Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: May 24, 2007 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 78563 | |||||
Use permit Date: April 11, 2013 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 449669 | |||||
Use permit Date: July 16, 2010 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 291471 | |||||
Electrical permit Date: September 18, 2008 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 177870 | |||||
Zoning permit Date: October 24, 2008 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 158220 | |||||
Use permit Date: October 16, 2015 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 645641 | |||||
Electrical permit Date: September 18, 2008 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 177870 | |||||
Use permit Date: July 16, 2010 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 291471 | |||||
Use permit Date: April 11, 2013 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 449669 | |||||
Use permit Date: October 16, 2015 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 645641 | |||||
Plumbing permit Date: May 24, 2007 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 78563 | |||||
Zoning permit Date: October 24, 2008 Client: Sa Hamilton Lp | Permit status: Completed | Permit id: 158220 | |||||
Consolidate 2 existing parcels, clarify seperation of bldg structures and clarify current uses. 1st - 3rd floors front no changes. 1st floor front and rear (1016) restaraunt. 1016 rear offie study unoccupied. 2nd floor rear(1022) office studio event coordinator. Date: October 24, 2008 Client: Sa Hamilton Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: October 24, 2008 | Permit id: 158220 | |||||
SCORE 100 Replace 2 exit signs, 7 emg lights and lighting fixtures, and 1 - 200amp single panel on existing 200amp service as per 2005 nec (cc district) Date: September 18, 2008 Contractor: Joseph Santoro Client: Sa Hamilton Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 26, 2009 | Permit id: 177870 | |||||
Change from rest supplier to mixed martial studio Date: July 16, 2010 Client: Sa Hamilton Lp | Permit type: Use permit | Permit status: Completed | Completion date: July 16, 2010 | Permit id: 291471 | |||||
To document the use as mixed martial art onthe first floor, 1 apt on the 2nd floor and 1 apt on the 3rd floor Date: April 11, 2013 Client: Sa Hamilton Lp | Permit type: Use permit | Permit status: Completed | Completion date: April 11, 2013 | Permit id: 449669 | |||||
SCORE 76 For use of first and third floors to personal services, and second floor to accessory office. Date: October 16, 2015 Contractor: Perfectus Builders Client: Sa Hamilton Lp | Permit type: Use permit | Permit status: Completed | Completion date: May 5, 2017 | Permit id: 645641 | |||||
Consolidate the parcels know as 1016-1022 buttonwood street and 1025 hamilton street into one parcel per atached plans. Date: April 18, 2017 Client: Sa Hamilton Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 768803 | |||||
SCORE 96 For the installation of a new fire suppression system designed per nfpa 13 standard with a 6 inch fire service line and sprinkler layout as per plans. Date: November 7, 2017 Contractor: Accelerated Fire Protection In Client: Sa Hamilton Lp | Permit type: Suppression permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 818426 | |||||
SCORE 61 For mechanical alterations to existing space to include the installation of split system heat pumps, electric heater, and registers diffuers with associated duct work, as per approved plans. Date: October 30, 2017 Contractor: Mogan Inc Client: Sa Hamilton Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 816319 | |||||
SCORE 73 Interior alterations to the 1st floor of an existing structure. Alteration to include demolition and erection of non-bearing partitions, accessibility upgrades, casework and finishes. Space to be used as a brewery (on site brewing, assembly seating and storage). Structure is fully sprinklered. Separate permits required for plumbing, mechanical, electrical, fire suppression and signs. Date: August 31, 2017 Contractor: Holden Robert Associates Llc Client: Sa Hamilton Lp | Permit type: Alteration permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 773246 | |||||
SCORE 73 Remove replace concrete flooring, replace window in existing openings no change in size and location Date: May 24, 2017 Contractor: Holden Robert Associates Llc Client: Sa Hamilton Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 778775 | |||||
SCORE 73 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 28, 2017 Contractor: Holden Robert Associates Llc Client: Sa Hamilton Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 779109 | |||||
SCORE 73 For the change of use to sit-down restaurant and general industrial on the 1st floor and business and professional office on the 2nd and 3rd floors of an existing attached structure. No signs on this application. No change in height area. Date: August 31, 2017 Contractor: Holden Robert Associates Llc Client: Sa Hamilton Lp | Permit type: Use permit | Permit status: Completed | Completion date: August 31, 2017 | Permit id: 784257 | |||||
SCORE 82 Response to violation in old lims system a-301. 1 55 . Addition fixture installation Date: May 24, 2007 Contractor: Charles Jowers Client: Sa Hamilton Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 2, 2008 | Permit id: 78563 | |||||
SCORE 73 For the installation of a transformer room in the basement level of an existing building. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: August 23, 2017 Contractor: Holden Robert Associates Llc Client: Sa Hamilton Lp | Permit type: Alteration permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 794847 | |||||
SCORE 89 Alterations:interior plumbing;sit-down restaurant and general industrial on the 1st floor and business and professional office on the 2nd and 3rd floors;domestic water & sanitary & storm drainage; water closets, lavatory sinks, floor drains, hand sinks, urinals, mop receptor,& floor sinks, including appuratus - the installation will comply with the philadelphia plumbing code 2004 Date: October 31, 2017 Contractor: Murphys Plumbing And Heating Inc Client: Sa Hamilton Lp | Permit type: Plumbing permit | Permit status: Active | Completion date: November 20, 2017 | Permit id: 821174 |