Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 23, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
2800sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material conc tile proposed roofing material ct. Wt. Bel air 297 tile manufacturer eagle brand and model belair 297 lt. Wt. Color (if cool roof required) grey built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: February 22, 2016 Value: $16,604 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 23, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 23, 2016 Contractor: Sherlock Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 2800sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material conc tile proposed roofing material ct. Wt. Bel air 297 tile manufacturer eagle brand and model belair 297 lt. Wt. Color (if cool roof required) grey built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 23, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: February 20, 2017 Permit status: Fail | Permit id: Pds2016-Resalt- | |||||
Final Date: March 21, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- |