Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Res electrical meter panel replacement, 100amp Date: December 14, 2016 Contractor: Interwest Electric Co Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 3, 2017 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). 11-21-2017 scope change to remove battery back up from scope. See approved plans dated 10-31-2017. Maz 09-29-2017 scope change to match plans with battery backup unit. Ssh this permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 29, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Completed | Completion date: November 22, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: December 30, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Res electrical meter panel replacement, 100amp Date: December 14, 2016 Contractor: Interwest Electric Co Permit type: Electrical only | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 5052706500 |