Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 955 Lenfant Plaza Sw Washington Dc Install 117 (1) 4" pvc conduit e/w (3) 1-1/4" innerducts and (1) 36 fiber in the right-of-way for d street sw by trenching. Remove and restore 3 sq. Ft. Of asphalt and concrete sidewalk. Install (1) 4x4x4 manhole. Date: October 21, 2013 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; telecom ml conduits (trench), excavation; boring test pit (single), excavation; manhole installation | Permit status: Approved (pending payment | Expiration date: February 14, 2014 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Date: August 17, 2014 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: November 20, 2014 | Permit id: Pa99093 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Date: October 30, 2014 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) | Permit status: Revoked | Expiration date: January 19, 2015 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Date: October 30, 2014 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) | Permit status: Revoked | Expiration date: January 19, 2015 | |||||
SCORE 86 955 Lenfant Plaza Sw Washington Dc Install 117 (1) 4" pvc conduit e w (3) 1-1 4" innerducts and (1) 36 fiber in the right-of-way for d street sw by trenching. Remove and restore 3 sq. Ft. Of asphalt and concrete sidewalk. Install (1) 4x4x4 manhole. Date: October 21, 2013 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; telecom ml conduits (trench), excavation; boring test pit (single), excavation; manhole installation | Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Date: October 29, 2014 Contractor: Zayo Group By Troy Scroggin Permit status: Expired | Expiration date: November 14, 2014 | Permit id: Pa10165618 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) Contractor: Zayo Group By Troy Scroggin Permit status: 5 | Expiration date: January 19, 2015 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 955 Lenfant Plaza Sw Washington Dc Excavation; telecom ml conduits (trench), excavation; boring test pit (single), excavation; manhole installation Contractor: Zayo Group By Troy Scroggin Permit status: 3 | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 86 955 Lenfant Plaza Sw Washington Dc Install 117 (1) 4" pvc conduit e w (3) 1-1 4" innerducts and (1) 36 fiber in the right-of-way for d street sw by trenching. Remove and restore 3 sq. Ft. Of asphalt and concrete sidewalk. Install (1) 4x4x4 manhole. Contractor: Zayo Group By Troy Scroggin Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Contractor: Zayo Group By Troy Scroggin Permit status: Revoked | Expiration date: January 19, 2015 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Date: October 29, 2014 Contractor: Zayo Group By Troy Scroggin Permit status: Permit expired | Expiration date: November 19, 2014 | Permit id: Pa10165627 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 955 Lenfant Plaza Sw Washington Dc Excavation; telecom ml conduits (trench), excavation; boring test pit (single), excavation; manhole installation Contractor: Zayo Group By Troy Scroggin Permit status: 3 | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) Contractor: Zayo Group By Troy Scroggin Permit status: 5 | Expiration date: January 19, 2015 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Notpaid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 955 Lenfant Plaza Sw Washington Dc Install 117 (1) 4" pvc conduit e w (3) 1-1 4" innerducts and (1) 36 fiber in the right-of-way for d street sw by trenching. Remove and restore 3 sq. Ft. Of asphalt and concrete sidewalk. Install (1) 4x4x4 manhole. Contractor: Zayo Group By Troy Scroggin Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 86 M Street Se Washington Dc 1. Trench to place 96 (3) 1-1/4" hdpe e/w (1) 432 fiber in the intersection of s. Capitol and i streets sw. 2. Trench to place 258 (3) 1-1/4" hdpe e/w (1) 72 fiber and (1) 4x4x4 manhole along half street se from l street se to the building at m street se. Date: October 28, 2013 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; manhole installation, excavation; telecom ml conduits (trench), excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 6, 2014 | Permit id: Pa88400 | |||||
SCORE 86 34 Massachusetts Avenue Nw Washington Dc 3 boring test pits, install (1) 4x4x4 manhole w side of massachusetts ave nw; then, 1 of 2 options; option 1: trench to install 55 (2) 1-1/4" hdpe e/w (1) 144 fiber. Option 2: trench to install 65 (2) 1-1/4" hdpe e/w (1) 144 fiber. Date: September 2, 2014 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: November 27, 2014 | Permit id: Pa99770 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Contractor: Zayo Group By Troy Scroggin Permit status: Revoked | Expiration date: January 19, 2015 | Permit id: 0 | |||||
SCORE 86 11 1199 Block Of 1st Street Se Washington Dc Trench from existing verizon foc manhole on l street se to install 838 new conduit and 3 manhole at first and l streets se; directional bore and trench to install new conduit south on first street se and new manhole just s of m street se; trench from existing verizon manhole at half and n streets se to install new conduit and manhole. Date: August 17, 2014 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; manhole installation, excavation; telecom connection (trench), excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: November 20, 2014 | Permit id: Pa99093 | |||||
SCORE 86 1675 M Street Nw Washington Dc Trench to place 54 (2) 1-1/2" hdpe e/w (1) 72 fiber across m street nw, from an existing zayo handhole in front of 1145 17th street nw to the parking garage next to 1675 m street nw. Remove and replace 84 sq. Ft. Of asphalt and 24 sq. Ft. Of brick pavers. See plans for details. Date: August 21, 2015 Contractor: Zayo Group By Troy Scroggin Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: December 11, 2015 | Permit id: Pa114781 | |||||
SCORE 86 Date: December 31, 2013 Contractor: Zayo Group By Troy Scroggin Permit status: Permit expired | Expiration date: February 5, 2014 | Permit id: Pa10125268 | |||||
SCORE 86 Date: January 3, 2014 Contractor: Zayo Group By Troy Scroggin Permit status: Permit expired | Expiration date: February 4, 2014 | Permit id: Pa10125175 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Date: October 23, 2014 Contractor: Zayo Group By Troy Scroggin Permit status: Permit expired | Expiration date: November 29, 2014 | Permit id: Pa10164104 | |||||
SCORE 86 Contractor: Zayo Group By Troy Scroggin Permit status: Not paid | Expiration date: December 9, 2014 | Permit id: 0 | |||||
SCORE 86 Date: October 9, 2015 Contractor: Zayo Group By Troy Scroggin Permit status: Permit expired | Expiration date: November 6, 2015 | Permit id: Pa10212399 |