Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning use permit Date: January 23, 2017 Client: V2 Properties Llc | Permit status: Completed | Permit id: 746953 | |||||
Addition permit Date: January 23, 2017 Client: V2 Properties Llc | Permit status: Active | Permit id: 745157 | |||||
Demolition permit Date: May 20, 2016 Client: V2 Properties Llc | Permit status: Completed | Permit id: 676170 | |||||
Zoning use permit Date: May 20, 2016 Client: V2 Properties Llc | Permit status: Completed | Permit id: 693340 | |||||
Plumbing permit Date: December 28, 2016 Client: V2 Properties Llc | Permit status: Active | Permit id: 739742 | |||||
Addition permit Date: October 18, 2016 Client: V2 Properties Llc | Permit status: Revoked | Permit id: 685355 | |||||
Use permit Date: November 19, 2013 Client: Triglia Kathleen | Permit status: Completed | Permit id: 506994 | |||||
We have been in a payment agreement for 15 months (total agreement is 24 months) and have fallen 4 months behind. We are in the process of obtaining funds to become current, but will be put in extreme hardship if we are forced to cease. Date: December 26, 2014 Client: V2 Properties Llc | Applicant: Kenneth Snock | Permit type: Appeal | Permit status: Withdrawn | Permit id: 24314 | |||||
SCORE 89 Install new 600amp service and wiring throughout with new switches, outlets, gfci and light fixtures as per 2008 nec (south district) Date: June 5, 2017 Contractor: Green Team Electric Inc Permit type: Electrical permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 781849 | |||||
SCORE 100 Installation of fire alarm (nfpa-72) to include main panel, smoke detectors, horn strobes, pull stations. Date: August 15, 2017 Contractor: Tech Electric Services Inc Permit type: Electrical permit | Permit status: Active | Completion date: August 15, 2017 | Permit id: 793487 | |||||
SCORE 86 Amendment to building permit # 7634 to address city planning commission (cpc) queen village pre-requisite approval requirement for building facade exterior - elimination of any previously approved stucco from exterior and replacement with brick, wood and or metal finishes in accordance with sheet a-2 approved by cpc on august 24, 2017. No other changes approved by this amendment. Date: September 12, 2017 Contractor: Celtic Conversions Llc Client: &b Homes Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 814274 | |||||
SCORE 100 Replace water service main to bldg Date: August 25, 2017 Contractor: B. M. Consulting Services Inc Client: &b Homes Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 811532 | |||||
SCORE 100 Install 350amp service, 4 gang meter, 4 sub panels, all proper grounding and bonding, complete rewire with recepts,switches,lights,fixtures,smoke and co derectors as per 2008 nec (south district) Date: June 13, 2017 Contractor: Bongiovanni Samuel M Client: &b Homes Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 23, 2017 | Permit id: 787116 | |||||
SCORE 89 Installation of: 3- water closets, 3- lavatories, 3- bathtubs, 3- kitchen sinks, 3- washers, 3- water heaters Date: May 23, 2017 Contractor: Thomas D Lepore Client: &b Homes Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 785423 | |||||
SCORE 100 Automatic sprinkler system w. Two (2) inch fire service & backflow prevention (bfp) assembly for previously approved three (3) story above grade plane, w. Unoccupied basement, multi-family dwelling. Automatic sprinkler system install per nfpa 13r. Date: June 20, 2017 Contractor: B. M. Consulting Services Inc Client: &b Homes Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 785170 | |||||
SCORE 89 Install all suppy and return ductwork for each floor, all condensers will be on the roof,2nd and 3rd fl heaters will be in mechanical rooms,1st fl heater in basement Date: May 16, 2017 Contractor: Luxury Heating And Cooling Client: &b Homes Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 783961 | |||||
SCORE 86 Limited exterior alterations including wall infill and bilco door removal; interior alterations throughout an existing three (3) story structure to create three (3) dwelling units. As-built conditions being legalized are certified by professional engineer trevor a. Henry, pe038964r. No floor framing modifications (as shown in plans). Building to be fully sprinklered; separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: May 15, 2017 Contractor: Celtic Conversions Llc Client: &b Homes Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 763440 | |||||
SCORE 98 Interior demo of non load bearing partitions only. (multi-family) 3rd floor Date: November 2, 2016 Contractor: Sinni Removal Services Llc Client: &b Homes Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 733799 | |||||
SCORE 98 Interior demo of non load bearing partitions only. (multi-family) 2nd floor Date: October 27, 2016 Contractor: Sinni Removal Services Llc Client: &b Homes Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 732222 | |||||
SCORE 98 Interior demo of non load bearing partitions only. (multi-family) 1st floor only. Date: October 19, 2016 Contractor: Sinni Removal Services Llc Client: &b Homes Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 730413 | |||||
Legalize as a triplex. Certificate of occupancy required prior to occupying. Date: November 19, 2013 Client: &b Homes Llc | Permit type: Use permit | Permit status: Completed | Completion date: November 19, 2013 | Permit id: 506994 | |||||
SCORE 100 Installing (7) complete hvac systems, (2) 60k btu furnaces @ 90% on 1st, 2nd, and 3rd floors, (1) 60k btu furnace @ 90% on the 4th floor 2 ton a c and with all related ductwork. All units are self contained. Date: April 21, 2017 Contractor: Ss Mechanicals Hvac Permit type: Mechanical permit | Permit status: Active | Completion date: November 13, 2017 | Permit id: 777087 | |||||
SCORE 89 For the installation of a two (2) inch fire service line with backflow preventor for the installation of fire suppression system per nfpa 13r. All work shall be done in accordance with approved plans calculations. Date: April 11, 2017 Contractor: Aqueduct Fire Protection Permit type: Suppression permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 768346 | |||||
4 story addtion to rear of 3 story building . Interior renovation of 3 story multi family building. Addtion to include pilot house and roof deck Date: January 23, 2017 Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 31, 2017 | Permit id: 746953 | |||||
For the erection of a light-framed structural addition on an existing structure to include underpinning of existing structure, new foundation system, new framing joists and braced wall plans throughout, interior stair shaft enclosure installation, guardrail attachments, egress window well and interior wall floor ceiling finishing throughout. Separate permits to be required for electrical, mechanical, plumbing, and fire suppression system installation. Asbestos abatement to be completed prior to commencement of permit work scope. Approval of construction plans does not bestow any right to obstruct a deeded easement to remain clear for common use. Date: January 23, 2017 Permit type: Addition permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 745157 | |||||
SCORE 100 Addition: interior plumbing of an existing 3-story bldg. And a 4-story addition with (7) dwelling units (multi-family). The installation will comply with the philadephia plumbing code, 2004. Additional permits are required for the 6" sewer lateral and the (7) 1-1 2" domestic water distribution services to the street mains, as well as the (7) backflow prevention containment assemblies, on the main domestic water supplies. Pre-approval of the (7) 1-1 2" domestic water distributions and water meter locations is required from the philadelphia water department. Contact erik smith (215 685 6270) & vincent brindisi (215 828 0686). Date: December 28, 2016 Contractor: Roger Ross Plumbing And Htg Inc Permit type: Plumbing permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 739742 | |||||
SCORE 82 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.-(interior demolition throughout) Date: November 7, 2016 Contractor: Jb Contractors Llc Permit type: Demolition permit | Permit status: Completed | Completion date: July 18, 2017 | Permit id: 734684 | |||||
SCORE 93 Demolitionof 1-story building rear addition Date: May 20, 2016 Contractor: Ricco Construction Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 20, 2016 | Permit id: 693340 | |||||
4 story addition to include pilot house and roof deck to rear of existing 3 story building. Int renovations of multi family dwelling Date: October 18, 2016 Permit type: Zoning/use permit | Permit status: Revoked | Completion date: October 18, 2016 | Permit id: 685359 | |||||
For the erection of a light-framed structural addition on an existing structure to include underpinning of existing structure, new foundation system, new framing joists and braced wall plans throughout, interior stair shaft enclosure installation, guardrail attachments, and interior wall floor ceiling finishing throughout. Separate permits to be required for electrical, mechanical, plumbing, and fire suppression system installation. Asbestos abatement to be completed prior to commencement of permit work scope. Date: October 18, 2016 Permit type: Addition permit | Permit status: Revoked | Completion date: January 31, 2017 | Permit id: 685355 | |||||
SCORE 93 For the complete demoltion of an attached one-story portion to a three-story structure. Full sidewalk and street closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Date: May 20, 2016 Contractor: Ricco Construction Permit type: Demolition permit | Permit status: Completed | Completion date: July 6, 2016 | Permit id: 676170 |