Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace (1) pole and install 433 ft of oh cable as indicated on attached prints - wr# 3461549 - hduperly - dac Date: August 25, 2015 Client: Pepco Holdings Inc | Permit type: Over head work; pole | Permit id: Pa114919 | |||||
Replace (1) pole, (2) guys, and install 299 ft oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: August 26, 2015 Client: Pepco Holdings Inc | Permit type: Over head work; guy | Permit id: Pa114960 | |||||
Replace (1) pole, (2) guys, and install 299 ft oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: December 14, 2015 Client: Pepco Holdings Inc | Permit type: Over head work; guy | Permit id: Pa114960-R2 | |||||
SCORE 95 Replace (1) pole and install 433 ft of oh cable as indicated on attached prints - wr# 3461549 - hduperly - dac Date: August 25, 2015 Contractor: Pepco Holdings Inc Permit type: Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire | Permit status: Permit expired | Expiration date: March 25, 2016 | Permit id: Pa114919 | |||||
SCORE 95 Replace (1) pole, (2) guys, and install 299 ft oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: August 26, 2015 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation | Permit status: Permit expired | Expiration date: November 12, 2015 | Permit id: Pa114960 | |||||
SCORE 95 Replace (1) pole, (2) guys, and install 299 ft oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: October 13, 2015 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation | Permit status: Permit expired | Expiration date: January 11, 2016 | Permit id: Pa114960-R1 | |||||
SCORE 95 Replace (1) pole, (2) guys, and install 299 ft oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: February 10, 2016 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation | Permit status: Permit expired | Expiration date: May 10, 2016 | Permit id: Pa114960-R3 | |||||
SCORE 95 Replace (1) pole and install 433 ft of oh cable as indicated on attached prints - wr# 3461549 - hduperly - dac Date: February 25, 2016 Contractor: Pepco Holdings Inc Permit type: Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire | Permit status: Permit expired | Expiration date: May 24, 2016 | Permit id: Pa114919-R1 | |||||
SCORE 95 Replace (1) pole and install 433 ft of oh cable as indicated on attached prints - wr# 3461549 - hduperly - dac Date: January 4, 2017 Contractor: Pepco Holdings Inc Permit type: Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire | Permit status: Assigned | Expiration date: May 22, 2017 | |||||
SCORE 95 Replace (1) pole, and (2) guy wires, install 299' oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: January 5, 2017 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation | Permit status: Assigned | Expiration date: August 7, 2017 | |||||
SCORE 100 Other reserved parking Date: September 22, 2010 Contractor: E2cr Inc Permit status: Expired | Expiration date: October 23, 2010 | Permit id: Pa10013216 | |||||
SCORE 100 Construction staging area Date: September 22, 2010 Contractor: E2cr Inc Permit status: Revoked | Expiration date: December 31, 2010 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: July 17, 2012 Contractor: E2cr C O Siva Balu Permit status: Expired | Expiration date: August 16, 2012 | Permit id: Pa10065989 | |||||
SCORE 95 Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: January 12, 2017 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: January 19, 2017 | Permit id: Pa114919-R5 | |||||
SCORE 95 Over head work; guy wire installation (each addl), over head work; guy wire installation (single or first one), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: February 10, 2016 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: May 10, 2016 | Permit id: Pa114960-R3 | |||||
SCORE 95 Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: February 25, 2016 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: May 24, 2016 | Permit id: Pa114919-R1 | |||||
SCORE 95 Replace (1) pole, and (2) guy wires, install 299' oh cable at 1101 howard rd se, as indicated on attached prints. Wr# 3461549 - hduperly - dac Date: April 28, 2017 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation | Permit status: Issued | Expiration date: July 28, 2017 | Permit id: Pa198906-R1 | |||||
SCORE 95 Replace (1) pole and install 433 ft of oh cable as indicated on attached prints - wr# 3461549 - hduperly - dac Date: February 21, 2017 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: May 19, 2017 | Permit id: Pa114919-R7 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (bpc-36) and a vibrating wire piezometer (vwpz: bps-35). The monitoring well and vwpz were installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a is now complete. Therefore, the wells installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). All wells will be abandoned following doee regulations. See attached work plan for more details. Date: July 3, 2017 Contractor: Siva Balu Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa208580 | |||||
SCORE 79 Excavation; boring test pit (each addl) Date: August 1, 2017 Contractor: Siva Balu Permit status: 8 | Expiration date: August 31, 2017 | Permit id: Pa208580 | |||||
SCORE 96 Refer to approved traffic control plan (tcp ) for permitted hours of work; drill 1 soil boring in the grass area 41 feet from the edge of howard road. The boring is in support of the dc water ltcp. The boring will be eight inches diameter and up to feet deep and drilled using a hand auger and air knife/vacuum extraction. Date: June 5, 2012 Contractor: Hsa Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 13, 2012 | Permit id: Pa72649 | |||||
SCORE 95 Over head work; guy wire installation (each addl), over head work; guy wire installation (single or first one), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: September 8, 2015 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: November 12, 2015 | Permit id: Pa114960 | |||||
SCORE 95 Over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: September 2, 2015 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: March 25, 2016 | Permit id: Pa114919 | |||||
SCORE 95 Over head work; guy wire installation (each addl), over head work; guy wire installation (single or first one), over head work; pole installation (single or first one), over head work; string electrical wire, over head work; pole removal (single or first one) Date: January 26, 2017 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: May 6, 2017 | Permit id: Pa198906 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (bpc-36) and a vibrating wire piezometer (vwpz: bps-35). The monitoring well and vwpz were installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a is now complete. Therefore, the wells installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). All wells will be abandoned following doee regulations. See attached work plan for more details. Date: August 1, 2017 Contractor: Jamie Miller, Aecom Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa208580 | |||||
SCORE 79 Construction staging area Date: January 10, 2013 Contractor: Chesapeake Electrical Systems Permit status: Permit expired | Expiration date: June 30, 2013 | Permit id: Pa10083508 | |||||
SCORE 99 Construction staging area Date: August 2, 2017 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 8, 2017 | Permit id: Pa10454361 |