Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin # -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #11 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #12 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #13 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #14 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #16 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: February 17, 2012 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: March 17, 2011 Value: $13,824 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: February 17, 2012 | Permit id: Pds2011-1017-20 | |||||
SCORE 98 (2) roof mount commercial solar pvs no. Of modules: 24 16 = no. Of inverters: 1 1 = 2 total system size in kilowatts: 5. 5 3. 6 = 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2010 Contractor: John Henry Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: October 28, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 (2) roof mount commercial solar pvs no. Of modules 24 + 16 = no. Of inverters 1 + 1 = 2 total system size in kilowatts 5. 5 + 3. 6 = 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2010 Contractor: Watts New Under The Sun Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 28, 2010 | Permit id: Pds2010-1031-20 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac/heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom/heat and ac exterior stairs and balconies Date: May 25, 2016 Value: $398,195 Permit type: Commercial multi-bldg parent | Permit status: Open | Permit id: Pds2016-Cmaspc- | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Date: March 17, 2011 Value: $16,873 Permit type: New primary comm structure | Permit status: Completed | Completion date: February 17, 2012 | Permit id: Pds2011-1017-20 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Date: May 25, 2016 Value: $398,195 Permit type: Commercial multi-bldg parent | Permit status: Open | Permit id: Pds2016-Cmaspc- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 3, 2017 Contractor: Watts New Under The Sun Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Permit type: Bldg parent | Permit status: Completed | Completion date: April 26, 2017 | Permit id: Pds2016-Cmaspc- | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony Permit type: New commercial acc structure | Permit status: Issued | Permit id: Pds2017-Comacc- | |||||
Building site inspection Date: January 5, 2017 Permit status: Done | Permit id: Pds2016-Cmaspc- | |||||
Building site inspection Date: March 9, 2005 Permit status: Done | Permit id: Pds2005-1016-20 | |||||
Stormwater insp Date: July 17, 2013 Permit status: Monitor | Permit id: Pds2012-1014-20 | |||||
Stormwater insp Date: November 16, 2012 Permit status: Cancel | Permit id: Pds2012-1014-20 | |||||
Final Date: January 11, 2011 Permit status: Pass | Permit id: Pds2009-1019-20 | |||||
Final Date: December 21, 2010 Permit status: Fail | Permit id: Pds2009-1019-20 | |||||
Stormwater insp Date: November 30, 2009 Permit status: Monitor | Permit id: Pds2009-1019-20 | |||||
Lath/drywall - interior Date: December 5, 2008 Permit status: Pass | Permit id: Pds2008-1019-20 | |||||
Final Date: September 19, 2007 Permit status: Pass | Permit id: Pds2007-1007-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: December 15, 2006 Permit status: Pass | Permit id: Pds2006-1019-20 |