Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 181183 Bowdoin St Dorchester Ma Sidewalk deposit during construction. This is not a permit to excavate occupy or install driveway openings - separate permits and approvals are required. Deposit will be held until all construction is complete and the site is in walk-away condition. Upon written request a pwd engineer will inspect the restored public way to verify the completed work meets city and ada standards. [ sidewalk slope 2% or less]; ; permit: 60. 00; ;inspection:;100. 00; ;deposit:; 5. 143. 20 Date: November 29, 2016 Contractor: Xing Ying Yang For Ming Ha Permit type: Sidewalk deposit | Permit id: Sdep-660714 | Parcel: 1500999000 |