Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Contractor tbd. Remodel on 3 levels to include: a) add horizontal boards of reclaimed wood on p. T. 2x4 blocking on wall & rebuild heater surround & replace electrical fixture outlet switch in kitchen & install corner protector over exposed drywall in lower level du. B) remodel bathroom & laundry areas in main level du. C) remodel bathroom in upper level. Scope of work includes associated meps, to include make-up air. Scope updated 2 16 2017: upper level toilet location revised. Client: Family Pugh | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Multifamily dwellings, remodel | Permit id: Pmt2016-05442 | |||||
SCORE 100 Total tear-off & reroof of sfd, 21. 2 squares of asphalt shingles on a pitch represented as 7 12. Reroof house with owens corning - duration asphalt shingle; estate gray to match existing roofing as deatiled on landmark alteration certificate application dated 08. 18. 2017, his2017-00268. All roof materials shall be installed per manufacturerfoots specs. Client: Family Pugh | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-03835 |