Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Stanberry mh Date: April 12, 2010 Permit status: Closed | Permit id: 10-00695 | |||||
SCORE 99 Stanberry mh Client: Stanberry Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-00695 | Parcel: 60695 | |||||
SCORE 70 Stanberry mh Client: Stanberry Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-00695 | Parcel: 60695 | |||||
February 5, 20 1:32:25 pm kneel. Stanberry - used mh to lot location: smokey park to maple to hill.; march 16, 20 9:30:23 am jfortner. Rec amendment adding mechanical to permit;aml; april 12, 20 4:02:55 pm kneel. Stanberry - used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" Permit type: Permits - historical | Permit status: Closed | Permit id: 10-00695 | Parcel: 60695 | |||||
Stanberry mh Date: April 12, 2010 Value: $6,400 Permit type: Historical | Permit status: Closed | Permit id: 10-00695 | |||||
February 5, 20 1:32:25 pm kneel. Stanberry - used mh to lot location: smokey park to maple to hill.; march 16, 20 9:30:23 am jfortner. Rec amendment adding mechanical to permit;aml; april 12, 20 4:02:55 pm kneel. Stanberry - used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" Date: April 12, 2010 Permit type: Permits - historical | Permit status: Closed | Permit id: 10-00695 | Parcel: 60695 |