Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 60 2619 Woodley Pl Nw, Washington, Dc 20008 Removing ceramic tile in 3 bathrooms. To include vanities and toilets. Installing new ceramic tile in 3 bathrooms and reconnecting new vanities and toilets to the original supply and drain lines. Toilets and vanities to be in the exact location and the same size as currently stands. All in-kind. Date: June 13, 2014 Contractor: Wooten Client: Lebaron | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1408584 | |||||
SCORE 60 2114 4th St Ne, Washington, Dc 20002 Remove old rubber membrane and intstall new tpo membrane on top of main roofr only Date: August 22, 2012 Contractor: Wooten Client: L Wooten | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1213245 |