Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Locate, repair, and replace sanitary sewer lateral. Attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. Date: June 21, 2010 Client: Dc Wasa | Permit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) | Permit status: Cancel/withdrawn | Expiration date: September 23, 2010 | |||||
SCORE 95 Connect 1019 otis place, n. W. With underground service by building of service conduit from an existing manhole; sidewalk of otis place west of 10th street, n. W. As indicated on the attached prints. Wr #533381 tcp #3 cut #26775 (fsj) Date: June 24, 2010 Contractor: Pepco Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: September 10, 2010 | Permit id: Pa56192 | |||||
SCORE 95 Connect 1019 otis place, n. W. With underground service by building of service conduit from an existing manhole; sidewalk of otis place west of 10th street, n. W. As indicated on the attached prints. Wr #533381 cut #26775 hours permitted to work are between 9: am to 5: pm monday thru friday. Date: August 30, 2010 Contractor: Pepco Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: October 25, 2010 | Permit id: Pa56192-R1 | |||||
SCORE 99 Locate, repair, and replace sanitary sewer lateral. Attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. Date: June 21, 2010 Contractor: Corinthian Contractors Inc Client: Dc Wasa | Permit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) | Permit status: Cancel/withdrawn | Expiration date: September 23, 2010 | |||||
SCORE 95 Excavation; electric connection (trench) Date: July 24, 2010 Contractor: Pepco Permit status: 8 | Expiration date: September 10, 2010 | Permit id: Pa56192 | |||||
SCORE 99 Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) Contractor: Corinthian Contractors Inc Permit status: 3 | Expiration date: September 23, 2010 | Permit id: 0 | |||||
SCORE 95 Construction staging area Date: August 26, 2010 Contractor: Pepco Holdings Inc Permit status: Withdrawn | Expiration date: September 30, 2010 | Permit id: 0 | |||||
SCORE 99 Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) Contractor: Corinthian Contractors Inc Permit status: 3 | Expiration date: September 23, 2010 | Permit id: 0 | |||||
SCORE 84 Moving truck Date: June 18, 2013 Contractor: David Quinn Permit status: Permit expired | Expiration date: June 30, 2013 | Permit id: Pa10101996 | |||||
SCORE 60 Moving truck Date: June 1, 2016 Contractor: Niraj Chokshi Permit status: Permit expired | Expiration date: June 11, 2016 | Permit id: Pa10287192 |