Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 76 18 I Street Nw Washington Dc Proposed work will include new ddot standard concrete sidewalk that will replace in-kind the existing sidewalk, to facilitate new utility connections. The existing bike rack and 2 existing street signs (as shown on the plans) will need to be removed and reinstalled to facilitate the installation of a new fire hydrant. The existing buildings main entrance will be renovated as part of the scope of this project, and as such, the new entrance doors will swing into public space. However, we are pursuing the exception as outlined in chapter 32, section 3202. 11. 4. 1 of the dc building code supplement. Per this section, permanent doors are permitted to open outward as long as they do not project past the existing faade projections. Since we have existing bay windows projecting into public space, and our proposed doors do not swing further than the existing projections. A new marquee is proposed at the main entrance as well. This new marquee will extend approximately 9. 16 into public space, but Date: January 19, 2016 Contractor: Will Lattanzio Wiles Mensch Client: Randall Levin | Permit type: Paving; sidewalk(s), fixture; bike rack(s), excavation; fire hydrant(s), projections; marquee | Permit status: Assigned | Expiration date: February 17, 2017 | |||||
SCORE 76 18 I Street Nw Washington Dc Paving; sidewalk(s), fixture; bike rack(s), excavation; fire hydrant(s), projections; marquee Contractor: Will Lattanzio Wiles Mensch Permit status: 12 | Expiration date: February 17, 2018 | Permit id: 0 | |||||
SCORE 76 18 I Street Nw Washington Dc Paving; sidewalk(s), fixture; bike rack(s), excavation; fire hydrant(s), projections; marquee Date: February 8, 2017 Contractor: Will Lattanzio Wiles Mensch Permit status: 8 | Expiration date: February 17, 2017 | Permit id: Pa104508-R1 | |||||
SCORE 76 18 I Street Nw Washington Dc Proposed work will include new ddot standard concrete sidewalk that will replace in-kind the existing sidewalk, to facilitate new utility connections. The existing bike rack and 2 existing street signs (as shown on the plans) will need to be removed and reinstalled to facilitate the installation of a new fire hydrant. The existing buildings main entrance will be renovated as part of the scope of this project, and as such, the new entrance doors will swing into public space. However, we are pursuing the exception as outlined in chapter 32, section 3202. 11. 4. 1 of the dc building code supplement. Per this section, permanent doors are permitted to open outward as long as they do not project past the existing faade projections. Since we have existing bay windows projecting into public space, and our proposed doors do not swing further than the existing projections. A new marquee is proposed at the main entrance as well. This new marquee will extend approximately 9. 16 into public space, but Date: February 8, 2017 Contractor: Will Lattanzio Wiles Mensch Client: Randall Levin | Permit type: Paving; sidewalk(s), fixture; bike rack(s), excavation; fire hydrant(s), projections; marquee | Permit status: Assigned | Expiration date: February 17, 2018 | Permit id: 0 | |||||
SCORE 76 18 I Street Nw Washington Dc Proposed work will include new ddot standard concrete sidewalk that will replace in-kind the existing sidewalk, to facilitate new utility connections. The existing bike rack and 2 existing street signs (as shown on the plans) will need to be removed and reinstalled to facilitate the installation of a new fire hydrant. The existing buildings main entrance will be renovated as part of the scope of this project, and as such, the new entrance doors will swing into public space. However, we are pursuing the exception as outlined in chapter 32, section 3202. 11. 4. 1 of the dc building code supplement. Per this section, permanent doors are permitted to open outward as long as they do not project past the existing faade projections. Since we have existing bay windows projecting into public space, and our proposed doors do not swing further than the existing projections. A new marquee is proposed at the main entrance as well. This new marquee will extend approximately 9. 16 into public space, but Date: January 6, 2015 Contractor: Will Lattanzio Wiles Mensch Client: Randall Levin | Permit type: Paving; sidewalk(s), fixture; bike rack(s), excavation; fire hydrant(s), projections; marquee | Permit status: Permit expired | Expiration date: February 18, 2016 | Permit id: Pa104508 | |||||
SCORE 76 18 I Street Nw Washington Dc Proposed work will include new ddot standard concrete sidewalk that will replace in-kind the existing sidewalk, to facilitate new utility connections. The existing bike rack and 2 existing street signs (as shown on the plans) will need to be removed and reinstalled to facilitate the installation of a new fire hydrant. The existing buildings main entrance will be renovated as part of the scope of this project, and as such, the new entrance doors will swing into public space. However, we are pursuing the exception as outlined in chapter 32, section 3202. 11. 4. 1 of the dc building code supplement. Per this section, permanent doors are permitted to open outward as long as they do not project past the existing faade projections. Since we have existing bay windows projecting into public space, and our proposed doors do not swing further than the existing projections. A new marquee is proposed at the main entrance as well. This new marquee will extend approximately 9. 16 into public space, but Date: July 12, 2017 Contractor: Will Lattanzio Wiles Mensch Permit status: Issued | Expiration date: February 17, 2018 | Permit id: Pa104508-R2 |