Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 4073 El Camino Real, Palo Alto, Ca 94306 Commercial add (4) modules 1. 12kw to existing photvoltaic system 12. 1kw (13000-02838) Date: September 16, 2015 Contractor: Wong Green Tech Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-02443 | |||||
SCORE 84 241 Fulton St, Palo Alto, Ca 94301 Residential (12) pv panel system 3. 7kw, service upgrade to 200a, upgrade (e) subpanel to 200a Date: April 7, 2015 Contractor: Wong Green Tech Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00849 | |||||
SCORE 84 4073 El Camino Real, Palo Alto, Ca 94306 13-2838: solar panel model & inverter model change; ocpd breaker size changed to 25a; use weeb as grounding method Date: February 12, 2014 Contractor: Wong Green Tech Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00092 | |||||
SCORE 84 4073 El Camino Real, Palo Alto, Ca 94306 New pv system on mixed use building. 9. 9kw, (2) separate attached canopies to be installed between buildings at rooftop by others Date: October 23, 2013 Contractor: Wong Green Tech Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02838 | |||||
SCORE 84 Date: August 15, 2016 Contractor: Wong Green Tech Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02045 | |||||
SCORE 84 4073 El Camino Real, Palo Alto, Ca 94306 San Diego Ca 13-2838: solar panel model & inverter model change; ocpd breaker size changed to 25a; use weeb as grounding method Date: February 12, 2014 Contractor: Wong Green Tech Permit status: Permit issued | Permit id: 14rev-00092 | |||||
SCORE 84 4073 El Camino Real, Palo Alto, Ca 94306 San Diego Ca New pv system on mixed use building. 9. 9kw, (2) separate attached canopies to be installed between buildings at rooftop by others Date: October 23, 2013 Contractor: Wong Green Tech Permit status: Permit issued | Permit id: 13000-02838 | |||||
SCORE 84 241 Fulton St, Palo Alto, Ca 94301 San Diego Ca Residential (12) pv panel system 3. 7kw, service upgrade to 200a, upgrade (e) subpanel to 200a Date: April 7, 2015 Contractor: Wong Green Tech Permit status: Permit issued | Permit id: 15000-00849 |