Co only for unit #703 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 21, 2012 | Permit id: 243907 | |||||
Certificate of occupancy for unit 2701. Date: November 16, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 21, 2012 | Permit id: 438332 | |||||
SCORE 100 For a partial change in occupancy classification with alterations within an existing high-rise mixed-use residential building to include erection of interior partition for office, kitchen, & bike storage spaces, application of impact resistant finishes to existing corridor walls, infill of existing exit access doorway openings, & installation of proprietary bike mounting rack equipment @ basement & 2nd floor storage spaces; building is fully sprinklered. No change in height or area of existing exterior openings permitted herein & all work in accordance with plans approved by the city of philadelphia historical commission dated 11. 01. 12. Date: November 21, 2012 Contractor: Intech Construction Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 29, 2013 | Permit id: 435894 | |||||
SCORE 95 Relocate 19 sprinklers Date: March 19, 2013 Contractor: Preferred Fire Protection Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: August 13, 2013 | Permit id: 455162 | |||||
Certificate of occupancy for unit 2702. Date: November 16, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 21, 2012 | Permit id: 438334 | |||||
Co only for unit #1001. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 7, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 13, 2009 | Permit id: 241374 | |||||
Co only for building core. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 7, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 13, 2009 | Permit id: 241376 | |||||
Co only for unit #1104 . Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 249268 | |||||
Co only for unit # 2502. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 2, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2010 | Permit id: 249304 | |||||
Co only for unit # 2504. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 2, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2010 | Permit id: 249306 | |||||
Co only for unit #2601. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 19, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 22, 2010 | Permit id: 249307 | |||||
Co only unit #2602 Date: September 22, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 21, 2010 | Permit id: 249308 | |||||
Co only for unit #2603. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 19, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 22, 2010 | Permit id: 249309 | |||||
Co only for unit #2701. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 19, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 14, 2013 | Permit id: 249311 | |||||
Co only for unit #2703. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: February 19, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 22, 2010 | Permit id: 249313 | |||||
Co only for unit # 2704 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 30, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2010 | Permit id: 249314 | |||||
Unit # 3102. Alteration ap #258592 included brt incorrect address as unit #3101 Date: July 14, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 14, 2010 | Permit id: 249319 | |||||
SCORE 100 Install plumbing fixtures with water distribution pipe, and sanitary lines to fixtures Date: May 3, 2010 Contractor: A T Chadwick Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 12, 2010 | Permit id: 276660 | |||||
SCORE 99 Interior demolition of non bearing partitions and ceilings Date: May 10, 2010 Contractor: The Bannett Group Ltd Client: Philadelphia Rittenhouse Developer Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: September 14, 2010 | Permit id: 278004 | |||||
Co only for unit # 805. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2009 | Permit id: 249259 | |||||
Co only for unit # 2003 Date: September 28, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 249285 | |||||
Co only for unit # 2401. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: January 22, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 27, 2010 | Permit id: 249299 | |||||
Co only for unit #1501. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243916 | |||||
Co only for unit #1502. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243917 | |||||
Co only for unit # 1503. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243918 | |||||
Co only for unit # 1601 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 243919 | |||||
Co only for unit #1602. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 15, 2010 | Permit id: 243920 | |||||
Co only for unit #1604 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 243921 | |||||
Co only for unit #1701 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 18, 2009 | Permit id: 243922 | |||||
Co only for unit # 1702 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 18, 2009 | Permit id: 243923 | |||||
Co only for unit #1704. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 28, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 15, 2010 | Permit id: 243924 | |||||
Co only for unit 1801. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 19, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 243925 | |||||
Co only for unit # 1802 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 19, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 20, 2010 | Permit id: 243926 | |||||
Co only for unit #1803 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 19, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 243927 | |||||
Co only for unit # 401. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 14, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 14, 2010 | Permit id: 249230 | |||||
Co only for unit # 402. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 5, 2010 | Permit id: 249231 | |||||
Co only for unit #403. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 249232 | |||||
Co only for unit # 1202. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 1, 2009 | Permit id: 249269 | |||||
Co only for unit #1204 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249270 | |||||
Co only for unit #1205. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 1, 2010 | Permit id: 249271 | |||||
Co only for unit #1304. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 1, 2010 | Permit id: 249272 | |||||
Co only for unit #1403. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2010 | Permit id: 249274 | |||||
Co only for unit #1405. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 249275 | |||||
Co only for unit #1504. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 13, 2010 | Permit id: 249276 | |||||
Co only for unit #1603. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 249277 | |||||
Co only for unit # 1901. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 30, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 20, 2010 | Permit id: 249279 | |||||
Co only for unit # 1902. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 30, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2010 | Permit id: 249280 | |||||
Co only for unit #1903 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 30, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2010 | Permit id: 249281 | |||||
Co only for unit # 1904. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: June 30, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2010 | Permit id: 249282 | |||||
Co only for unit #1804 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 19, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 243928 | |||||
Co only for unit # 2001 Date: September 28, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 249283 | |||||
Co only unit # 2002 Date: September 28, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 249284 | |||||
Co only for unit # 905. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2010 | Permit id: 249264 | |||||
Co only for unit #1002. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249265 | |||||
Co only for unit # 404 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 249233 | |||||
Co only for unit #1302. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 21, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 242528 | |||||
Co only for unit #1303. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 21, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 242529 | |||||
Co only for unit #605. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 21, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 23, 2010 | Permit id: 243901 | |||||
Co only for unit #602 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 243902 | |||||
Co only for unit #606 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 243903 | |||||
Co only for unit # 608 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 9, 2010 | Permit id: 243904 | |||||
Co only for unit #609 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 243905 | |||||
Co only for unit #904 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 26, 2010 | Permit id: 243908 | |||||
Co only for unit #906. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243909 | |||||
Co only for unit #1206 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 13, 2010 | Permit id: 243910 | |||||
Co only for unit # 1306. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243911 | |||||
Co only for unit # 507 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 249244 | |||||
Co only for unit #607. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 15, 2010 | Permit id: 249251 | |||||
Co only for unit #610. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2010 | Permit id: 249252 | |||||
Co only for unit #701. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 20, 2010 | Permit id: 249253 | |||||
Co only for unit # 705 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 20, 2010 | Permit id: 249254 | |||||
Co only for unit # 801. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 249256 | |||||
Co only for unit # 802. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 249257 | |||||
Co only for unit # 803. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 249258 | |||||
Co only for unit # 706 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 249255 | |||||
Co only for unit #1401. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 15, 2010 | Permit id: 243912 | |||||
Co only for unit #1402 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 243913 | |||||
Co only for unit #1404. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 243914 | |||||
Co only for unit #1406. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 16, 2009 | Permit id: 243915 | |||||
Co only for unit # 806. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 249260 | |||||
Co only for unit #901. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: November 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 30, 2009 | Permit id: 249261 | |||||
Co only for unit # 902. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 20, 2010 | Permit id: 249262 | |||||
Co only for unit # 903. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2010 | Permit id: 249263 | |||||
Co only for unit #1004. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 249266 | |||||
Co only for unit #1103. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 1, 2010 | Permit id: 249267 | |||||
Co for unit #2503. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 401652 | |||||
Co only for unit #405. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 15, 2010 | Permit id: 249234 | |||||
Co only for unit #406. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 249235 | |||||
Co only for unit #407. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 5, 2010 | Permit id: 249236 | |||||
Co only for unit #408. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2010 | Permit id: 249237 | |||||
Co only for unit #501. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249238 | |||||
Co only for unit #502. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249239 | |||||
Co only for unit #503. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 249240 | |||||
Co only for unit # 504. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249241 | |||||
Co only for unit #505. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249242 | |||||
Co only for unit #506. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 17, 2010 | Permit id: 249243 | |||||
SCORE 95 Level ii interior alterations to create a new unenclosed stair in an existing high rise as well as floor penetrations through 2-hour fire rated floor assemblies for relocated appliances hvac system. Separate permits for electrical, hvac and plumbing systems. All asbestos to be treated removed prior to commencement of work. Date: July 3, 2013 Contractor: Turner Construction Company Client: Philadelphia Rittenhouse Developer Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 12, 2015 | Permit id: 478065 | |||||
Co only for unit #1003. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 7, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 13, 2009 | Permit id: 241339 | |||||
Co only for unit #1005. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 7, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 13, 2009 | Permit id: 241373 | |||||
Co only for unit #1105. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 7, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 13, 2009 | Permit id: 241375 | |||||
Co only for unit #508. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 18, 2010 | Permit id: 249245 | |||||
Co only for unit # 509. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249246 | |||||
Co only for unit # 604. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2010 | Permit id: 249250 | |||||
SCORE 100 Interior alterations for (2) water closets, (2) lavatories, (3)sinks Date: April 17, 2013 Contractor: John Uebele Jr Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 7, 2015 | Permit id: 464904 | |||||
Co only for unit # 2103 Date: December 14, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249289 | |||||
Co only for unit #704. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 242521 | |||||
Co only for unit # 804 original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 242522 | |||||
Co only for unit # 1102. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 242524 | |||||
Co only for unit #1201. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 20, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 242525 | |||||
Co only for unit #1203. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 21, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 242526 | |||||
Co only for unit #1301. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 21, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 242527 | |||||
Co only for unit #1101. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 14, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 16, 2009 | Permit id: 242523 | |||||
SCORE 100 Alterations to create a resident amenity area for use by residents only Date: December 19, 2012 Contractor: Intech Construction Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: New construction permit | Permit status: Completed | Completion date: July 1, 2013 | Permit id: 440705 | |||||
Co only for unit #2404. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: January 22, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 27, 2010 | Permit id: 249302 | |||||
SCORE 95 Relocate 95 sprinklers to accomodate new wall and ceiling layouts Date: July 3, 2013 Contractor: Preferred Fire Protection Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: July 29, 2014 | Permit id: 481241 | |||||
SCORE 100 Certificate of occupancy for unit 702, original construction approved under permit tracking permit #183082 Date: June 27, 2013 Contractor: Dch Contractors Llc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 1, 2013 | Permit id: 480272 | |||||
SCORE 100 Certificate of occupancy for unit 703, original construction approved under permit tracking permit #183082 Date: June 27, 2013 Contractor: Dch Contractors Llc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 2, 2013 | Permit id: 480179 | |||||
SCORE 100 Interior alteration as per plan. Date: March 17, 2014 Contractor: Orion General Contractors Client: Philadelphia Rittenhouse Developer Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 31, 2014 | Permit id: 523041 | |||||
SCORE 100 Certificate of occupancy for unit 2803 opa#888095904 Date: July 8, 2014 Contractor: Intech Construction Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 11, 2014 | Permit id: 547722 | |||||
SCORE 95 Relocate 115 sprinklers to accomodate new wall and ceiling layouts Date: July 3, 2013 Contractor: Preferred Fire Protection Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 8, 2014 | Permit id: 481242 | |||||
SCORE 95 Relocate 117 sprinkler to accommodate new wall and ceiling layouts Date: July 3, 2013 Contractor: Preferred Fire Protection Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 8, 2014 | Permit id: 481243 | |||||
SCORE 100 Electrical including lights fixtures, receptacles and fire alarm work for 8 condo units per 2008 nec & nfpa 72(condos) Date: August 20, 2013 Contractor: Gordon Group Electric Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 484762 | |||||
SCORE 100 Relocate (10) existing sprinkler heads in 31st flr (staircase) Date: January 31, 2014 Contractor: Majek Fire Protection, Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 14, 2015 | Permit id: 517779 | |||||
SCORE 100 Relocation of vent stacks and installation of temp bathroom faculties relocate cold and hot water lines for new stairway (condo bldg) Date: February 11, 2014 Contractor: Chadwick Service Company Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 519237 | |||||
SCORE 99 Relocate 31 air devices Date: June 26, 2014 Contractor: Hunter Mechanical Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 8, 2015 | Permit id: 545810 | |||||
SCORE 100 Certificate of occupancy for unit 2804 opa#888095906 Date: July 8, 2014 Contractor: Intech Construction Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 11, 2014 | Permit id: 547738 | |||||
Relocation of bldg management offices to 3rd floor, existing management office will be converted to a locker room with the addition of a toilet room and converting bike room on 1st floor to a package room for the residence. Separate permits required for electrical, plumbing and fire suppression work. No exterior work under this permit. Date: November 19, 2014 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: April 28, 2015 | Permit id: 560724 | |||||
SCORE 100 Install water and waste piping for new toilet,basin and new sink (hi rise bldg)the installation will comply with the philadelphia plumbing code 2004 Date: January 7, 2015 Contractor: Adelphia Plumbing And Htng Corp Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 577358 | |||||
SCORE 100 Relocate 15-light fixtures, 6-sw, wall mounted recept, cable jack, install 6-recejpts, 2-usb recepts comb device, 3-comb phone data jacks, replace 3-lights & relocate 1-sw & recepts as per nec 2008 cc district Date: December 9, 2014 Contractor: A T B Electric Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 24, 2015 | Permit id: 578538 | |||||
Mechanical alterations on partial first floor, scond and third floors as per approved plans. See app# 560724 for approved plans. Date: November 19, 2014 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 11, 2015 | Permit id: 566471 | |||||
Co for unit #2303. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 401649 | |||||
Co for unit #2304. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 401650 | |||||
Co for unit #2501. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 401651 | |||||
Certificate of occupancy for unit #2604. Original construction approved under permit tracking permit #183082. Date: August 21, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 17, 2012 | Permit id: 423343 | |||||
SCORE 100 Install lighting fixtures, power receptacles, lighting control devices and fire alarm devices install 2-125 amp panels and related branch circuits for lighting and power per 2008 nec (commercial) Date: April 11, 2013 Contractor: Gordon Group Electric Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2016 | Permit id: 458315 | |||||
SCORE 95 Alterations to fire sprinkler system to serve amenity area. Date: July 3, 2013 Contractor: Preferred Fire Protection Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: July 15, 2013 | Permit id: 459162 | |||||
SCORE 100 Reuse existing circuits to refeed lights in hallway no fire alarm work per 2008 nec (commercial) Date: May 9, 2013 Contractor: Gordon Group Electric Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 465293 | |||||
SCORE 100 Install new sanitary branch piping and domestic water, new fixtures back to existing sanitary stacks and water risers 108 fixtures Date: July 10, 2013 Contractor: Bbj Mechanical Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 8, 2014 | Permit id: 474933 | |||||
SCORE 100 Electrical fit-out: power, receptacles, panel no fire alarm work under this permit Date: April 28, 2011 Contractor: Gordon Group Electric Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 310198 | |||||
SCORE 100 Hook up (2) ansul r-102 fire systems in kitchen. Date: January 7, 2011 Contractor: Atlantic Fire Equipment Co Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 315661 | |||||
Co for unit #2104. Original construction approved under permit tracking permit #183082, plan #41-a-05 for 1801-13 walnut st. Date: March 27, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 395375 | |||||
Co for unit #2301. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 30, 2012 | Permit id: 401646 | |||||
Co for unit #2204. Original construction approved under permit tracking permit #183082, plan #41-a-05 for 1801-13 walnut st. Date: March 27, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 395382 | |||||
Co for unit #2203. Original construction approved under permit tracking permit #183082, plan #41-a-05 for 1801-13 walnut st. Date: March 27, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 395381 | |||||
Co for unit #2202. Original construction approved under permit tracking permit #183082, plan #41-a-05 for 1801-13 walnut st. Date: March 27, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 395380 | |||||
Co for unit #2201. Original construction approved under permit tracking permit #183082, plan #41-a-05 for 1801-13 walnut st. Date: March 27, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2012 | Permit id: 395379 | |||||
Electrical permit Date: April 11, 2013 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 458315 | |||||
Electrical permit Date: November 10, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 303362 | |||||
Administrative permit Date: October 26, 2009 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 243917 | |||||
Electrical permit Date: October 14, 2011 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Expired | Permit id: 366878 | |||||
Plumbing permit Date: January 7, 2015 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 577358 | |||||
Administrative permit Date: September 28, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 249285 | |||||
Administrative permit Date: January 24, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 515656 | |||||
Administrative permit Date: April 26, 2012 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 401652 | |||||
Electrical permit Date: December 9, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 578538 | |||||
Mechanical permit Date: June 26, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 545810 | |||||
Plumbing permit Date: July 10, 2013 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 474933 | |||||
Suppression permit Date: January 7, 2011 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 315661 | |||||
New construction permit Date: December 19, 2012 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 440705 | |||||
Administrative permit Date: June 27, 2013 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 480179 | |||||
Suppression permit Date: August 24, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 297925 | |||||
Demolition permit Date: May 10, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 278004 | |||||
Suppression permit Date: July 3, 2013 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 481242 | |||||
Plumbing permit Date: February 11, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 519237 | |||||
Use permit Date: March 23, 2016 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 673495 | |||||
Use permit Date: January 8, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 513508 | |||||
Alteration permit Date: November 21, 2012 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 435894 | |||||
Mechanical permit Date: January 18, 2011 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 317926 | |||||
Alteration permit Date: November 19, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 560724 | |||||
Plumbing permit Date: May 3, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 276660 | |||||
Alteration permit Date: July 28, 2010 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 291636 | |||||
Alteration permit Date: July 3, 2013 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 478065 | |||||
Suppression permit Date: January 31, 2014 Client: Ashley Biello Rittenhouse Sq Condo Assoc | Permit status: Completed | Permit id: 517779 | |||||
SCORE 100 Fit out condoominium including fire alarm and telecommunications per 2008 nec & nfpa 72(condo bldg) Date: February 27, 2014 Contractor: Gordon Group Electric Client: Rittenhouse Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 516380 | |||||
C o for unit 3103, under amended building plans ap# 509389. Date: April 24, 2014 Client: Rittenhouse Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 25, 2014 | Permit id: 532435 | |||||
SCORE 95 Relocate 26 fire sprinklers to accomodatee new wall ceiling layouts Date: January 7, 2014 Contractor: Preferred Fire Protection Inc Client: Rittenhouse Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: April 22, 2014 | Permit id: 514272 | |||||
SCORE 95 Relocate (4) sprinkler heads (condo) Date: February 11, 2016 Contractor: S A Comunale Co Inc Client: Probinsky Richard Probinsky Beth | Permit type: Suppression permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 669276 | |||||
SCORE 89 Interior demolition & alterations, removal and relocating interior tenant demising wall between units 1902 & 1903, interior upgrades to finishes, partitions, renovations, foor layout of portion of units. Included mechanical alterations for the relocation of 7 diffusers ductwork for new floor configuration with alterations. No change in total number of residential units. Addl permits req: electircal, plumbing, sprinklers. Date: November 25, 2015 Contractor: Aj Lewis Contracting Corp Client: Probinsky Richard Probinsky Beth | Permit type: Alteration permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 651119 | |||||
SCORE 100 Change lighting fixtures, receptacles and switches. New lighting fixtures and switches as needed..... In accordance with 2005 nec Date: January 19, 2010 Contractor: Anton Electric Inc Client: Canter Mary | Permit type: Electrical permit | Permit status: Expired | Completion date: January 19, 2010 | Permit id: 256095 | |||||
SCORE 94 Install 29 - 4" recessed lights through out the apartment as per 2008 nec (cc district) Date: April 16, 2014 Contractor: Starlight Electric Inc Client: Rounick Natalie | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2014 | Permit id: 531009 | |||||
SCORE 100 Install two receptacles on new driving wall that will reduce the size of dwelling unit 2101 and also split up lighting circuit to control six recessed fixtures on the dwelling unit 2101 side as per nec 2008 cc district Date: September 14, 2017 Contractor: Anthony Franzini Client: N Lawrence Dion Deborah | Permit type: Electrical permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 816151 | |||||
SCORE 99 Terminate 1 sc fiber terminations, terminate 1 cat 6 punch downs install and terninate cat 6 wall jacks as per 2008 nec, high rise Date: October 14, 2011 Contractor: Mnm Group Inc The Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: October 14, 2011 | Permit id: 366878 | |||||
SCORE 96 Installation of 3 type 1 kitchen hoods, connect to existing system ducts in conjunction with ap294838 Date: January 18, 2011 Contractor: J Rihl Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 317926 | |||||
Co for unit #2302. Original construction approved under permit tracking permit #183082. Date: April 26, 2012 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 401648 | |||||
SCORE 100 Install (118) automatic sprinkler system within unit 3201 on the 32nd floor and on the entire 33rd floor as per plans. Date: November 23, 2010 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 308067 | |||||
SCORE 92 Add 18 new hoan strobes, 2 strobes, and 2 smoke detectors and connect to existing addressable loops per 2008 nec Date: November 10, 2010 Contractor: Goldsmith Gary A Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 29, 2011 | Permit id: 303362 | |||||
SCORE 100 Relocate sprinkler heads Date: August 24, 2010 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 297925 | |||||
SCORE 92 4 amp 277 4 volt service from existing mdp, new lighting, receptacles,hvac equipment connections and wiring to kitchen equipment from new tenant panels as per 2008 nec (cc dist) Date: September 17, 2010 Contractor: Goldsmith Gary A Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 295924 | |||||
SCORE 99 Interior exterior alterations, fit out, upgrades to finishes, as per plans, signage included. Date: July 28, 2010 Contractor: The Bannett Group Ltd Client: Philadelphia Rittenhouse Developer Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 291636 | |||||
SCORE 100 Installation of sanitaqry wast and vent piping, installation of water supply piping, installation of fixtures: 8 water closets, 11 lavs, 7 bath tubs, 5 showers, 5 kitchen sinks, 2 dishwashers, 2 washer boxes Date: June 14, 2010 Contractor: Herman Goldner Co Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 29, 2013 | Permit id: 284817 | |||||
SCORE 91 Installation of customer supplied 15kv switchgear and associated cabling. As per 2008 nec. Date: October 30, 2017 Contractor: Carr And Duff Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Electrical permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 815617 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Furnish and install 47 diffusers, re-locate one (1) fan coil unit. Date: August 21, 2017 Contractor: Scott Mechanical Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 16, 2017 | Permit id: 809847 | |||||
SCORE 100 Relocate (29) existing sprinkler heads in order to accommodate tenant layouts as per nfpa no. 13 and all local codes. No work alterations to windows or doors. No changes to exterior. Date: July 18, 2017 Contractor: A And S Sprinkler Co Inc Client: Philadelphia Rittenhouse Developer Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 16, 2017 | Permit id: 800836 | |||||
For use as multi-family household living [one-hundred forty-seven (147) dwelling units] in an existing building with one-hundred fifty-six (156) existing accessory off-street enclosed parking spaces and other previously approved commercial uses and signs. No signs on this permit. Date: March 23, 2016 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Use permit | Permit status: Completed | Completion date: March 23, 2016 | Permit id: 673495 | |||||
Co only for unit # 2004 Date: September 28, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 249286 | |||||
Co only for unit #2403. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: January 22, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 27, 2010 | Permit id: 249301 | |||||
Co only for unit #2402. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: January 22, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 29, 2010 | Permit id: 249300 | |||||
Co only for unit #1305. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 1, 2010 | Permit id: 249273 | |||||
Co only for unit # 702. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: October 26, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 21, 2012 | Permit id: 243906 | |||||
Co only for unit #1703. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 15, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249278 | |||||
Co only for unit #603. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2010 | Permit id: 249249 | |||||
Co only for unit #601. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249248 | |||||
Co only for unit #510. Original construction approved under permit tracking permit #183082, plan #41-a-05, for 1801-13 walnut st. Date: December 2, 2009 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 249247 | |||||
SCORE 100 For the installation of a new hvac system throughout residential units on 28th floor. Work includes all registers diffusers, appliances and other supplemental exhaust fans and ductwork as per approved plans. Separate permit required for kitchen hoods, electrical, plumbing, fire suppression. Date: March 14, 2014 Contractor: Edward B Oreilly And Assoc Inc Client: Buonconvento Investments | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 3, 2014 | Permit id: 517842 | |||||
SCORE 100 Sanitary and water from existing services to handle 3 condo units 3 kitchen sins,1 service sink,11 water closets,14 lavs,6 showers,4 bath tubs and 3 stand pipes (condo bldg) Date: March 19, 2014 Contractor: Bbj Mechanical Inc Client: Buonconvento Investments | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 5, 2015 | Permit id: 518982 | |||||
SCORE 100 Tenant fitout for condo unit sw, nw and e, lighting and recepts as per 2008 nec (cc district) install fire alarm as per nfpa72 Date: April 7, 2014 Contractor: Gordon Group Electric Client: Buonconvento Investments | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 522703 | |||||
SCORE 100 Installation of two new pantry sinks, two floor drains Date: February 20, 2015 Contractor: Lees Plumbing Inc Client: Pichini Roberta D | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 18, 2015 | Permit id: 590865 | |||||
SCORE 100 Certificate of occupancy for unit 2801 opa#888095900 Date: July 8, 2014 Contractor: Intech Construction Inc Client: Buonconvento Investments | Permit type: Administrative permit | Permit status: Completed | Completion date: July 11, 2014 | Permit id: 547210 | |||||
SCORE 100 Repair existing ceiling with tray ceiling remove and replace existing bathroom no new partitions. No other work allowed under this permit. Separate permits required for renovation - sfd Date: March 5, 2014 Contractor: Kitchen And Bath Install Llc Client: Ww Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 522619 | |||||
Interior renovations of existing condo unit, upgrades to finishes, new updates, as per submitted plans. Date: August 11, 2010 Client: Sofmic Rittenhouse Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 4, 2010 | Permit id: 294687 | |||||
SCORE 100 Install switches, 28 hi-hats, light fixtures, relocate 8 switches & receptacles. Date: September 7, 2010 Contractor: Davis Jerry Inc Client: Sofmic Rittenhouse Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2010 | Permit id: 299818 | |||||
SCORE 100 Install basin, reinstall toilet and install bidet toilet seat Date: October 29, 2010 Contractor: Adelphia Plumbing And Htng Corp Client: Sofmic Rittenhouse Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 4, 2010 | Permit id: 308828 | |||||
SCORE 95 Relocation of (7) sprinkler heads Date: October 29, 2010 Contractor: S A Comunale Co Inc Client: Sofmic Rittenhouse Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: November 4, 2010 | Permit id: 309253 | |||||
SCORE 100 Unit #2504 - plumbing fixture replacement - replace the water closet, lavatory and shower in the same location(s) Date: March 5, 2014 Contractor: Adelphia Plumbing And Htng Corp Client: Garnick Michael Garnick Denise | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 8, 2015 | Permit id: 521658 | |||||
SCORE 96 Install new lighting and recess light throughout per 2008 nec (condo unit) Date: April 10, 2014 Contractor: Sl Construction Llc Client: Garnick Michael Garnick Denise | Permit type: Electrical permit | Permit status: Expired | Completion date: November 17, 2014 | Permit id: 529773 | |||||
SCORE 100 Relocate existing fire sprinkler heads to accomodate new wall ceiling layout in unit 2504. Date: April 10, 2014 Contractor: Metropolitan Fire Protection Client: Garnick Michael Garnick Denise | Permit type: Suppression permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 529944 | |||||
SCORE 99 Install ductwork 16 cfms(condo) Date: April 10, 2014 Contractor: Airtight Heating And Cooling Inc Client: Garnick Michael Garnick Denise | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 529974 | |||||
SCORE 100 Repair existing ceiling with tray ceiling remove and replace existing bathroom no new partitions. No other work allowed under this permit. Separate permits required for renovation - sfd Date: January 9, 2015 Contractor: Kitchen And Bath Install Llc Client: Garnick Michael Garnick Denise | Permit type: Alteration permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 583755 | |||||
SCORE 100 Installation of eleven convenience outlets per 2008 nec (condo) Date: February 20, 2013 Contractor: William Torchiana Iii Client: Silberberg Aviva Yefet | Permit type: Electrical permit | Permit status: Expired | Completion date: February 20, 2013 | Permit id: 454445 | |||||
SCORE 100 Replace 38 light fixtures ( recessed, 12 ceiling, and 6 wall) throughout condo per 2008 nec (condo) Date: January 29, 2013 Contractor: Donald A Pusey Inc Client: Maas Trust Shotz Mitchell | Permit type: Electrical permit | Permit status: Expired | Completion date: January 29, 2013 | Permit id: 450602 | |||||
SCORE 100 Rewire 2 hvac fan coils,insall 2 dedicated gfis,7 general receptacles,8 switches,6-3way switches,2 jam switches,22 recessed lights,5 wall scones and relocate existing panel box (condo unit) Date: December 2, 2015 Contractor: Northstar Electrical Services Client: Probinsky Richard Probinsky Beth | Permit type: Electrical permit | Permit status: Completed | Completion date: June 29, 2016 | Permit id: 653751 | |||||
SCORE 100 Replace 11-existing fixtures,21-existing switches, fishing from existing recepts to add 4-recepts as per nec 2008 cc district Date: August 23, 2016 Contractor: Donald A Pusey Inc Client: N Lawrence Dion Deborah | Permit type: Electrical permit | Permit status: Expired | Completion date: August 23, 2016 | Permit id: 716777 | |||||
Fit out raw space to create corridor and 4 residential condo units @ 30th floor. (see ap #464444 for plans for both 29th and 30th floors) Date: May 15, 2013 Client: Golomb Richard Golomb Marci | Permit type: Alteration permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 464464 | |||||
SCORE 100 Level 1 alteration: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose. For interior alterations to renovate an existing unit 1204 space. This work activity shall be performed by contractors & sub-contractors licensed by the city of philadelphia. Contact inspector at district office prior to starting work. Separate permits required for plumbing, electric and hvac. Date: January 29, 2016 Contractor: Kitchen And Bath Install Llc Client: Russell Jennifer L | Permit type: Alteration permit | Permit status: Completed | Completion date: December 15, 2016 | Permit id: 666829 | |||||
SCORE 95 Int alt to expand livingroom. Drywall patitions, int finisheds-sfd Date: October 31, 2012 Contractor: Turner Construction Company Client: Thorne Stephen A Thorne Sabrina Tamburino | Permit type: Alteration permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 428962 | |||||
SCORE 93 Replace light fixture, remove unused wiring from old sound system & cable as per nec 2008 (high rise mixed use) Date: April 29, 2014 Contractor: Sharpe Inc Client: Scher Howard D | Permit type: Electrical permit | Permit status: Expired | Completion date: April 29, 2014 | Permit id: 533459 | |||||
SCORE 100 Install (15) light fixtures on existing junction boxes, install ten dimmers at existing locations.... In accordance with 2008 nec Date: May 21, 2010 Contractor: A T B Electric Inc Client: Kamens Matthew H Tr | Permit type: Electrical permit | Permit status: Expired | Completion date: May 21, 2010 | Permit id: 276323 | |||||
SCORE 77 No change in use and occupancy classification. Interior alterations (prescriptive method) to decrease the size of dwelling unit 2101 and increase the size of dwelling unit 2102. Separate permit required for any mep and fire suppression work. Date: August 28, 2017 Contractor: Sci Construction Group Client: N Lawrence Dion Deborah | Permit type: Alteration permit | Permit status: Active | Completion date: September 29, 2017 | Permit id: 799923 | |||||
SCORE 100 Replacement of lavy sink and adjacent piping to redmain as is - the installation will compy with the philadelphia plumbing code 2004 Date: August 29, 2017 Contractor: Alexander Burik Client: N Lawrence Dion Deborah | Permit type: Plumbing permit | Permit status: Active | Completion date: September 19, 2017 | Permit id: 812251 | |||||
Installation of five retractable awnings over existing balconies at unit # 3102 as per plans. 1 dwelling units with accessory parking garage with commercial retail uses as approved as part of an existing with all other uses as previously approved. Date: July 24, 2012 Client: Thorne Stephen A Thorne Sabrina Tamburino | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 24, 2012 | Permit id: 415894 | |||||
SCORE 95 For the replacement of windows along the facade of an existing historic building. All work to be done per approved plans. If field condition vary contact design professional prior to the start of any work. Separate permits required for all other work. Date: July 18, 2014 Contractor: Turner Construction Company Client: Hopefull Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 14, 2015 | Permit id: 537499 | |||||
Interior alterations as per approved plans to construct a common corridor and to create a display area of sample dwelling units. Separate permit required for certificate of occupancy for future residential units. All work shall be done in accordance with approved plans. Date: November 30, 2012 Client: Buonconvento Investments | Permit type: Alteration permit | Permit status: Completed | Completion date: January 22, 2013 | Permit id: 439309 | |||||
Fit out raw space to create corridor and 4 residential condo units Date: May 15, 2013 Client: Giroux Claude | Client Company: Ofs | Permit type: Alteration permit | Permit status: Completed | Completion date: January 16, 2014 | Permit id: 464444 | |||||
SCORE 100 Relocate 2 heads for homeowner alterations Date: March 26, 2014 Contractor: Metropolitan Fire Protection Client: Golomb Richard Golomb Marci | Permit type: Suppression permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 526660 | |||||
SCORE 100 Furnish and install 1 bathroom,2 powder room,1 kitchen sink,1 laundry tray,3 toilet,3 lavs,1 shower and 1 bath tub all sanitary connected to existing stacks (mixed use) Date: December 19, 2013 Contractor: Bbj Mechanical Inc Client: Rittenhouse Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 512036 | |||||
"condominium fit out on the 31st floor." permit to include the installation of non combustible partitions, ceilings, and soffits to create a residential living space on the 31st floor unit d. Separate permits required for plumbing, electrical teledata, mechanical, and fire suppression work. Date: February 8, 2010 Client: Rittenhouse Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 12, 2010 | Permit id: 258592 | |||||
SCORE 100 Install new sanitary, vent and water lines for 2- pantry sinks, including a new electrical water heater at each sink Date: October 7, 2015 Contractor: Bofinger And Breslin Client: Canter Mary | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 17, 2015 | Permit id: 643265 | |||||
SCORE 100 Amend permit #503915 to show changes to the floor plan layout on the 31st floor as per plans. Date: January 15, 2014 Contractor: Intech Construction Inc Client: Rittenhouse Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 22, 2014 | Permit id: 509389 | |||||
SCORE 100 Alterations to duct work, diffusers, new fan units, as per submmitted plan for extg dwelling unit. Connect to existing system in conjunction with alterations fit out permit ap258592 Date: June 3, 2010 Contractor: Tracey Mechanical Inc Client: Rittenhouse Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 12, 2010 | Permit id: 281349 | |||||
SCORE 100 Construction of one (1) residential unit. Interior alterations to as per approved plans. Separate permits required for mechanical, electrical, plumbing, and fire supression work. Date: November 8, 2013 Contractor: Intech Construction Inc Client: Rittenhouse Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: April 21, 2014 | Permit id: 503915 | |||||
SCORE 100 Unit #3001 - interior plumbing alterations - reinstall the water closet in the same location, relocate (2)basins and relocate a shower Date: February 4, 2014 Contractor: Adelphia Plumbing And Htng Corp Client: Golomb Richard Golomb Marci | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 518099 | |||||
SCORE 100 Install 22 new recessed lighting,install 6 duplex receptacles,4 switches and relocate cable tv line per 2008 nec (condo unit) Date: April 24, 2017 Contractor: Northstar Electrical Services Client: Scher Karyn | Permit type: Electrical permit | Permit status: Completed | Completion date: July 11, 2017 | Permit id: 777488 | |||||
SCORE 95 Relocate 15 heads in the unit due to new walls and ceiling heights. Date: May 15, 2015 Contractor: S A Comunale Co Inc Client: Rittenhouse Smc Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 610463 | |||||
SCORE 100 Install & wire door security locations at 5 locations, install eqipment and devices, wire 2 power supplies as per 2008 nec (cc district) install fire alarm modules as per nfpa72 Date: May 17, 2017 Contractor: Par 4 Electric Corp Inc Client: Rittenhouse Smc Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 7, 2017 | Permit id: 776849 | |||||
SCORE 100 Relocate water and waste piping for (4)water closets, (5)lavatories, (3)showers and a clothes washing machine - the installation will comply with the philadelphia plumbing code 2004 Date: April 6, 2015 Contractor: Adelphia Plumbing And Htng Corp Client: Rittenhouse Smc Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 2, 2015 | Permit id: 600683 | |||||
SCORE 100 For the removal of ten (10) fan coil units and associated piping (no new units proposed at this time) and for the relocation of piping. All work per approved plans. Separate permit required for new hvac equipment and ductwork, electrical, and plumbing. Date: April 3, 2014 Contractor: Chadwick Service Company Client: Hopefull Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 14, 2015 | Permit id: 519246 | |||||
SCORE 100 Installation of ductwork, grilles, registers and diffusers on existing fan coil units per plans; all work limited to interior of building; no exterior modifications. Separate electrical and plumbing permits required. Date: July 24, 2013 Contractor: Edward B Oreilly And Assoc Inc Client: Giroux Claude | Client Company: Ofs | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 479477 | |||||
SCORE 100 Construction of two residential dwelling units and common corridor in existing vacant space on 28th floor as per plans. Date: July 25, 2013 Contractor: Intech Construction Inc Client: Buonconvento Investments | Permit type: Alteration permit | Permit status: Completed | Completion date: July 3, 2014 | Permit id: 470602 | |||||
SCORE 100 Install owner supplied control 4 smart switches, relocate wiring for renovated mater bath and install lighting and power for automated shades as per nec 2008 (cc district) Date: February 20, 2014 Contractor: Donald A Pusey Inc Client: Golomb Richard Golomb Marci | Permit type: Electrical permit | Permit status: Completed | Completion date: January 7, 2015 | Permit id: 520394 | |||||
SCORE 99 Install and wire 44 recessed lt fixtures, 19 switches, 24 recpts, 1 30amp 208v outlet, 60amp sub panel and 2 exhaust fans as per 2008 nec (multifamily) Date: April 9, 2013 Contractor: City Electric Corp Client: Lehr Ellyn | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 460013 | |||||
SCORE 100 Install ductwork and piping to existing equipment as per plans. Date: January 24, 2014 Contractor: Edward B Oreilly And Assoc Inc Client: Rittenhouse Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 512385 | |||||
SCORE 100 Install electric baseboard heater 1,relocate gfi 3, replace toggles w. Dimmers 10,install new penden lgt 3, install new recpt 4,install new recessed lgt 27, install power for windows shades (condo) as per nec 2008 Date: January 3, 2013 Contractor: Northstar Electrical Services Client: Goldberg Brett Goldberg Brian | Permit type: Electrical permit | Permit status: Completed | Completion date: July 27, 2013 | Permit id: 446081 | |||||
SCORE 93 Relocate (4) sprinkler heads for the new renovations. Date: August 30, 2017 Contractor: Mk Fire Protection And Supply Client: N Lawrence Dion Deborah | Permit type: Suppression permit | Permit status: Active | Completion date: September 20, 2017 | Permit id: 812496 | |||||
SCORE 100 Temporary certificate of occupancy for unit 3103 only. Date: April 15, 2014 Contractor: Intech Construction Inc Client: Rittenhouse Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: April 25, 2014 | Permit id: 530536 | |||||
SCORE 77 No change in use and occupancy classification. Interior alterations (prescriptive method) to decrease the size of dwelling unit 2101 and increase the size of dwelling unit 2102. Separate permit required for any mep and fire suppression work. See ap#799923 for approved plans. Date: August 28, 2017 Contractor: Sci Construction Group Client: N Lawrence Dion Deborah | Permit type: Alteration permit | Permit status: Active | Completion date: September 29, 2017 | Permit id: 806921 | |||||
SCORE 100 Lighting renovation throughout condominim to including fixtures, switches, tv jacks, and receptacles per 2008 nec (condo) Date: November 30, 2012 Contractor: Donald A Pusey Inc Client: Seven C & J Company Limit | Permit type: Electrical permit | Permit status: Expired | Completion date: November 30, 2012 | Permit id: 440692 | |||||
SCORE 100 Level ii interior alterations to construct three residential units on existing 28th floor as per approved plans. Separate permits required for any mep & fire suppression work Date: January 8, 2014 Contractor: Intech Construction Inc Client: Buonconvento Investments | Permit type: Alteration permit | Permit status: Completed | Completion date: July 3, 2014 | Permit id: 511680 | |||||
SCORE 99 Interior alteraions to include hvac Date: April 3, 2013 Contractor: A J Lewis Corp Client: Ernick Scott Vernick Elizabeth Halpert | Permit type: Alteration permit | Permit status: Completed | Completion date: August 1, 2013 | Permit id: 458868 | |||||
SCORE 100 Relocate existing shower, sink, 3 lavs and 2 w cs Date: April 5, 2013 Contractor: Adelphia Plumbing And Htng Corp Client: Ernick Scott Vernick Elizabeth Halpert | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 462474 | |||||
SCORE 100 Remove 11 fixtures and replace when ceiling is replaced no fa or telecommunication per 2008 nec (condo bldg) Date: February 7, 2014 Contractor: Gordon Group Electric Client: Hopefull Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 518813 | |||||
SCORE 100 Relocate electrical box,refeed needed circuits,install new recepts,recesses lighting and switches as per 2008 nec(cc district) relocate existing fire alarm device as per nfpa72 Date: April 13, 2015 Contractor: Northstar Electrical Services Client: Rittenhouse Smc Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: April 13, 2015 | Permit id: 595565 | |||||
SCORE 95 Relocate (4) sprinkler heads. (condo unit) Date: February 11, 2016 Contractor: S A Comunale Co Inc Client: Probinsky Richard Probinsky Beth | Permit type: Suppression permit | Permit status: Completed | Completion date: July 2, 2016 | Permit id: 669283 | |||||
SCORE 89 Interior demolition and interior renovations as per plans for prior units 1803 & 1804. No change in use occupancy Date: February 27, 2015 Contractor: Aj Lewis Contracting Corp Client: Rittenhouse Smc Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 2, 2015 | Permit id: 591607 | |||||
SCORE 100 Furnish and install 103 category 6 plenum cables average cable length 175 feet. Furnish and install 128 category 6a plenum cables average cable length 175 feet per 2008 nec (office space) Date: July 22, 2015 Contractor: Belles Electrical Contractors Client: Seltzer Robert S Seltzer Ellen B | Permit type: Electrical permit | Permit status: Completed | Completion date: March 16, 2017 | Permit id: 617257 | |||||
SCORE 70 T. C. O. In association with building permit 260388 Date: April 9, 2013 Contractor: E B Mahoney Builders Inc Client: Jema 10 33 Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 20, 2013 | Permit id: 463915 | |||||
SCORE 70 Temporary certificate of occupancy for 33rd floor and partial 32nd floor. Date: December 30, 2013 Contractor: E B Mahoney Builders Inc Client: Jema 10 33 Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 513285 | |||||
SCORE 95 Interior alterations as per plans. Separate permit is required for dwelling units fit-out and hvac work. Date: January 24, 2012 Contractor: Turner Construction Company Client: Hopefull Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: February 10, 2016 | Permit id: 379148 | |||||
SCORE 100 Install two receptacles on new driving wall that will reduce the size of dwelling unit 2102 and also split up lighting circuit to control six recessed fixtures on the dwelling unit 2102 side as per nec 2008 cc district Date: September 14, 2017 Contractor: Anthony Franzini Client: N Lawrence Dion Deborah | Permit type: Electrical permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 816152 | |||||
SCORE 100 Replace 2-toilets, 2-showers, 3-basins, bathtub Date: December 28, 2015 Contractor: Adelphia Plumbing And Htng Corp Client: Probinsky Richard Probinsky Beth | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 29, 2016 | Permit id: 657732 | |||||
SCORE 100 Relocate 8 sprinklers on 28th floor Date: December 20, 2012 Contractor: Oliver Sprinkler Co Inc Client: Buonconvento Investments | Permit type: Suppression permit | Permit status: Completed | Completion date: January 22, 2013 | Permit id: 444620 | |||||
Co only for unit # 2102 Date: December 14, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249288 | |||||
SCORE 70 Installation of 2 retractable awnings over balconies as per plans historical building: awning installation shall comply the plan as approved by the philadelphia historical commission Date: November 22, 2011 Contractor: E B Mahoney Builders Inc Client: Jema 10 33 Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 26, 2012 | Permit id: 364616 | |||||
SCORE 100 Installation of ductwork, grilles, registers and diffusers on existing fan coil units per plans; all work limited to interior of building; no exterior modifications. Separate electrical and plumbing permits required. See permit # 479477 for plans. Date: July 24, 2013 Contractor: Edward B Oreilly And Assoc Inc Client: Golomb Richard Golomb Marci | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 484884 | |||||
Co only for unit # 2101 Date: December 14, 2010 Client: Philadelphia Rittenhouse Developer Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 249287 | |||||
SCORE 100 Proposed one (1) d f banner w brackets "barneys new york". 5-11"x 1-10" (5. 3 sqft);banner height not to exceed the vertical height of (4) existing quoins as per architectural committee. Date: September 26, 2017 Contractor: Ez Signs Llc Client: Adr 1811 Walnut Street Lp | Permit type: Sign permit | Permit status: Completed | Completion date: November 22, 2017 | Permit id: 796802 | |||||
SCORE 96 Installation of (7) trane bchc fan coil units, (1) captive aire a3-g18 make-up air unit, (1) pollution control unit, (1) dishwasher exhaust fan, (2) bathroom exhaust fan, installation of supply, return & bathroom exhaust ductwork, installation of welded black iron kitchen exhaust ductwork, grilles, registers and diffusers Date: August 26, 2010 Contractor: J Rihl Inc Client: Adr 1 South 18th Street | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 294838 | |||||
SCORE 96 Installation of kitchen fixtures & bathroom fixtures per plans, installation of grease interceptor and ellectric 1 gallon hot water heater Date: September 2, 2010 Contractor: J Rihl Inc Client: Adr 1 South 18th Street | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 14, 2011 | Permit id: 295176 | |||||
SCORE 100 Alteration: interior plumbiing; restaurant; 1st and 2nd floor aka 1801-13 walnut spaces 18c1 18c2 - the installation will comply with the philadephia plubming code 2004 Date: August 14, 2017 Contractor: Scott Mechanical Inc Client: Adr 1811 Walnut Street Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 16, 2017 | Permit id: 804867 | |||||
Amend bldg permit 7867 as per approved plans and letter. Date: September 21, 2017 Client: Adr 1811 Walnut Street Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 20, 2017 | Permit id: 809135 | |||||
SCORE 100 Relocating & replacing devices on existing fire alarm system in above space siemens equipment as per nfpa 72 (cc district) Date: September 27, 2017 Contractor: Cascio Electric Client: Adr 1811 Walnut Street Lp | Permit type: Electrical permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 816850 | |||||
SCORE 100 Wire new restaurant - wall sconces, 1 ceiling lgihts, cctv, pos system, led lights around bar & hostess station as per 2008 nec (cc district) Date: September 7, 2017 Contractor: Cascio Electric Client: Adr 1811 Walnut Street Lp | Permit type: Electrical permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 803174 | |||||
SCORE 100 Proposed one (1) d f banner w brackets "barneys new york". 5- 11" x 1-10" (5. 3 sqft) accessory to a previously approved retail space and all other uses as previously approved. Size and location as shown on application plans. Date: September 26, 2017 Contractor: Ez Signs Llc Client: Adr 1811 Walnut Street Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 26, 2017 | Permit id: 796801 | |||||
No change in use and occupancy classification. Interior alterations (level ii) as per approved plans. Separate permit required for any mep and fire suppression work. See ap#291636 for co and lo all work shall be done in accordance with historical commission approval. Envelope and interior lighting to comply with 2009 iecc. Date: June 28, 2017 Client: Adr 1811 Walnut Street Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 786700 | |||||
SCORE 96 Fit out of previously permitted addition shell space on third through fifth floors for two (2) additional dwelling units as per approved plans. Existing building fully sprinklered. Work in accordance with previous bbs variance, case no. 0508-05 issued 06 06 2005 for single exit condition. Separate permits required for mep & fire suppression work Date: March 23, 2016 Contractor: Intech Construction Llc Client: Sfi Rittenhouse Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: August 19, 2017 | Permit id: 657348 | |||||
For interior alterations limited to the demolition interior non-load bearing partition walls and removal of service counters, ceilings, and floor finishing in accordance with submitted plans. (iebc 2009, compliance path: work-area method, lvl ii alterations) separate permits to be required for fit-out. Date: October 5, 2016 Client: Adr 1811 Walnut Street Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 16, 2017 | Permit id: 724514 | |||||
SCORE 94 Install 29 - 4" recessed lights through out the apartment as per 2008 nec (cc district) Date: April 16, 2014 Contractor: Starlight Electric Inc Client: Rounick Natalie | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2014 | Permit id: 531009 | |||||
Electrical permit Date: February 20, 2013 Client: Silberberg Aviva Yefet | Permit status: Expired | Permit id: 454445 | |||||
Plumbing permit Date: March 5, 2014 Client: Garnick Michael Garnick Denise | Permit status: Completed | Permit id: 521658 | |||||
Suppression permit Date: April 10, 2014 Client: Garnick Michael Garnick Denise | Permit status: Completed | Permit id: 529944 | |||||
Electrical permit Date: April 10, 2014 Client: Garnick Michael Garnick Denise | Permit status: Expired | Permit id: 529773 | |||||
Alteration permit Date: January 9, 2015 Client: Garnick Michael Garnick Denise | Permit status: Completed | Permit id: 583755 | |||||
Mechanical permit Date: April 10, 2014 Client: Garnick Michael Garnick Denise | Permit status: Completed | Permit id: 529974 | |||||
Mechanical permit Date: June 3, 2010 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 281349 | |||||
Administrative permit Date: April 24, 2014 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 532435 | |||||
Plumbing permit Date: December 19, 2013 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 512036 | |||||
Suppression permit Date: January 7, 2014 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 514272 | |||||
Alteration permit Date: February 8, 2010 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 258592 | |||||
Electrical permit Date: February 27, 2014 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 516380 | |||||
Alteration permit Date: November 8, 2013 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 503915 | |||||
Mechanical permit Date: January 24, 2014 Client: Rittenhouse Lp | Permit status: Completed | Permit id: 512385 | |||||
Electrical permit Date: January 3, 2013 Client: Goldberg Brett Goldberg Brian | Permit status: Completed | Permit id: 446081 | |||||
Plumbing permit Date: February 20, 2015 Client: Pichini Roberta D | Permit status: Completed | Permit id: 590865 | |||||
Administrative permit Date: April 9, 2013 Client: Jema 10 33 Lp | Permit status: Completed | Permit id: 463915 | |||||
Alteration permit Date: July 25, 2013 Client: Buonconvento Investments | Permit status: Completed | Permit id: 470602 | |||||
Mechanical permit Date: March 14, 2014 Client: Buonconvento Investments | Permit status: Completed | Permit id: 517842 | |||||
Electrical permit Date: April 7, 2014 Client: Buonconvento Investments | Permit status: Completed | Permit id: 522703 | |||||
Plumbing permit Date: March 19, 2014 Client: Buonconvento Investments | Permit status: Completed | Permit id: 518982 | |||||
Alteration permit Date: November 30, 2012 Client: Buonconvento Investments | Permit status: Completed | Permit id: 439309 | |||||
Alteration permit Date: January 8, 2014 Client: Buonconvento Investments | Permit status: Completed | Permit id: 511680 | |||||
Use permit Date: July 25, 2013 Client: Buonconvento Investments | Permit status: Completed | Permit id: 484262 | |||||
Suppression permit Date: December 20, 2012 Client: Buonconvento Investments | Permit status: Completed | Permit id: 444620 | |||||
Administrative permit Date: July 8, 2014 Client: Buonconvento Investments | Permit status: Completed | Permit id: 547210 | |||||
Electrical permit Date: January 29, 2013 Client: Maas Trust Shotz Mitchell | Permit status: Expired | Permit id: 450602 | |||||
Suppression permit Date: March 26, 2014 Client: Golomb Richard Golomb Marci | Permit status: Completed | Permit id: 526660 | |||||
Alteration permit Date: May 15, 2013 Client: Golomb Richard Golomb Marci | Permit status: Completed | Permit id: 464464 | |||||
Plumbing permit Date: February 4, 2014 Client: Golomb Richard Golomb Marci | Permit status: Completed | Permit id: 518099 | |||||
Mechanical permit Date: July 24, 2013 Client: Golomb Richard Golomb Marci | Permit status: Completed | Permit id: 484884 | |||||
Electrical permit Date: February 20, 2014 Client: Golomb Richard Golomb Marci | Permit status: Completed | Permit id: 520394 | |||||
Alteration permit Date: November 25, 2015 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 651119 | |||||
Suppression permit Date: February 11, 2016 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 669283 | |||||
Plumbing permit Date: December 28, 2015 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 657732 | |||||
Plumbing permit Date: April 5, 2013 Client: Donohoe Kevin F Donohoe Elizabeth G | Permit status: Completed | Permit id: 462474 | |||||
Alteration permit Date: April 3, 2013 Client: Donohoe Kevin F Donohoe Elizabeth G | Permit status: Completed | Permit id: 458868 | |||||
Alteration permit Date: March 5, 2014 Client: Ww Llc | Permit status: Completed | Permit id: 522619 | |||||
Electrical permit Date: September 7, 2010 Client: Sofmic Rittenhouse Llc | Permit status: Completed | Permit id: 299818 | |||||
Suppression permit Date: October 29, 2010 Client: Sofmic Rittenhouse Llc | Permit status: Completed | Permit id: 309253 | |||||
Alteration permit Date: August 11, 2010 Client: Sofmic Rittenhouse Llc | Permit status: Completed | Permit id: 294687 | |||||
Plumbing permit Date: October 29, 2010 Client: Sofmic Rittenhouse Llc | Permit status: Completed | Permit id: 308828 | |||||
Electrical permit Date: February 7, 2014 Client: Hopefull Llc | Permit status: Completed | Permit id: 518813 | |||||
Alteration permit Date: January 24, 2012 Client: Hopefull Llc | Permit status: Expired | Permit id: 379148 | |||||
Alteration permit Date: July 18, 2014 Client: Hopefull Llc | Permit status: Completed | Permit id: 537499 | |||||
Mechanical permit Date: April 3, 2014 Client: Hopefull Llc | Permit status: Completed | Permit id: 519246 | |||||
Alteration permit Date: March 23, 2016 Client: Sfi Rittenhouse Llc | Permit status: Active | Permit id: 657348 | |||||
Alteration permit Date: November 22, 2011 Client: Jema 10 33 Lp | Permit status: Completed | Permit id: 364616 | |||||
Zoning use permit Date: November 22, 2011 Client: Jema 10 33 Lp | Permit status: Completed | Permit id: 364623 | |||||
Electrical permit Date: April 9, 2013 Client: Lehr Ellyn | Permit status: Completed | Permit id: 460013 | |||||
Suppression permit Date: February 11, 2016 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 669276 | |||||
Electrical permit Date: December 2, 2015 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 653751 | |||||
Plumbing permit Date: December 28, 2015 Client: Probinsky Richard Probinsky Beth | Permit status: Completed | Permit id: 657737 | |||||
Electrical permit Date: January 19, 2010 Client: Canter Mary | Permit status: Expired | Permit id: 256095 | |||||
Plumbing permit Date: October 7, 2015 Client: Canter Mary | Permit status: Completed | Permit id: 643265 | |||||
Electrical permit Date: July 22, 2015 Client: Seltzer Robert S Seltzer Ellen B | Permit status: Expired | Permit id: 617257 | |||||
Electrical permit Date: August 23, 2016 Client: Dion Lawrence Dion Deborah | Permit status: Active | Permit id: 716777 | |||||
Electrical permit Date: April 13, 2015 Client: Rittenhouse Smc Llc | Permit status: Expired | Permit id: 595564 | |||||
Suppression permit Date: May 15, 2015 Client: Rittenhouse Smc Llc | Permit status: Completed | Permit id: 610463 | |||||
Alteration permit Date: October 31, 2012 Client: Thorne Stephen A Thorne Sabrina Tamburino | Permit status: Completed | Permit id: 428962 | |||||
Zoning use permit Date: July 24, 2012 Client: Thorne Stephen A Thorne Sabrina Tamburino | Permit status: Completed | Permit id: 415894 | |||||
Mechanical permit Date: July 24, 2013 Client: Giroux Claude | Client Company: Ofs | Permit status: Completed | Permit id: 479477 | |||||
Alteration permit Date: May 15, 2013 Client: Giroux Claude | Client Company: Ofs | Permit status: Completed | Permit id: 464444 | |||||
Electrical permit Date: April 13, 2015 Client: Rittenhouse Smc Llc | Permit status: Expired | Permit id: 595565 | |||||
Plumbing permit Date: April 6, 2015 Client: Rittenhouse Smc Llc | Permit status: Completed | Permit id: 600683 | |||||
Alteration permit Date: February 27, 2015 Client: Rittenhouse Smc Llc | Permit status: Completed | Permit id: 591607 | |||||
Alteration permit Date: October 5, 2016 Client: Adr 1811 Walnut Street Lp | Permit status: Active | Permit id: 724514 | |||||
Electrical permit Date: April 16, 2014 Client: Rounick Natalie | Permit status: Completed | Permit id: 531009 | |||||
Electrical permit Date: November 30, 2012 Client: Seven C & J Company Limit | Permit status: Expired | Permit id: 440692 | |||||
Mechanical permit Date: August 26, 2010 Client: Adr 1 South 18th Street | Permit status: Completed | Permit id: 294838 | |||||
Plumbing permit Date: September 2, 2010 Client: Adr 1 South 18th Street | Permit status: Completed | Permit id: 295176 | |||||
Alteration permit Date: January 29, 2016 Client: Russell Jennifer L | Permit status: Completed | Permit id: 666829 | |||||
Electrical permit Date: April 29, 2014 Client: Scher Howard D | Permit status: Expired | Permit id: 533459 | |||||
Electrical permit Date: May 21, 2010 Client: Kamens Matthew H Tr | Permit status: Expired | Permit id: 276323 |