Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #12 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin # -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #16 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #13 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #14 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #11 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 250-150-16-00 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: March 17, 2011 Value: $13,824 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2011-1017-20 | Parcel: 250-150-16-00 | |||||
Demo existing 214 sqft bathroom, 752 sqft addn to existing dining hall, & minor remodel to existing dining hall create storage area & push out serving counter. Misc. Elec. Plum. & mech. For camp stevens 6-1-20 plan change for door hardware (panic hardware (removal from unlocked doors) vam Date: November 24, 2009 Value: $77,907 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2009-1019-20 | Parcel: 250-150-16-00 | |||||
Demo existing 214 sqft bathroom, 752 sqft addn to existing dining hall, & minor remodel to existing dining hall create storage area & push out serving counter. Misc. Elec. Plum. & mech. For camp stevens 7 8 09: plan change see conditions of approval for details. 1srs Date: March 24, 2009 Value: $77,907 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2009-1017-20 | Parcel: 250-150-16-00 | |||||
SCORE 97 Grading for plan check 1017-20090024: (2774 sqft 2 story lodge (6 rooms) w ac & fs, 2 amp service, misc. Elec., plum., & mech for camp stevens) Permit type: Pds residential mino | Permit status: Completed | Permit id: Pds2009-1026-20 | Parcel: 250-150-16-00 | |||||
SCORE 97 2774 sqft 2 story lodge (6 rooms) w ac & fs, 1 sq. Ft. Retaining wall with level backfill, 2 amp service, misc. Elec., plum., & mech for camp stevens Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2009-1017-20 | Parcel: 250-150-16-00 | |||||
Firestorm 2007 angel fire rebuilding 432 sq ft girls cabin and 521 sq ft restroom. Original sq footages were 4 s f girls cabin and 4 sq ft restroom. Fees waived per cdw misc electrical and plumbing. 5 4 09... Permit renewed (no fees - fire rebuild)... Vmt 6 9 08... Plan change; see c of a... Vmt Date: May 21, 2008 Value: $29,475 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 250-100-16-00 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent b: 452 sqft temporary tent. - amp sub panel Date: May 6, 2008 Value: $37,579 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 250-100-16-00 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent a: 452 sqft temporary tent. 1 amp service. Date: May 6, 2008 Value: $37,579 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 250-100-16-00 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent c: 452 sqft temporary tent. - this unit is ada compliant amp subpanel Date: May 6, 2008 Value: $37,579 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 250-100-16-00 | |||||
Firestorm 2007 angel fire rebuilding 432 sq ft girls cabin and 521 sq ft restroom. Original sq footages were 4 s f girls cabin and 4 sq ft restroom. Fees waived per cdw misc electrical and plumbing. Date: April 22, 2008 Value: $29,475 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1017-20 | Parcel: 250-100-16-00 | |||||
2007 fire (angel fire) rebuilding 20 sqft lodge consisting of 4 bedrooms, 2 bathrooms, and 1 living sitting room; 166 sqft deck. Original sqft was 20 sqft. P c change to 400-amp remote main panel w sub-panel Date: March 4, 2008 Value: $425,000 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 250-100-16-00 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent a: 452 sqft temporary tent. 1 amp service. Tent b: 452 sqft temporary tent. Tent c: 452 sqft temporary tent. Date: February 14, 2008 Value: $112,737 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2008-1017-20 | Parcel: 250-100-16-00 | |||||
2007 fire (angel fire) rebuilding 20 sqft lodge consisting of 4 bedrooms, 2 bathrooms, and 1 living sitting room; 166 sqft deck. Original sqft was 20 sqft. Date: November 19, 2007 Value: $425,000 Permit type: New primary comm str | Permit status: Completed | Permit id: Pds2007-1017-20 | Parcel: 250-100-16-00 | |||||
SCORE 97 Fire repair rebuild portion of stair and upper level deck walkway for blum lodge at camp stevens. Also rebuild handicapped accessible ramp per original. (damaged as a result of angel fire). ~~fees waived per cdw~~ Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2007-1021-20 | Parcel: 250-150-16-00 | |||||
SCORE 95 H. R. A. Roof mount photo voltaic system. 36 modules, 1 inverter, 5 kw for "camp stevens" Date: April 23, 2007 Contractor: Borrego Solar Systems Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 250-100-16-00 | |||||
1,7 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1,057 sq. Ft.) (second floor = 693 sq. Ft.), copy room, 2 storage rooms, 1 work room, 2 offices, reception area, 2 baths, and converence room. Also includes 2 amp service, temp power.-ded, 2 13 06 note: this structure is designated as a-ded, 2 13 06 12-15-06 - structural plan change only - see conditions of approval vam Date: November 9, 2006 Value: $125,125 Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2006-1019-20 | Parcel: 250-100-16-00 | |||||
Commercial or all other bldgs demolition permit -- as-built demo of 1152 sqft old workshop building (not workshop permitted under 1019-20020001) note: _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa dplu offices (5201 ruffin road) for more information. Date: October 2, 2006 Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2006-1005-20 | Parcel: 250-100-16-00 | |||||
1,7 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1,057 sq. Ft.) (second floor = 693 sq. Ft.), copy room, 2 storage rooms, 1 work room, 2 offices, reception area, 2 baths, and converence room. Also includes 2 amp service, temp power.-ded, 2 13 06 note: this structure is designated as a-ded, 2 13 06 Date: February 13, 2006 Value: $125,125 Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2006-1017-20 | Parcel: 250-100-16-00 | |||||
SCORE 61 Building a - 12 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers and building b - 642 sq ft meeting hall with fs. For camp stevens (protestant episcopal church). Date: February 28, 2005 Contractor: California Yurts Inc Permit type: Commercial multi-bld | Permit status: Completed | Permit id: Pds2005-1016-20 | Parcel: 250-100-16-00 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac/heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom/heat and ac exterior stairs and balconies Date: May 25, 2016 Value: $398,195 Permit type: Hotels, motels, tourist cabins | Permit status: Open | Permit id: Pds2016-Cmaspc- | Parcel: 2501501600 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent b 452 sqft temporary tent. - amp sub panel Date: May 6, 2008 Value: $37,579 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 2501001600 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent a 452 sqft temporary tent. 1 amp service. Date: May 6, 2008 Value: $37,579 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 2501001600 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent c 452 sqft temporary tent. - this unit is ada compliant amp subpanel Date: May 6, 2008 Value: $37,579 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2008-1019-20 | Parcel: 2501001600 | |||||
2007 fire streamline (angel fire) three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft, there is a regular floor plan and an ada floor plan, each floor plan consists of a lodging area and a restroom. 1 amp service. Credit 1356 sqft per clay westling. Tent a 452 sqft temporary tent. 1 amp service. Tent b 452 sqft temporary tent. Tent c 452 sqft temporary tent. Date: February 14, 2008 Value: $112,737 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2008-1017-20 | Parcel: 2501001600 | |||||
Commercial or all other bldgs demolition permit -- as-built demo of 1152 sqft old workshop building (not workshop permitted under 1019-20020001) note _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa dplu offices (5201 ruffin road) for more information. Date: October 2, 2006 Permit type: Demolition all other buildings | Permit status: Issued expired | Permit id: Pds2006-1005-20 | Parcel: 2501001600 | |||||
SCORE 97 Fire repair rebuild portion of stair and upper level deck walkway for blum lodge at camp stevens. Also rebuild handicapped accessible ramp per original. (damaged as a result of angel fire). ~~fees waived per cdw~~ Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2007-1021-20 | Parcel: 2501501600 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Date: May 25, 2016 Value: $398,195 Permit type: Hotels, motels, tourist cabins | Permit status: Open | Permit id: Pds2016-Cmaspc- | Parcel: 2501501600 | |||||
Demo existing 214 sqft bathroom, 752 sqft addn to existing dining hall, & minor remodel to existing dining hall create storage area & push out serving counter. Misc. Elec. Plum. & mech. For camp stevens 7 8 09 plan change see conditions of approval for details. 1srs Date: March 24, 2009 Value: $77,907 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2009-1017-20 | Parcel: 2501501600 | |||||
SCORE 97 2774 sqft 2 story lodge (6 rooms) w ac & fs, 1 sq. Ft. Retaining wall with level backfill, 2 amp service, misc. Elec., plum., & mech for camp stevens Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2009-1017-20 | Parcel: 2501501600 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: March 17, 2011 Value: $16,873 Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2011-1017-20 | Parcel: 2501501600 | |||||
1,7 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1,057 sq. Ft.) (second floor = 693 sq. Ft.), copy room, 2 storage rooms, 1 work room, 2 offices, reception area, 2 baths, and converence room. Also includes 2 amp service, temp power.-ded, 2 13 06 note this structure is designated as a-ded, 2 13 06 12-15-06 - structural plan change only - see conditions of approval vam Date: November 9, 2006 Value: $125,125 Permit type: Tenant improvement | Permit status: Completed | Permit id: Pds2006-1019-20 | Parcel: 2501001600 | |||||
1,7 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1,057 sq. Ft.) (second floor = 693 sq. Ft.), copy room, 2 storage rooms, 1 work room, 2 offices, reception area, 2 baths, and converence room. Also includes 2 amp service, temp power.-ded, 2 13 06 note this structure is designated as a-ded, 2 13 06 Date: February 13, 2006 Value: $125,125 Permit type: Tenant improvement | Permit status: Completed | Permit id: Pds2006-1017-20 | Parcel: 2501001600 | |||||
SCORE 97 Grading for plan check 1017-20090024 (2774 sqft 2 story lodge (6 rooms) w ac & fs, 2 amp service, misc. Elec., plum., & mech for camp stevens) Permit type: Lodges, frat & sorority house | Permit status: Completed | Permit id: Pds2009-1026-20 | Parcel: 2501501600 | |||||
SCORE 61 Building a - 12 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers for camp stevens (protestant episcopal church). See 1016-20050004 for all clearances. Building b - 642 sq ft meeting hall with fs. For camp stevens (protestant episcopal church). Permit type: 31 - assy - church, temple, mosque | Permit status: Issued expired | Permit id: Pds2005-1019-20 | Parcel: 250-100-16-00 | |||||
SCORE 100 Elec. Only to re-install modules to existing pv system (32 modules) hra original burned in angel fire system not to extend more than 5 above existing roof Date: January 5, 2009 Contractor: Watts New Under The Sun Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 250-100-16-00 | |||||
SCORE 61 Building a - 12 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers for camp stevens (protestant episcopal church). See 1016-20050004 for all clearances. Permit type: 31 - assy - church, temple, mosque | Permit status: Completed | Permit id: Pds2005-1017-20 | Parcel: 250-100-16-00 | |||||
SCORE 89 Replace electrical service destroyed by angel fire of 09 07. Service was 6 amps, new service to be 2 amps and will serve dining hall only as other structures formerly fed by this service were destroyed. ~~building inspector: please call in release to sdge with notation that this is meter "dh" (for dining hall). Date: September 19, 2007 Contractor: Stonewall Framing Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 250-150-16-00 | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Permit type: Hotels, motels, tourist cabins | Permit status: Completed | Permit id: Pds2016-Cmaspc- | Parcel: 2501501600 | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 3, 2017 Contractor: Watts New Under The Sun Inc Permit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony Permit type: Hotels, motels, tourist cabins | Permit status: Issued | Permit id: Pds2017-Comacc- | Parcel: 2501501600 | |||||
SCORE 100 (2) roof mount commercial solar pvs no. Of modules: 24 16 = no. Of inverters: 1 1 = 2 total system size in kilowatts: 5. 5 3. 6 = 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2010 Contractor: Watts New Under The Sun Permit type: Solar photovoltaic comml (non-hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 250-100-16-00 |