Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
After hours permit for monday thru friday from 7pm to 12am ![]() Client: Department Of General Services Dcps | Applicant: Department Of G Dcps; Douglas Foster | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300032 | |||||
Drilling of 163 vertical closed loop geothermal well to a 4 foot depth for geothermal field. Mud rotary drilling application to drill an 8. 5 inch borehole to top competent bedrock. Install 5. 5624 inch casing 5. 25 inch borehole from there to target depth. ![]() Client: Department Of General Services Dcps | Applicant: Department Of G Dcps; Chris Blanchet | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300030 | |||||
Tower crane for use on jobsite to hoiste material and concrete ![]() Client: Miller?long | Applicant: Miller?long; William Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1200015 | |||||
To erect a 4 story new building and site improvements of high school for 11 students and 1 staff. ![]() Client: District Of Columbia | Applicant: Douglas Foster | Permit type: New building | Permit status: Permit issued | Permit id: B1206276 | |||||
Permit for lift on private property. ![]() Client: P?d Contractors Llc | Applicant: P?d Contractors Llc; Robert Green | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1214032 | |||||
Electrical ![]() Client: District Of Columbia | Applicant: Wayne H. Robinson | Permit status: Completed | Permit id: E1208192 | |||||
Installation of new kitchen equipment. ![]() Client: District Of Columbia | Applicant: Doug Foster | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1301212 | |||||
To amend the existing building permit #b1301212 and b1214032 which would include the installation of a swimming pool. ![]() Client: District Of Columbia | Applicant: Douglas Foster | Permit type: Swimming pool | Permit status: Completed | Permit id: Sp1300020 | |||||
Sundays only from 7:00am to 5:00pm ![]() Client: Pepco | Applicant: Doug Foster | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300413 | |||||
Ater hours permit for monday though friday from the hours of 7:00am to 11:00pm and sundays from 7:00am to 3:00pm. To start on friday, march 1, 2013 to sunday, march 31, 2013. ![]() Client: Department Of General Services Dcps | Applicant: Douglas Foster | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300388 | |||||
The phase 2a portion of the dunbar sr. Hs project includes drilling, loop installation, grouting, and horizontal connections of 51 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling applicaiton. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() Client: District Of Columbia | Applicant: Teddy Gebremich Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400053 | |||||
The purpose of the environmental site assessment is to evaluate the subsurface environment, where accessible, to determine if the past use of the property as a gasoline station or the past use of neighboring properties has impacted the subsurface soils and groundwater. The scope of service will involve using a hollow-stem auger drilling rig to complete the installation of 7 two-inch diameter groundwater monitoring wells feet below ground surface to facilitate the collection of groundwater samples. The wells will be constructed of gauge pvc with 10-slot well screen. Number 2 sand will be used around the screen with bentonite and grout to seal the well in place. During drilling operations soil samples will be collected, field screened and submitted for laboratory analysis. ![]() Client: District Of Columbia Department Of General Services | Applicant: Jason Beck | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400062 | |||||
Ecs will conduct a membrane interface probe mip investigation in the vicinity of the former gasoline station. The investigation will include the completion of soil borings. The borings will be 2 inch in diameter, completed with direct push drilling technology i. E. Geoprobe and completed at a depth of feet below ground surface. The borings will be used to collect environmental data. The borings will be abandoned the same day as drilled using a tremmie pipe and a bentonite powder slurry. See the attached work plan for additional details. ![]() Client: District Of Columbia Department Of General Service | Applicant: District Of Columbia Department Of; Ecs Mid Atlantic, Llc Poc - Jason B | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400110 | |||||
Perform three geotechnical borings, each extended to a depth of feet below the existing ground surface. Borings will be completed using hollow stem augers and be approximately 6-inch diameter. Borings will be performed utilizing an atv or truck mounted auger drill rig. ![]() Client: Teddy Gebremichael Dc - Dgs | Applicant: Stephen Patt Ecs Mid-Atlantic, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400085 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1303900 | |||||
Type of elevator: one ( 1) electric/ passenger elevator (elevator #2) cost ot installation: 122,334. 00 ![]() Client: District Of Columbia | Applicant: Kone Inc | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1301562 | |||||
Type of elevator: one ( 1) electric/ passenger elevator( elevator # 1) cost ot installation: 122,334. 00 ![]() Client: District Of Columbia | Applicant: Kone Inc | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1301563 | |||||
As directed by ddoe toxic substance division in a letter from mr. Richard jackson, dated february 21, 2014, ecs will install a total of four deep monitoring wells in areas where mip results indicated the potential presence of possible chlorinated solvents. The mip boring locations selected for deep monitoring well installation include m1, m2, m6, and m7. These wells are in addition to previously proposed wells in the area of the former usts. In addition to the four deep wells one additional deep well will be placed in the geothermal well. One shallow well will also be placed next to mip location m7 to monitor the upper aquifer conditions. In total this work plan covers the installation and sampling of six monitoring wells. The locations of the proposed monitoring wells are depicted on figure 1. The wells will be installed using a hollow-stem auger rig. Five of the wells will be completed to approximately 45 ft below ground surface and one well will be installed to approximately 25 ft b ![]() Client: District Of Columbia Department Of General Service Gebrmichael | Applicant: Ecs Mid-Atlanti Ecs Mid-Atlantic | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400192 | |||||
The phase 2a. 2 portion of the dunbar sr. High school project includes drilling, loop installation, grouting, and horizontal connections of 76 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling application. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() Client: Teddy Gebremichael Department Of General Services | Applicant: Teddy Gebremich Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400159 | |||||
The phase 2b portion of the dunbar sr. High school project includes drilling, loop installation, grouting, and horizontal piping connections of 69 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling application. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() Client: Teddy Gebremichael Dept Of General Services | Applicant: Teddy Gebremich Dept Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400203 | |||||
The purpose of the monitoring well installations and sampling is to evaluate the subsurface environment, where accessible, to determine if the past use of the property or the past use of neighboring properties has impacted the subsurface soils and groundwater. The scope of service will involve the installation (using hsa) of nine two-inch groundwater monitoring wells, to facilitate the collection of groundwater samples in the vicinity of the former usts area. During drilling operations soil samples will be collected, field screened and submitted for laboratory analysis. The locations of the monitoring wells are depicted on figure 1 in relation to previous environmental borings advanced on the property. ![]() Client: District Of Columbia Department Of General Service | Applicant: Ecs Mid-Atlanti Gebremichael | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400166 | |||||
The purpose of this work plan is to describe the method and procedures for the abandonment of nine of the monitoring wells located at the dunbar high school. The monitoring wells must be abandoned to allow the construction of the athletic track and field to continue. The monitoring wells will be abandoned by making an attempted to remove the 2-inch pvc from the ground. If the pvc cannot be removed, a tool will be inserted into the well to rip the pvc to ensure that the well casing and screen are filled with the grout material. After the pvc has either been removed or ripped, powdered bentonite slurry with a 60: mix ratio of 1 lbs bentanite powder 94lbs cement and 82 gallons of water will then be placed using a tremie pipe from the bottom of the well/boring to the surface. Any waste material generated will be disposed of appropriately ![]() Client: District Of Columbia Department Of General Service | Applicant: Ecs Mid Atlantic, Llc - Jason Beck | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400308 | |||||
Replace kone mx machine estimated cost of work :6,000. 00 ![]() Client: District Of Columbia | Applicant: Kone Inc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1402438 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: E1208192 | |||||
SCORE 84 Mechanical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: M1202129 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1204121 | |||||
SCORE 96 Plumbing and gas ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1207862 | |||||
SCORE 89 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: E1306298 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1302384 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1303900 | |||||
SCORE 56 The purpose of this work plan is to describe the method and procedures for the abandonment of nine of the monitoring wells located at the dunbar high school. The monitoring wells must be abandoned to allow the construction of the athletic track and field to continue. The monitoring wells will be abandoned by making an attempted to remove the 2-inch pvc from the ground. If the pvc cannot be removed, a tool will be inserted into the well to rip the pvc to ensure that the well casing and screen are filled with the grout material. After the pvc has either been removed or ripped, powdered bentonite slurry with a 60: mix ratio of 1 lbs bentanite powder 94lbs cement and 82 gallons of water will then be placed using a tremie pipe from the bottom of the well/boring to the surface. Any waste material generated will be disposed of appropriately ![]() ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400308 | |||||
SCORE 56 Permit for lift on private property. ![]() ![]() Client: P?d Contractors Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214032 | |||||
SCORE 84 Mechanical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: M1202129 | |||||
SCORE 56 Ecs will conduct a membrane interface probe mip investigation in the vicinity of the former gasoline station. The investigation will include the completion of soil borings. The borings will be 2 inch in diameter, completed with direct push drilling technology i. E. Geoprobe and completed at a depth of feet below ground surface. The borings will be used to collect environmental data. The borings will be abandoned the same day as drilled using a tremmie pipe and a bentonite powder slurry. See the attached work plan for additional details. ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400110 | |||||
SCORE 65 Perform three geotechnical borings, each extended to a depth of feet below the existing ground surface. Borings will be completed using hollow stem augers and be approximately 6-inch diameter. Borings will be performed utilizing an atv or truck mounted auger drill rig. ![]() ![]() Client: Teddy Gebremichael Dc - Dgs | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400085 | |||||
SCORE 56 Drilling of 163 vertical closed loop geothermal well to a 4 foot depth for geothermal field. Mud rotary drilling application to drill an 8. 5 inch borehole to top competent bedrock. Install 5. 5624 inch casing 5. 25 inch borehole from there to target depth. ![]() ![]() Client: Department Of General Services Dcps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300030 | |||||
SCORE 79 After hours permit for monday thru friday from 7pm to 12am ![]() ![]() Client: Department Of General Services Dcps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300032 | |||||
SCORE 89 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: E1306298 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1302384 | |||||
SCORE 56 Ecs will conduct a membrane interface probe mip investigation in the vicinity of the former gasoline station. The investigation will include the completion of soil borings. The borings will be 2 inch in diameter, completed with direct push drilling technology i. E. Geoprobe and completed at a depth of feet below ground surface. The borings will be used to collect environmental data. The borings will be abandoned the same day as drilled using a tremmie pipe and a bentonite powder slurry. See the attached work plan for additional details. ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400110 | |||||
SCORE 56 Tower crane for use on jobsite to hoiste material and concrete ![]() ![]() Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1200015 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: E1209370 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1204121 | |||||
SCORE 96 Plumbing and gas ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1207862 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: E1208192 | |||||
SCORE 96 Installation of new kitchen equipment. ![]() ![]() Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1301212 | |||||
SCORE 99 Ater hours permit for monday though friday from the hours of 7:00am to 11:00pm and sundays from 7:00am to 3:00pm. To start on friday, march 1, 2013 to sunday, march 31, 2013. ![]() ![]() Client: Department Of General Services Dcps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300388 | |||||
SCORE 96 Sundays only from 7:00am to 5:00pm ![]() ![]() Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300413 | |||||
SCORE 62 The phase 2a portion of the dunbar sr. Hs project includes drilling, loop installation, grouting, and horizontal connections of 51 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling applicaiton. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() ![]() Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400053 | |||||
SCORE 56 The purpose of the environmental site assessment is to evaluate the subsurface environment, where accessible, to determine if the past use of the property as a gasoline station or the past use of neighboring properties has impacted the subsurface soils and groundwater. The scope of service will involve using a hollow-stem auger drilling rig to complete the installation of 7 two-inch diameter groundwater monitoring wells feet below ground surface to facilitate the collection of groundwater samples. The wells will be constructed of gauge pvc with 10-slot well screen. Number 2 sand will be used around the screen with bentonite and grout to seal the well in place. During drilling operations soil samples will be collected, field screened and submitted for laboratory analysis. ![]() ![]() Client: District Of Columbia Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400062 | |||||
SCORE 99 To amend the existing building permit #b1301212 and b1214032 which would include the installation of a swimming pool. ![]() ![]() Client: District Of Columbia | Permit type: Swimming pool | Permit status: Completed | Permit id: Sp1300020 | |||||
SCORE 62 The phase 2a. 2 portion of the dunbar sr. High school project includes drilling, loop installation, grouting, and horizontal connections of 76 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling application. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() ![]() Client: Teddy Gebremichael Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400159 | |||||
SCORE 56 The purpose of the monitoring well installations and sampling is to evaluate the subsurface environment, where accessible, to determine if the past use of the property or the past use of neighboring properties has impacted the subsurface soils and groundwater. The scope of service will involve the installation (using hsa) of nine two-inch groundwater monitoring wells, to facilitate the collection of groundwater samples in the vicinity of the former usts area. During drilling operations soil samples will be collected, field screened and submitted for laboratory analysis. The locations of the monitoring wells are depicted on figure 1 in relation to previous environmental borings advanced on the property. ![]() ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400166 | |||||
SCORE 56 As directed by ddoe toxic substance division in a letter from mr. Richard jackson, dated february 21, 2014, ecs will install a total of four deep monitoring wells in areas where mip results indicated the potential presence of possible chlorinated solvents. The mip boring locations selected for deep monitoring well installation include m1, m2, m6, and m7. These wells are in addition to previously proposed wells in the area of the former usts. In addition to the four deep wells one additional deep well will be placed in the geothermal well. One shallow well will also be placed next to mip location m7 to monitor the upper aquifer conditions. In total this work plan covers the installation and sampling of six monitoring wells. The locations of the proposed monitoring wells are depicted on figure 1. The wells will be installed using a hollow-stem auger rig. Five of the wells will be completed to approximately 45 ft below ground surface and one well will be installed to approximately 25 ft b ![]() ![]() Client: District Of Columbia Department Of General Service Gebrmichael | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400192 | |||||
SCORE 56 The phase 2b portion of the dunbar sr. High school project includes drilling, loop installation, grouting, and horizontal piping connections of 69 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling application. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. ![]() ![]() Client: Teddy Gebremichael Dept Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400203 | |||||
SCORE 95 Replace kone mx machine estimated cost of work :6,000. 00 ![]() ![]() Client: District Of Columbia | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1402438 | |||||
SCORE 99 To erect a 4 story new building and site improvements of high school for 11 students and 1 staff. ![]() ![]() Client: District Of Columbia | Permit type: New building | Permit status: Permit issued | Permit id: B1206276 | |||||
SCORE 56 Permit for lift on private property. ![]() ![]() Client: P?d Contractors Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214032 | |||||
SCORE 56 Drilling of 163 vertical closed loop geothermal well to a 4 foot depth for geothermal field. Mud rotary drilling application to drill an 8. 5 inch borehole to top competent bedrock. Install 5. 5624 inch casing 5. 25 inch borehole from there to target depth. ![]() ![]() Client: Department Of General Services Dcps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300030 | |||||
SCORE 79 After hours permit for monday thru friday from 7pm to 12am ![]() ![]() Client: Department Of General Services Dcps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300032 | |||||
SCORE 56 Tower crane for use on jobsite to hoiste material and concrete ![]() ![]() Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1200015 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: E1209370 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: E1208192 | |||||
SCORE 88 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: E1207782 | |||||
SCORE 96 Plumbing and gas ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1207862 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: P1204121 | |||||
SCORE 84 Mechanical ![]() ![]() Client: District Of Columbia | Permit status: Completed | Permit id: M1202129 | |||||
SCORE 56 Ecs will conduct a membrane interface probe mip investigation in the vicinity of the former gasoline station. The investigation will include the completion of soil borings. The borings will be 2 inch in diameter, completed with direct push drilling technology i. E. Geoprobe and completed at a depth of feet below ground surface. The borings will be used to collect environmental data. The borings will be abandoned the same day as drilled using a tremmie pipe and a bentonite powder slurry. See the attached work plan for additional details. ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400110 | |||||
SCORE 65 Perform three geotechnical borings, each extended to a depth of feet below the existing ground surface. Borings will be completed using hollow stem augers and be approximately 6-inch diameter. Borings will be performed utilizing an atv or truck mounted auger drill rig. ![]() ![]() Client: Teddy Gebremichael Dc - Dgs | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400085 | |||||
SCORE 89 Electrical ![]() ![]() Client: District Of Columbia | Permit status: Permit issued | Permit id: E1306298 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1302384 | |||||
Plumbing and gas ![]() Client: District Of Columbia | Permit status: Completed | Permit id: P1303900 | |||||
SCORE 56 The purpose of this work plan is to describe the method and procedures for the abandonment of nine of the monitoring wells located at the dunbar high school. The monitoring wells must be abandoned to allow the construction of the athletic track and field to continue. The monitoring wells will be abandoned by making an attempted to remove the 2-inch pvc from the ground. If the pvc cannot be removed, a tool will be inserted into the well to rip the pvc to ensure that the well casing and screen are filled with the grout material. After the pvc has either been removed or ripped, powdered bentonite slurry with a 60: mix ratio of 1 lbs bentanite powder 94lbs cement and 82 gallons of water will then be placed using a tremie pipe from the bottom of the well boring to the surface. Any waste material generated will be disposed of appropriately ![]() ![]() Client: District Of Columbia Department Of General Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400308 | |||||
SCORE 56 Remove and replace one antenna per sector totaling three. ![]() Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600240 | |||||
SCORE 95 Type of elevator: one ( 1) electric/ passenger elevator (elevator #2) cost ot installation: 122,334. 00 ![]() ![]() Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1301562 | |||||
SCORE 95 Type of elevator: one ( 1) electric/ passenger elevator( elevator # 1) cost ot installation: 122,334. 00 ![]() ![]() Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1301563 |