SCORE 83 Upgrade fire alarm system. Replace exisiting common area devices and install module for each bedroom for identification of rooms on main fire alarm panel. All devices to remain in same location Permit type: Fire alarm | Current use: Comm | Permit id: Efa69612 | |||||
Repair conduit; (2) 2 x 3 rdwy (1) 2 x 3 sdwk; guar 2010; # 1403129100498; ds 2014-250-9621 Date: June 24, 2014 Permit type: Maintenance | Permit id: Exca-37609 | |||||
To conduct the following: provide temporary power with temporary generator ;429 gallons diesel fuel Date: May 12, 2015 Permit type: Bfd general permit | Permit id: Gp470510 | |||||
Repair conduit; (2) 2 x 3 rdwy / (1) 2 x 3 sdwk; guar 2010; # 1403129100498; ds 2014-250-9621 Date: June 24, 2014 Permit type: Excavation permit | Expiration date: July 6, 2014 | Permit id: Exca-376096 | |||||
SCORE 83 Upgrade fire alarm system. Replace exisiting common area devices and install module for each bedroom for identification of rooms on main fire alarm panel. All devices to remain in same location Permit type: Electrical fire alarms | Expiration date: October 6, 2011 | Current use: Comm | Permit id: Efa69612 | |||||
Replace / up-grade existing fire alarm system - devices to remain in same location - installation of strobes in bathrooms - doc 20110399 Date: October 26, 2011 Permit type: Bfd fire alarm installations | Permit id: Bfdf71124 | |||||
Repair conduit; (2) 2 x 3 rdwy (1) 2 x 3 sdwk; guar 2010; # 1403129100498; ds 2014-250-9621 Date: June 24, 2014 Permit type: Excavation permit | Expiration date: July 6, 2014 | Permit id: Exca-376096 | |||||
Replace up-grade existing fire alarm system - devices to remain in same location - installation of strobes in bathrooms - doc 20110399 Date: October 26, 2011 Permit type: Bfd fire alarm installations | Permit id: Bfdf71124 | |||||
SCORE 82 Temporary placement of dumpster Date: April 6, 2017 Contractor: Aaron Champagne Permit type: Bfd temporary dumpster | Permit id: Td695423 | |||||
SCORE 82 Temporary bagging of smoke detectors Date: April 6, 2017 Contractor: Aaron Champagne Permit type: Bfd bag smoke detectors | Permit id: Bsd693661 | |||||
SCORE 82 Impairments shall be coordinated with the buildings nfpa 241 impairment coordinator. Date: April 14, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk690666 | |||||
SCORE 82 Renovations to the spaulding rehab facility in brighton ma Permit type: Electrical permit | Expiration date: October 27, 2017 | Current use: Other | Permit id: E702488 | |||||
SCORE 82 Demo only -remove existing fire alarm devices for demolition and construction the building will remain unoccupied during demo and construction the majority of the existing fire alarm devices will be removed. Construction level fire alarm protection will remain. Date: April 6, 2017 Contractor: Dan Mileika Permit type: Bfd fire alarm installations | Permit id: Bfdf690886 | |||||
SCORE 86 Welding steel chilled water piping and soldering copper chilled water piping bfd paid detail required Date: May 2, 2017 Contractor: Charlie Vaughan Permit type: Bfd cutting-burning-welding | Permit id: Cbw702815 | |||||
SCORE 82 Modifications to an existing intelligent fire detection and evacuation system at the spaulding rehab facility. Permit type: Electrical fire alarms | Expiration date: November 5, 2017 | Current use: Other | Permit id: Efa704775 | |||||
SCORE 89 Renovation of nursing home Permit type: Plumbing permit | Expiration date: November 10, 2017 | Current use: Comm | Permit id: Pl707028 | |||||
SCORE 67 Install structural steel supports for new hvac units on roof (dpl) bfd paid detail required Date: May 11, 2017 Contractor: Steve Pisani Permit type: Bfd cutting-burning-welding | Permit id: Cbw705154 | |||||
SCORE 89 The work will be done by cutting light gauge for framing installation fastening metal to concrete floor and ceiling and drywalling in an "unoccupied" building using hand shears and chop saw out of a fireproof cutting station with access to local fire extinguishers. Date: May 23, 2017 Contractor: Tony Lopez Permit type: Bfd cutting-burning-welding | Permit id: Cbw710532 | |||||
SCORE 89 Roof top gas pipe unit Permit type: Gas permit | Expiration date: November 23, 2017 | Current use: Comm | Permit id: G707036 | |||||
SCORE 82 Coordinate sprinkler impairment;with the buildings nfpa 241 impairment coordinator.....;so that only one sprinkler zone;will be;impaired at any time. Buildings sprinkler system shall be fully functioning at the end of each work shift. Date: May 30, 2017 Contractor: Justin Fishlin Permit type: Bfd sprinkler system | Permit id: Sprk706689 | |||||
SCORE 86 Installing 204 cat6a data network cables. Permit type: Electrical low voltage | Expiration date: December 13, 2017 | Current use: Comm | Permit id: Elv718506 | |||||
SCORE 89 Welding &;cutting of new gas piping to length (dpl) bfd paid detail required Date: May 31, 2017 Contractor: Joseph R Valante Jr Permit type: Bfd cutting-burning-welding | Permit id: Cbw712842 | |||||
SCORE 96 Installation of low voltage automation system at spaulding rehab Permit type: Electrical low voltage | Expiration date: December 5, 2017 | Current use: Comm | Permit id: Elv714889 | |||||
Bfd chemist certificate proces Date: June 1, 2017 Permit id: Chm709833 | |||||
Bfd chemist certificate proces Date: June 1, 2017 Permit id: Chm709839 | |||||
Bfd chemist certificate proces Date: June 30, 2017 Permit id: Chm722531 | |||||
SCORE 82 Modifications to an existing intelligent fire detection and evacuation system at the spaulding rehab facility. The building is currently unoccupied. Fire alarm work per nfpa stands and tci approved date 6 28 17;plans fa2. 1 fa2. 2 fa2. 3 ; fa7. Date: July 3, 2017 Contractor: Dennis Daru Permit type: Bfd fire alarm installations | Permit id: Bfdf704774 | |||||
SCORE 82 Spaulding rehab brighton -; interior and exterior renovations of all 3 floors of existing nursing home building.; interior work includes selective demo and architectural finishes structural mep and fp alterations in existing patient rooms corridors common areas nurses stations and administrative areas.; exterior work includes demolition and replacement of all windows and portions of roofing.; installation of new cooling tower and;rtus.; lpr ; Permit type: Long form/alteration permit | Expiration date: September 30, 2017 | Current use: Mixed | Permit id: Alt686581 | |||||
SCORE 82 Interior exterior renovations of existing building at 1 n. Beacon st. Interior work: select demo and architectural in corridors and administrative areas. Exterior work: demo replacement of windows and portions of roofing. Date: March 10, 2017 Contractor: Aaron Champagne Permit type: Bfd construction demo reno | Permit id: Fdc686855 | |||||
SCORE 82 Select demolition in preparation for full scope of alt686581. All cost and fees are on long form alt686581. No structural demolition Date: March 10, 2017 Contractor: Aaron Champagne Permit type: Short form bldg permit | Expiration date: September 10, 2017 | Current use: Mixed | Permit id: Sf688098 |