Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: June 6, 2016 Client: Green Lane Realty Associa | Permit status: Expired | Permit id: 684825 | |||||
Plumbing permit Date: May 3, 2016 Client: Green Lane Realty Associa | Permit status: Completed | Permit id: 689180 | |||||
Zoning/use permit Date: October 2, 2015 Client: Green Lane Realty Associa | Permit status: Completed | Permit id: 613846 | |||||
Permit for the partial demolition of an existing structure, for the erection of a semidetached structure (maximum height nte 39. 2917 ft) on an existing foundation for use as twenty nine dwelling units on first thru third floors, with accessory interior parking for twenty four (24) spaces including one (1) ada space and eveven (11) bicycle spaces on an accessiable route in basement..(size and location as shown on the application) Date: July 1, 2015 Client: Green Lane Realty Associa | Applicant: William Obrien | Permit type: Appeal | Permit status: Granted | Completion date: September 21, 2015 | Permit id: 25533 | |||||
Permit for the complete demolition of an existing structure; ( interior partitions at the basement and existing footings, foundation walls to remain); for the erection of a semi-detached structure( 402 " high); recessed balcony at first floor through third floor ( at rear and side of the property) ; for the erection of awning at first floor front; for a multi-family household living ( 31 dwelling units) at the first ( 1st) floor through third ( 3rd ) floors with twenty-four(24) off-street accessory parking spaces including with one(1) accessible space on basement and eleven(11) bicycle spaces ( should be in an accessible route) on basement size and location as shown in the application. Date: April 30, 2015 Client: Green Lane Realty Associa | Applicant: William Obrien | Permit type: Appeal | Permit status: Granted | Permit id: 25062 | |||||
New construction permit Date: November 10, 2016 Client: Green Lane Realty Associa | Permit status: Active | Permit id: 708467 | |||||
Plumbing permit Date: May 3, 2016 Client: Green Lane Realty Associa | Permit status: Completed | Permit id: 689180 | |||||
Zoning use permit Date: October 2, 2015 Client: Green Lane Realty Associa | Permit status: Completed | Permit id: 613846 | |||||
Demolition permit Date: June 6, 2016 Client: Green Lane Realty Associa | Permit status: Completed | Permit id: 684825 | |||||
Permit for the partial demolition of an existing structure, for the erection of a semidetached structure (maximum height nte 39. 2917 ft) on an existing foundation for use as twenty nine dwelling units on first thru third floors, with accessory interior parking for twenty four (24) spaces including one (1) ada space and eveven (11) bicycle spaces on an accessiable route in basement..(size and location as shown on the application) Date: July 1, 2015 Client: Green Lane Realty Associa | Applicant: William Obrien | Permit type: Appeal | Permit status: Granted | Completion date: September 21, 2015 | Permit id: 25533 | |||||
Permit for the complete demolition of an existing structure; ( interior partitions at the basement and existing footings, foundation walls to remain); for the erection of a semi-detached structure( 402 " high); recessed balcony at first floor through third floor ( at rear and side of the property) ; for the erection of awning at first floor front; for a multi-family household living ( 31 dwelling units) at the first ( 1st) floor through third ( 3rd ) floors with twenty-four(24) off-street accessory parking spaces including with one(1) accessible space on basement and eleven(11) bicycle spaces ( should be in an accessible route) on basement size and location as shown in the application. Date: April 30, 2015 Client: Green Lane Realty Associa | Applicant: William Obrien | Permit type: Appeal | Permit status: Granted | Permit id: 25062 | |||||
SCORE 100 New construction: interior plumbing of a 3-story structure with (29) dwelling units. The installation shall comply with the philadelphia plumbing code, 2004. Additional permits are required for the 2" domestic water distribution service; the 8" storm sewer lateral and the 8" sanitary sewer lateral, to the street mains, as well as the 2" backflow prevention containment assembly, on the main domestic water supply. Date: August 28, 2017 Contractor: Roger Ross Plumbing And Htg Inc Client: Green Lane Realty Associa | Permit type: Plumbing permit | Permit status: Active | Completion date: September 19, 2017 | Permit id: 772016 | |||||
Demo existing roof, first floor walls, landscape retaining walls, retain existing basement, foundation, and first floor deck system. Erect three story addition on existing foundation to include 29 parking spaces in the basement with storage for an additional 11 bicycles, 6 high perimeter fence on the westerly and northerly property lines. Date: October 2, 2015 Client: Green Lane Realty Associa | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 2, 2015 | Permit id: 613846 | |||||
SCORE 93 Partial demolition (all aboveground structure to be removed to first floor; first floor and basement levels to remain) of an existing detached two story, religious assembly masonry, steel, concrete and wood building using hand tools with lift and mechanical loader to remove debris only. Special inspections required for shoring of first floor for mechanical debris removal. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. Complete sidewalk closure and partial cartway closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. 21 day posting period waived due to zba case no. 25533 Date: June 6, 2016 Contractor: Hc Site Construction Inc Client: Green Lane Realty Associa | Permit type: Demolition permit | Permit status: Completed | Completion date: May 11, 2017 | Permit id: 684825 | |||||
SCORE 100 Delete curb traps and seal lateral (mixed use)pa20161241805 self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: May 3, 2016 Contractor: Roger Ross Plumbing And Htg Inc Client: Green Lane Realty Associa | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 15, 2017 | Permit id: 689180 | |||||
For the erection of three (3) story structure for use as twenty nine dwelling units on first through third floors, with accessory interior parking for twenty four (24) spaces including one (1) ada space and eleven (11) bicycle spaces on an accessible route in basement. Foundation shall be in accordance with approved plans and geotechnical report. Entire building to be fully sprinkelred. Separate permit required for any mep and fire suppression work. Amended building permit required for special inspections: duties and responsibilities agreement form, statement of special inspection, and qualifications. Date: November 10, 2016 Client: Green Lane Realty Associa | Permit type: New construction permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 708467 | |||||
SCORE 79 Install (29) hvac systems with ductwork. (r2 s-2) Date: December 6, 2017 Contractor: Jesse Fritz Airtight Heating Client: Green Lane Realty Associa | Permit type: Mechanical permit | Permit status: Active | Completion date: December 6, 2017 | Permit id: 837432 | |||||
SCORE 79 Install (1) ductless mini split & (1) applicanace (r2 s-2) Date: December 6, 2017 Contractor: Jesse Fritz Airtight Heating Client: Green Lane Realty Associa | Permit type: Mechanical permit | Permit status: Active | Completion date: December 6, 2017 | Permit id: 837431 |