Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 63 Removal of load bearing wall in basement, change location of stairs down to basement, make enclosed porch interior space, add/move windows and exterior door Permit type: Addition/alteration | Completion date: December 27, 2013 | Current use: One-family | Parcel: 26629 | |||||
SCORE 63 Adding a 3rd story to our ranch home - 3 bedrooms, an office, a laundry room, and two full bathrooms adjusting the first floor to accomodate those changes - changing the full bath to a half, adding stairs up and moving the stairs down to the basement total cost was 390,000. 00, less 68,050. From the plan 2830-2013 the job never was done and the permit was paid on it. See attached letter. Permit type: Addition/alteration | Completion date: January 13, 2016 | Current use: One-family | Parcel: 26629 | |||||
SCORE 63 Removal of load bearing wall in basement, change location of stairs down to basement, make enclosed porch interior space, add move windows and exterior door Permit type: Addition/alteration | Completion date: December 27, 2013 | Current use: One-family | Permit id: 0 | Parcel: 26629 | |||||
SCORE 89 Blown in cellulose from exterior sided walls Permit type: Addition/alteration | Completion date: September 19, 2016 | Current use: One-family | Permit id: 0 | Parcel: 26629 |