Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: March 13, 2009 Client: Marwood Rest Home Inc | Permit status: Completed | Permit id: 199869 | |||||
Electrical permit Date: May 5, 2009 Client: Marwood Rest Home Inc | Permit status: Completed | Permit id: 214071 | |||||
Suppression permit Date: March 13, 2009 Client: Marwood Rest Home Inc | Permit status: Completed | Permit id: 199869 | |||||
Electrical permit Date: May 5, 2009 Client: Marwood Rest Home Inc | Permit status: Completed | Permit id: 214071 | |||||
SCORE 100 Install one new circuit to the heating and air condition unit with a disconnect. Install 4 new receptacles to the reception att cubicle. All instalations in accordance with 2008 nec Date: November 7, 2017 Contractor: Russell Baysmore Client: Ak Lane Avenue Realty | Permit type: Electrical permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 830301 | |||||
SCORE 76 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: November 22, 2017 Contractor: Dc Mechanical Dcm Client: Ak Lane Avenue Realty | Permit type: Suppression permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 834322 | |||||
SCORE 100 Replacing ul-3 nozzles to existing system (dual kidde whdr-400). Date: March 13, 2009 Contractor: Keystone Fire Protection Client: Ak Lane Avenue Realty | Permit type: Suppression permit | Permit status: Completed | Completion date: September 2, 2010 | Permit id: 199869 | |||||
SCORE 100 Install new 2x2 over each bed change to separate switch at each bed (87) presntly door switch turns all lights on. 12 2 hcmc will be ran to new wall switch, as per 2005 nec (north dist) Date: May 5, 2009 Contractor: Granahan Electrical Cntr Inc Client: Ak Lane Avenue Realty | Permit type: Electrical permit | Permit status: Completed | Completion date: February 5, 2010 | Permit id: 214071 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 4, 2017 Contractor: Abj Sprinkler Co Inc Client: Ak Lane Avenue Realty | Permit type: Suppression permit | Permit status: Completed | Completion date: October 5, 2017 | Permit id: 770762 | |||||
SCORE 89 Level ii interior structural alterations (no change of occupancy) to expand lobby within existing nursing home to include removal of structural cmu wall and installation of new structural beam and column as per approved plans. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: May 25, 2017 Contractor: 3rd Generation Design And Constr Client: Ak Lane Avenue Realty | Permit type: Alteration permit | Permit status: Completed | Completion date: November 15, 2017 | Permit id: 774087 | |||||
SCORE 96 Replace approximatly ceiling fixtures Date: February 27, 2017 Contractor: Tec Client: Ak Lane Avenue Realty | Permit type: Electrical permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 762517 |