Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 2 bores across broadway and ot trenching (dirt only) Date: November 24, 2003 Contractor: Xcel Client: R Name | Applicant: Xcel | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 86 Place 1 buried cable and 1-4 conduit from an existing manhole to a new pedestal at an existing pole, approximately 218 Date: August 25, 2003 Contractor: Utilx Corporation Client: R Name | Applicant: Utilx Corporation | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 86 Place 1 buried cable and 1-4foot conduit from an existing manhole to a new pedestal at an existing pole, approximately 218foot Date: August 25, 2003 Contractor: Utilx Corporation Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-03591 | |||||
SCORE 95 2 bores across broadway and 20foot ot trenching (dirt only) Date: November 24, 2003 Contractor: Xcel Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-04333 | |||||
SCORE 100 Tree trim & install fiber optic on existing overhead xcel electric poles Date: July 14, 2008 Contractor: Xcel Energy Client: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Uptown broadway warranty work. Raise water valves & fire hydrant, r&r concrete & final lift asphalt the south end of 14th. Date: August 20, 2008 Contractor: Shaw Construction Company Client: R Name | Applicant: Shaw Construction Company | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Access to manhole for splicing 2 days Date: September 7, 2012 Contractor: Qwest Comm Centurylink Client: R Name | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss |