Building Permits at 10 Euclid Av Boulder CO


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 10 Euclid Av Boulder CO over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
99
Beach park (13th and euclid) - refurbishment of playground, bike path, picnic areas, additional landscaping and new pedestrian lighting (12high poles)
Date:  July 17, 2000
Value:   $220,000
Contractor: City Of Boulder

Client: City Of Boulder | Applicant: City Of Boulder | Permit type: Building, electrical | Permit status: N&v | Current use: Amusement/recre
2000/07/172200009912 Euclid Av Boulder CoCity Of Boulder
SCORE
100
Electrical permit for spinkler pedestal corrections at beach park (s. Of euclid ave. Between 12th and 13th streets)
Date:  March 7, 2012
Contractor: Excel Electric Inc

Client: Of City | Applicant: Excel Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: April 24, 2012 | Current use: Government uses
2012/03/07010012 Euclid Av Boulder CoExcel Electric Inc
SCORE
95
Electrical permit for spinkler pedestal corrections at beach park (s. Of euclid ave. Between 12th and 13th streets)
Date:  March 9, 2012
Value:   $98

Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: April 24, 2012 | Current use: Government uses, existing | Permit id: Pmt2012-00953
2012/03/09989512 Euclid Av Boulder CoExcel Electric, Inc
SCORE
98
Beach park (13th and euclid) - refurbishment of playground, bike path, picnic areas, additional landscaping and new pedestrian lighting (12foothigh poles)
Date:  August 14, 2000
Value:   $220,000

Client: City Of Boulder | Permit type: Building, electrical, sitework | Permit status: N&v | Current use: Amusement/recreational - outdoor, remode | Permit id: Pmt2000-01339
2000/08/142200009812 Euclid Av Boulder CoPiper Electric Co Inc
SCORE
100
Replace low pressure boiler with a 105,0 btu unit.
Date:  September 5, 2003

Client: Raismes De | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Single family d
2003/09/0501009 Euclid Av Boulder CoSave Home Heat Co. Inc
SCORE
93
Installation of cedar privacy fence along rear property line. Fence to be maximum 6-feet in height, 48-feet total length.
Date:  June 11, 2007
Contractor: Contours Fence

Client: Raismes De | Applicant: Contours Fence | Permit type: Fence | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family d
2007/06/110939 Euclid Av Boulder CoContours Fence
SCORE
95
In-property sewer service repair only!
Date:  January 22, 2013

Client: Raismes De | Applicant: Pipeline Industries, Inc | Permit type: Wastewater | Permit status: Iss
2013/01/220959 Euclid Av Boulder CoPipeline Industries Inc
SCORE
100
New water heater
Date:  March 27, 2015

Client: Raismes De | Applicant: Colorado Delta Mechanical, Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family a
2015/03/2701009 Euclid Av Boulder CoColorado Delta Mechanical Inc
SCORE
95
In-property sewer service repair only!
Date:  January 22, 2013

Client: Raismes De | Permit type: Wastewater | Permit status: Iss | Permit id: Pmt2013-00258
2013/01/220959 Euclid Av Boulder CoPipeline Industries, Inc
SCORE
100
New water heater
Date:  March 27, 2015
Value:   $1,156

Client: Raismes De | Permit type: Mechanical | Permit status: Iss | Current use: Single family attached dwelling, existin | Permit id: Pmt2015-20094
2015/03/2711561009 Euclid Av Boulder CoColorado Delta Mechanical, Inc
SCORE
100
Replace low pressure boiler with a 105,0 btu unit.
Date:  December 4, 2003
Value:   $3,767

Client: Raismes De | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-03784
2003/12/0437671009 Euclid Av Boulder CoSave Home Heat Co., Inc
SCORE
93
Installation of cedar privacy fence along rear property line. Fence to be maximum 6-feet in height, 48-feet total length.
Date:  June 11, 2007
Value:   $1,500
Contractor: Contours Fence

Client: Raismes De | Permit type: Fence | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02330
2007/06/111500939 Euclid Av Boulder CoContours Fence
SCORE
100
Roofing permit for repair of 14 squares of 3 tab shingles at 4:12 slope.
Date:  March 23, 2006

Client: Of Archdiocese | Applicant: A A A Roofing & Insulation | Permit type: Roofing | Permit status: Cmp | Completion date: November 25, 2008 | Current use: Religious assem
2006/03/23010015 Euclid Av Boulder CoA A A Roofing And Insulation
SCORE
100
Installation of secondary electric, pedestal in alley, and reconstrctuion of pole
Date:  July 21, 2005
Contractor: Xcel Energy

Client: Of Archdiocese | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss
2005/07/21010015 Euclid Av Boulder CoXcel Energy
SCORE
95
Underground electrical service in alley, per xcel
Date:  May 25, 2005

Client: Of Archdiocese | Applicant: Palace Construction Co Inc | Permit type: Right-of-way | Permit status: Iss
2005/05/2509515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
95
Replace lf sidewalk.
Date:  July 19, 2005

Client: Of Archdiocese | Applicant: Palace Construction Co Inc | Permit type: Right-of-way | Permit status: Iss
2005/07/1909515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
95
Construction fence surrounding property, 6 high chain link. Poles are to be driven or braced with kickers and attached or braced at the bases to resist movement and wind over-turn. Fence to be place entirely on property and at least 18" off any public sidewalk. See cpl 2004-02681.
Date:  March 28, 2005

Client: Of Archdiocese | Applicant: Palace Construction Co Inc | Permit type: Fence | Permit status: N&v | Current use: Religious assem
2005/03/2809515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
95
Remodel of existing church building for university ministry.
Date:  April 13, 2005
Value:   $953,810

Client: Of Archdiocese | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 21, 2005 | Current use: Religious assem
2005/04/139538109515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
100
Renew service and extend gas main
Date:  November 17, 2003
Contractor: Xcel Energy

Client: Mennonite Boulder | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: N&v
2003/11/17010015 Euclid Av Boulder CoXcel Energy
SCORE
99
Replace gas main in 15 block of euclid.
Date:  October 16, 2003

Client: Mennonite Boulder | Applicant: Northern Pipeline Construction | Permit type: Right-of-way | Permit status: Iss
2003/10/1609915 Euclid Av Boulder CoNorthern Pipeline Construction
SCORE
87
Installation of a backflow prevention device -- certification of testing required at initial inspection.
Date:  November 9, 2009

Client: Of Archdiocese | Applicant: Streamline Plumbing Llc | Permit type: Plumbing | Permit status: N&v | Current use: Religious assem
2009/11/0908715 Euclid Av Boulder CoStreamline Plumbing Llc
SCORE
99
Total tear off and reroof of existing non-residential structure. Asphalt shingles, squares, 3 12 through 12 12 pitches as indicated on permit application.
Date:  May 26, 2011

Client: Of Archdiocese | Applicant: Academy Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: July 7, 2011 | Current use: Single family d
2011/05/2609915 Euclid Av Boulder CoAcademy Roofing Inc
SCORE
65
Replacement of boiler and forced-air funace due to water damage. Electrical under separate permit.
Date:  October 7, 2013

Client: Of Archdiocese | Applicant: Major Heating & A/c Inc | Permit type: Mechanical | Permit status: Iss | Current use: Religious assem
2013/10/0706515 Euclid Av Boulder CoMajor Heating And A C Inc
SCORE
97
This is an interior remodel to create a coffee bar for the use of the st. Thomas aquinas student center.
Date:  February 2, 2015
Value:   $14,323

Client: Of Archdiocese | Applicant: Horizon West Builders Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Religious assem
2015/02/02143239715 Euclid Av Boulder CoHorizon West Builders Inc
SCORE
87
Installation of a backflow prevention device -- certification of testing required at initial inspection.
Date:  November 9, 2009
Value:   $450

Client: Of Archdiocese | Permit type: Plumbing | Permit status: N&v | Current use: Religious assembly, existing, existing | Permit id: Pmt2009-04581
2009/11/094508715 Euclid Av Boulder CoStreamline Plumbing Llc
SCORE
65
Replacement of boiler and forced-air funace due to water damage. Electrical under separate permit.
Date:  October 7, 2013
Value:   $20,783

Client: Of Archdiocese | Permit type: Mechanical | Permit status: Iss | Current use: Religious assembly, existing | Permit id: Pmt2013-05285
2013/10/07207836515 Euclid Av Boulder CoMajor Heating And A C Inc
SCORE
97
This is an interior remodel to create a coffee bar for the use of the st. Thomas aquinas student center.
Date:  February 10, 2015
Value:   $4,500

Client: Of Archdiocese | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Religious assembly, remodel | Permit id: Pmt2014-05122
2015/02/1045009715 Euclid Av Boulder CoHorizon West Builders Inc
Installation of secondary electric, pedestal in alley, and reconstrctuion of pole
Date:  July 21, 2005

Client: Of Archdiocese | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2005-02804
2005/07/2109515 Euclid Av Boulder Co
Renew service and extend gas main

Client: Mennonite Boulder | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2003-04947
09515 Euclid Av Boulder Co
SCORE
99
Total tear off and reroof of existing non-residential structure. Asphalt shingles, squares, 3 12 through 12 12 pitches as indicated on permit application.
Date:  May 26, 2011
Value:   $32,985

Client: Of Archdiocese | Permit type: Roofing | Permit status: Cmp | Completion date: July 7, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02123
2011/05/26329859915 Euclid Av Boulder CoAcademy Roofing, Inc
Renew service and extend gas main

Client: Mennonite Boulder | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2003-04947
09515 Euclid Av Boulder Co
SCORE
95
Remodel of existing church building for university ministry.
Date:  April 15, 2005
Value:   $953,810

Client: Of Archdiocese | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: Cmp | Completion date: October 21, 2005 | Current use: Religious assembly, remodel | Permit id: Pmt2005-00522
2005/04/159538109515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
95
Construction fence surrounding property, 6foot high chain link. Poles are to be driven or braced with kickers and attached or braced at the bases to resist movement and wind over-turn. Fence to be place entirely on property and at least 18inch off any public sidewalk. See cpl 2004-02681.
Date:  March 28, 2005
Value:   $400

Client: Of Archdiocese | Permit type: Fence | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2005-01074
2005/03/284009515 Euclid Av Boulder CoPalace Construction Co Inc
SCORE
100
Roofing permit for repair of 14 squares of 3 tab shingles at 4:12 slope.
Date:  March 24, 2006
Value:   $3,400

Client: Of Archdiocese | Permit type: Roofing | Permit status: Cmp | Completion date: November 25, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2006-01001
2006/03/24340010015 Euclid Av Boulder CoA A A Roofing And Insulation
SCORE
99
Rotational pruning contract #8 cob forestry - ken fisher to include 9th, lincoln, and 10th b w baseline and euclid
Date:  February 24, 2011

Client: R Name | Applicant: Ironwood Earthcare, Inc | Permit type: Right-of-way | Permit status: Iss
2011/02/240990 9th St Btw Baseline Rd And Euclid Av Boulder CoIronwood Earthcare Inc
SCORE
93
Total tear-off and reroof with asphalt shingles. 15 squares. Contrractor indicates a roof pitch of 6 12
Date:  June 2, 2015

Client: Suzannah Carleton | Applicant: All Around Roofing & Exteriors | Permit type: Roofing | Permit status: Iss | Current use: Single family d
2015/06/0209310 Euclid Av Boulder CoAll Around Roofing And Exteriors
SCORE
56
Interior remodel of 134 square feet to replace fixtures in 2 bathrooms, relocate laundry to basement, remodel kitchen on main level, and remove basement kitchen. Includes associated mep. Owner contractor.
Date:  June 9, 2015
Value:   $16,700
Contractor: Leslie Simpson

Client: Leslie Simpson | Applicant: Leslie Simpson | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/06/09167005610 Euclid Av Boulder CoLeslie Simpson
SCORE
59
Yard dumpster in street
Date:  June 15, 2015

Client: Suzannah Carleton | Applicant: Bin There Dump That | Permit type: Right-of-way | Permit status: Iss
2015/06/1505910 Euclid Av Boulder CoBin There Dump That
SCORE
93
Total tear-off and reroof with asphalt shingles. 15 squares. Contrractor indicates a roof pitch of 6 12
Date:  June 3, 2015
Value:   $6,400

Client: Suzannah Carleton | Permit type: Roofing | Permit status: Cmp | Completion date: October 21, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-02150
2015/06/0364009310 Euclid Av Boulder CoAll Around Roofing And Exteriors
Interior remodel of 134 square feet to replace fixtures in 2 bathrooms, relocate laundry to basement, remodel kitchen on main level, and remove basement kitchen. Includes associated mep. Owner contractor.
Date:  June 11, 2015
Value:   $7,700

Client: Leslie Simpson | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 20, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-02272
2015/06/1177009510 Euclid Av Boulder Co
SCORE
100
Gas main replacement and 21 gas service replacements. Job #12051581
Date:  August 20, 2015
Contractor: Xcel Energy

Client: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Act
2015/08/200100Grant Pl Btw College Av And Euclid Av Boulder CoXcel Energy
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.