Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Client: Blue Ridge Bio Fuels | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02002 | Parcel: 14205 | |||||
SCORE 86 Client: Biltmore Oil Company | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-03376 | Parcel: 15625 | |||||
SCORE 86 425 Broadway St, Asheville, Nc 28801 Removal of all tanks, dispensers, canopy. All petro equipment and all wiring connected with the system. Backfill to grade level Date: May 31, 2016 Contractor: Williams Installation Spec Client: Biltmore Oil Co. | Permit type: Com: demo | Permit status: Finaled | Current use: Commercial | Permit id: 15-15618 | Parcel: 27812 | |||||
SCORE 86 425 Broadway St, Asheville, Nc 28801 Removal of all tanks, dispensers, canopy. All petro equipment and all wiring connected with the system. Backfill to grade level Contractor: Williams Installation Spec Client: Biltmore Oil Co. | Permit type: Fire prevention | Permit status: Expired | Current use: Fire | Permit id: 15-15621 | Parcel: 27812 | |||||
SCORE 86 Client: Eblem Short Stop #2 | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 11-04860 | Parcel: 15625 | |||||
SCORE 86 Contractor: Williams Installation Spec Permit status: Expired | Permit id: 15-15621 | Parcel: 27812 | |||||
SCORE 86 2 Fairview Rd, Asheville, Nc 28803 October 1, 2009 9:22:12 am ssalyer. Removal of 7 above ground oil tanks, above ground ground piping wants to leave under ground piping and removing dock from anchor bolts will be leaving footers for rankin patterson oil co.;sls creating grading waiver stated no land disturbance except for digging small hole to place bucket in when cutting lines to catch overflow;if needing to remove the underground lines will need to amend permit to add addiitonal land disturbance to determine if needs full permit or not;sls; october 22, 2009 8:55:09 am ssalyer. Added a flood permit will need to have review and pay fees no cc to be issued until completed;sls ss called keith and informed needed to add flood permit and pay fees told him would call to come pick up flood permit when approved; verify flood fees 200. Or 500. 00;sls placed permit on hold per engineering can not proceed with work called keith back and informed to call ray tracey;sls; october 1, 2009 9:35:03 am ssalyer. Engineering inspections Client: Rankin Patterson Oil Co | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-04978 | Parcel: 20222 | |||||
SCORE 86 Date: July 11, 2016 Contractor: Williams Installation Spec Permit status: Expired | Permit id: 15-15621 | Parcel: 27812 |