineer Date: October 2, 2012 Contractor: Paradiso Mechanical Inc Permit status: Issued | Permit id: B12-2660 | |||||
SCORE 56 Provide electrical power with conduit and communications conduit from building to gate motor operators. This includes the installation of a circuit breaker, conductors, and a motor operator service disconnect Date: November 18, 2014 Contractor: Roberts Service And Construction Permit type: Electrical | Permit status: Finaled | Permit id: B14-4670 | |||||
SCORE 92 Connect into existing waterpipe and install additional 3/4" copper pipe to washer/dryer. Date: November 10, 2014 Contractor: Roberts Mechanical And Electrical Inc Permit status: Finaled | Permit id: B14-4546 |